Earlier editions: 2026-09
Title 15 — BUILDINGS AND CONSTRUCTION›Chapter 15.04 — CODES ADOPTED
Monrovia Municipal Code § 5.106 Codes Adopted
Monrovia Municipal Code · 2026-10 edition · updated 2026-10-03 · Monrovia
Cite as: Monrovia Municipal Code § 5.106 · Text as of 2026-10-03
5.106.5.3 Electric vehicle (EV) charging.¶
[N] Construction to provide electric vehicle infrastructure and facilitate electric vehicle charging shall comply with Section 5.106.5.3 and shall be provided in accordance with regulations in the California Building Code and the California Electrical Code.
Exceptions:
- On a case by case basis where the local enforcing agency has determined compliance with this section is not feasible based upon one of the following conditions:
a. Where there is no local utility power.
b. Where the local utility is unable to supply adequate power.
c. Where there is evidence suitable to the local enforcement agency substantiating that additional local utility infrastructure design requirements, directly related to the implementation of Section 5.106.5.3, may adversely impact the construction cost of the project.
- Areas of parking facilities served by parking lifts or parking spaces accessible only by automated mechanical car parking systems are not required to comply with this code section.
(Ord. 2022-09, § 3 (part), 2022)
X. ABATEMENT OF DANGEROUS BUILDINGS CODE AMENDMENTS
Get a plain-English answer with a citation back to this text.
Ask AI about this code