Skip to content

Earlier editions: 2026-09

Title 8 — BUILDINGS AND CONSTRUCTION

Menifee Municipal Code Ch. 8.08 Electrical Code

Menifee Municipal Code · 2026-10 edition · updated 2026-10-04 · Menifee

Cite as: Menifee Municipal Code Chapter 8.08 · Text as of 2026-10-04

§ 8.08.010 ADOPTION OF ELECTRICAL CODE.

(A) Except as hereinafter changed or modified, the 2025 California Electrical Code as published by the State Building Standards Commission, including all of its chapters (including Chapters 1 through 9), tables, indices, appendices (including appendices A through K), addenda, annexes, and footnotes is hereby adopted by reference as the Menifee Electrical Code and incorporated into this title.

(B) A copy of the 2025 California Electrical Code, including the above-designated appendix, shall be on file in the office of the City Clerk.

(Ord. 2016-205, passed 11-16-2016; Am. Ord. 2019-285, passed 11-20-2019; Am. Ord. 2022- 364, passed 11-16-2022; Am. Ord. 2025-420, passed 9-17-2025)

Exceptions & meaning →

§ 8.08.020 COMMERCIAL PROJECTS.

Annex H, §80.19 (A) is hereby amended by adding the following subsection which reads as follows:

For all commercial projects, a California Licensed Electrical Contractor shall be responsible for obtaining permits for electrical work performed.

(Ord. 2016-205, passed 11-16-2016; Am. Ord. 2019-285, passed 11-20-2019; Am. Ord. 2022- 364, passed 11-16-2022; Am. Ord. 2025-420, passed 9-17-2025)

Exceptions & meaning →

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — Menifee Municipal Code

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.