Title 13 — PUBLIC UTILITIES›Chapter 13.12 — SEWERS
Article XI — Construction Requirements, Permits, and Fees
Morro Bay Municipal Code · 2026-09 edition · updated 2026-10-02 · Morro Bay
13.12.1100 - Connection permit for annexed territory.¶
13.12.1105 - Annexed territory connection—Computation of cost.¶
13.12.1110 - Annexed territory connection—Existing bonds excepted.¶
13.12.1115 - Main extensions to new customers other than subdivisions.¶
13.12.1120 - Calculation of sewer main extension charges.¶
13.12.1125 - Refunds.¶
13.12.1130 - Main extensions to subdivisions.¶
13.12.1135 - Refunds to subdividers.¶
13.12.1140 - Use of existing sewer.¶
13.12.1145 - Discharge of stormwater, unpolluted drainage and industrial cooling waters.¶
13.12.1150 - Federal and state requirements.¶
13.12.1155 - Sewer charges.¶
13.12.1160 - Sewer use charges.¶
13.12.1165 - Collections.¶
13.12.1170 - Collection of past due accounts.¶
13.12.1175 - Discharging sewage onto city lands.¶
13.12.1180 - Designated sewage dumping places.¶
13.12.1185 - Discharge fees.¶
13.12.1190 - Commercial facilities.¶
13.12.1192 - Private facility—Operation.¶
Get a plain-English answer with a citation back to this text.
Ask AI about this code