Title 4 — PUBLIC WELFARE, SAFETY AND HEALTH
Chapter 3 — MOVING OF BUILDINGS
Modesto Municipal Code · 2026-09 edition · updated 2026-10-02 · Modesto
4-3.01 - Permit Required.¶
4-3.02 - Application for Permit.¶
4-3.03 - Investigation.¶
4-3.04 - When Permit Shall be Denied.¶
4-3.05 - Terms and Conditions of Permit.¶
4-3.06 - Estimate of Cost and Deposit.¶
4-3.07 - Insurance.¶
4-3.08 - Investigation and Permit Fees.¶
4-3.09 - Issuance of Permit.¶
4-3.10 - Suspension or Revocation of Permit.¶
4-3.11 - Control and Supervision.¶
4-3.12 - Thirty-Six to Forty-Eight Hour Notice Required.¶
4-3.13 - Default in Performance of Conditions.¶
4-3.14 - Approval of Route.¶
4-3.15 - Moved Building or Structure to be Placed on Foundation Within Sixty (60) Days.¶
4-3.16 - Obstructing Streets.¶
4-3.17 - Lights and Barricades.¶
4-3.18 - Wires and Structural Supports.¶
4-3.19 - Trees, Plants and Shrubs.¶
4-3.20 - Repairs to Public Property.¶
4-3.21 - Refunding of Deposits.¶
4-3.22 - Appeals.¶
Get a plain-English answer with a citation back to this text.
Ask AI about this code