Title FS — FEE SCHEDULES
Manteca Municipal Code · 2026-07 edition · updated 2026-10-02 · Manteca
FEE SCHEDULES
I. GENERAL FEES. IX. BUILDING SAFETY FEE II. BUSINESS LICENSES. SCHEDULE. III. UTILITIES. X. ENGINEERING FEE SCHEDULE. IV. POLICE DEPARTMENT FEE SCHEDULE. XI. FIRE PREVENTION FEES. V. (RESERVED) XII. PARKS AND RECREATION REVIEW VI. DEVELOPMENT FEES. FEE SCHEDULE. VII. REGIONAL XIII. PLANNING FEE TRANSPORTATION SCHEDULE. IMPACT FEE (RTIF). VIII. VIOLATION OF ADMINISTRATIVE ENFORCEMENT PROVISIONS.
I. GENERAL FEES.
Text read from an image; its layout may differ:
Subject Fee Section
ALARM SYSTEMS
Type of Service 8.04.060
Alarm user permit No charge
1st response in designated period No charge
2nd response in designated period No charge
3rd response in designated period $100.00
4th response in designated period $200.00
5th response in designated period $400.00
Charge for no alarm permit $200.00
Failure for owner to respond $100.00
(Res. R2009-56)
ANIMALS
See also POTBELLY PIG 6.12.110
Adopted animals
Cats 6.16.160
Adoption fee $20.00
Text read from an image; its layout may differ:
Subject Fee Section
Spay/neuter deposit 75.00
Dogs 6.16.110
Adoption fee $20.00
Spay/neuter deposit 75.00
Redemption fees
Cats, goats, rabbits, birds, and other small animals
First impound $20.00 + $10.00/day 6.16.170
Second impound 30.00 + 10.00/day
Three or more impounds 40.00 +10.00/day
Dogs
First impound $40.00 + $10.00/day 6.16.140
Second impound 60.00 + 10.00/day
Three or more impounds 80.00 + 10.00/day
Unregistered dogs 20.00 6.16.130
Out-of-town dogs 20.00 6.16.140
Large animals
Impound $40.00/man hour 6.16.060
Additional daily rate 10.00 + actual time
Registration fees
Dogs
Unaltered 6.08.090
1 year $ 50.00
2 years 75.00
3 years 100.00
(Res. R2010-158)
Spayed, neutered
1-year $20.00 per year 6.08.140
2-year 30.00 per year 6.08.140
3-year 40.00 per year 6.08.140
Late registration penalty 20.00 6.04.140
Lost tag replacement 10.00 6.08.130
Miscellaneous fees
Owner surrender fees
Text read from an image; its layout may differ:
Subject Fee Section
Live dogs
Received at shelter $25.00
Picked up from owner 75.00
Deceased dogs
Pick up $50.00
Received at shelter 25.00
Live cats and other small animals
Received at shelter $25.00
Picked up from owner 50.00
Deceased cats and other small animals
Pick up $50.00
Received at shelter 25.00
Emergency call charges
Call out between 6 p.m. and 7 a.m. $150.00
Transport to veterinarian 40.00
Identification "chips" 20.00
(Res. R2010-12; Res. 1998-22)
BICYCLE
License $2.00 10.68.050
Transfer 0.75 10.68.060
BINGO
License By resolution 5.20.070
BUDGET, hard copies and cds $15.00
BUILDING PERMIT
Government building facilities use Effective Jan. 1, 2015 15.04.120
Very low-density residential $4,362.53 per unit
Low-density residential 4,362.53 per unit
Medium-density residential 3,638.12 per unit
High-density residential 3,274.19 per unit
Commercial mixed-use 3,274.19 per unit
Major equipment purchase 350.00 per unit 15.04.120
Fire facility fee Effective Jan. 1, 2026 15.26.010
Residential
Text read from an image; its layout may differ:
Subject Fee Section
Single-family $0.65 per sq. ft.
Multifamily 1.10 per sq. ft.
Nonresidential
Commercial 0.40 per sq. ft.
Office 0.50 per sq. ft.
Industrial 0.18 per sq. ft.
Assisted living $5,686.87 per bed
Mobile home parks/modular/campsites $0.66 per sq. ft.
BUSINESS LICENSES (See II. BUSINESS LICENSES)
CONCEALED WEAPONS PERMIT $40.00
FEE
Annual concealed weapons permit 40.00
renewal fee
Weapons class and qualifying shoot fee 35.00
DANCE HALL AND PUBLIC DANCE PERMITS
Dance hall serving alcoholic beverages $250.00
Dance hall not serving alcoholic 125.00
beverages
FOG (Fats, Oils and Grease)
FOG collected within the City of $100.00 per 1,000 13.20.110 - L
Manteca gallons
All others $125.00 per 1,000 13.20.110 - L
gallons
Manteca Park Golf Comparison
Course Actual 2018-19 Proposed 2020 Diff. Average
Weekday
18-hole weekday/ $22.00 $25.00 $3.00 na
resident
18-hole weekday/ $26.00 $29.00 $3.00 $29.00
nonresident
9-hole weekday $16.00 $17.00 $1.00 $22.00
Junior weekday $12.00 $12.00 - $15.00
Twilight weekday $18.00 $19.00 $1.00 $21.00
Super twilight weekday $13.00 $14.00 $1.00 $15.00
Text read from an image; its layout may differ:
Manteca Park Golf Comparison
Course Actual 2018-19 Proposed 2020 Diff. Average
Senior rate $20.00 $21.00 $1.00 $21.00
(Monday—Friday)
Active military weekday $15.00 $15.00 - na
Weekends
18-hole weekend/ $25.00 $29.00 $4.00 na
resident
18-hole weekend/ $33.00 $34.00 $1.00 $38.00
nonresident
9-hole weekend $18.00 $19.00 $1.00 $24.00
Junior weekend $14.00 $14.00 - $16.00
Twilight weekend $19.00 $21.00 $1.00 $26.00
Super twilight weekend $15.00 $16.00 $1.00 $17.00
Active military weekend $17.00 $17.00 - na
Pass surcharge $17.00 $17.00 - na
Manteca Park Golf 2022 Fees Effective January 1, 2023
Course
Pass Play
Adult pass resident $114.00 $134.00
Adult pass nonresident $139.00 $159.00
Senior pass resident $99.00 $114.00
Senior pass nonresident $119.00 $134.00
Junior pass (17 & under) $50.00 $55.00
Youth on course (daily $5.00 $5.00
after 10 a.m.)
Disability resident $99.00 $114.00
Disability nonresident $119.00 $134.00
Subject Fee Section
LATE FEES
Accounts past due by more than 14 calendar $10.00
days
OVERSIZE, OVERWEIGHT VEHICLES
One-time: $15.00
Annual: $70.00
Text read from an image; its layout may differ:
Subject Fee Section
PARADE, ASSEMBLY, SPECIAL Determined by number of 12.16.130
EVENT TRAFFIC CONTROL FEE officers
Park Acquisition and Improvements Fees Per Unit (effective 1/1/26)
Single-Family Dwelling Unit $5,009.00
Multi-Family Dwelling Unit $3,496.00
Neighborhood Park-In-Lieu Fee
Single-Family Dwelling Unit $4,560.00
Multi-Family Dwelling Unit $3,184.00
Existing Fee Updated by ENR Neighborhood Park Fee Community Park Fee
CCI* Portion Portion Total
Single-Family Dwelling Unit $2,354.21 $2,572.36 $4,926.56
Multi-Family Dwelling Unit $1,629.83 $1,780.84 $3,410.66
- Existing fee updated by the current Engineering News Record Construction Cost Index. Applies to existing developments that have rights under their existing development agreements, vesting tentative maps or park improvement agreements.
Text read from an image; its layout may differ:
PARKING VIOLATIONS, FINES
Description Penalty
No parking zone $32.00
72-hour parking 27.00
Displayed for sale 27.00
Vehicle repair in street 27.00
24-minute parking, green zone 17.00
40-minute parking 17.00
1-hour parking 17.00
2-hour parking 17.00
4-hour parking 17.00
Parked out of markings 25.00
No parking 4:00 a.m.—5:00 a.m. 17.00
Loading zone 32.00
Oversized vehicle 32.00
Passenger loading zone 32.00
Text read from an image; its layout may differ:
PARKING VIOLATIONS, FINES
Description Penalty
Parked in alley 32.00
Parked off truck route 50.00
MUSD parking violation 22.00
Parking violations 27.00
Parked in fire lane 37.00
Park parallel 22.00
Fire hydrant 32.00
Parked in handicap zone 275.00*
Blocking access to handicap zone 275.00*
Parked in handicap loading zone 275.00*
Expired registration 100.00*
No license plates 60.00*
Display of tabs 60.00*
Stopping in occupied intersection 50.00
Equipment violation 30.00**
Minimum fine set by state law.
** $10.00 with proof of correction.
Late fee $13.00
Text read from an image; its layout may differ:
Subject Fee Section
POTBELLY PIG $25.00 per year 6.12.110
- Residential source reduction and recycling
The monthly rate or charge for the implementation of programs required to meet the goals of AB939 and AB1820 as proposed in the city's adopted source reduction and recycling element from each single-family dwelling or from each unit of a multiple-family dwelling in the city shall be three dollars and fifty-six cents. If the city's 96-gallon yardwaste container is returned to the city and the resident does not dispose of yardwaste through the city's solid waste collection system, the monthly rate is two dollars and six cents.
These rates shall not apply to Manteca low-income senior citizens who qualify for reduced refuse rates.
Text read from an image; its layout may differ:
Subject Fee Section
SEPTIC TANK CLEANING
Discharge $4.00 per 1000 gallons 13.24.090
SEWER See III. UTILITIES
STREET, ENCROACHMENT, By resolution 12.04.210
EXCAVATION
Taxicab fares
- A. No owner or driver of a taxicab shall charge a greater sum for the use of a taxicab than in accordance with the following rates governed by the provisions of Chapter 5.40 of this code:
Text read from an image; its layout may differ:
Rates
Base rate (meter drop) $2.50 first 1/20th
Per mile or fraction thereof $0.125 per 1/20th
Waiting time or when required to travel $25.00 per hour
less than 10 mph
Trunks $1.00
Hand baggage, parcels, or packages $0.10*
- For any item, parcel or package transported in excess of forty pounds (40 lbs.).
- B. No charge shall be made for extra passengers. This applies only to those passengers whose point of pickup and point of destination are the same.
Towing service charges
A. Towing Charges. Includes the response to the scene, any ordinary work positioning and hooking up the vehicle for towing and return to place of business. It also includes ordinary cleanup at the scene.
- All passenger cars and trucks with single rear wheels. Monday through Friday 8:00 a.m. to 5:00 p.m. *(Hourly rate)
Weekends and holidays and 5:00 p.m. to 8:00 a.m. weekdays. *(Hourly rate)
- All vehicles and unattached trailers factory rated over 1-1/2 ton. Monday through Friday, 8:00 a.m. to 5:00 p.m. (depending on size of vehicle towed). *(Hourly rate)
Weekends and holidays and 5:00 p.m. to 8:00 a.m. weekdays (depending on size of vehicle towed)*(Hourly rate)
The tow operator may accept a fee, or not accept a fee and remain at the top of the rotation list if the tow truck has arrived or any time to the point of being hooked up to a vehicle and the owner arrives and wants his or her car. *(Actual hourly rate—with minimum)
- Mileage. To a call for service within the city limits is included in the towing charge. If the vehicle is towed to another location at the request of the owner, mileage in excess of the distance from the business address of the tow service to the scene may be charged at the rate of *(included in hourly rate).
- B. Storage. The first twenty-four hours of the storage charge will begin when the vehicle is deposited in the storage yard and concludes at the same time the following day. Storage charges will be added for each twenty-four hours, or fraction thereof, thereafter.
Outside — (As established in the annual rate by the area Highway Patrol Office)
Inside — (As established in the annual rate by the area Highway Patrol Office)
C.
Miscellaneous.
Dolly. This charge will be used when it is mandatory that the vehicle be placed on dollies, and includes all actions necessary to place the vehicle on dollies and prepare it for towing *(included in hourly rate).
Standby. Should be used when, for whatever the reason, the driver must wait to start his or her work after arrival at the scene. Charges begin after a full fifteen minutes have been spent on standby. That fifteen minutes is chargeable and any portion of fifteen minutes thereafter ... per fifteen minutes *(included in hourly rate).
Winching. This charge may be used only when it is necessary to winch a vehicle from an extraordinary position off the roadway and where accessibility is difficult. Winching is not to be charged for routine positioning of a vehicle for tow hookup. After 15 minutes, additional time may be charged to labor * [1] (included in hourly rate).
Water See III. Utilities (Res. R1988-79; Res. R1990-368; Res. R1990-186; Res. R1990-148; Res. R1990-113; Res. R1991-178; Res. R1993-159; Res. R1994-9; Res. R1995-171; Res. R1995-107; Res. R1996-200; Res. 1997-37; Res. R1999-201; Res. R2000-315; Res. R2003-266; Res. R2003-141; Res. R2005-134; Res. R2009-231; Res. R2010-12; Res. R2013-168; Memo dated 1-2-14; Memo dated 1-22-14; Memo dated 1-7-15; Res. R2016-235; Res. R2016-235; Memo dated 12-24-17; Res. R2017-190; Memo dated 1-2-18; Memo dated 12-18-18; Ord. 2019-17 § 1; Res. R2019-126; Memo dated 1-6-20; Res. R2020-05; Memo dated 9-16-21; Memo dated 11-16-21; Memo dated 2-2-22; Memo dated 9-7-23; Memo dated 12-6-23; Memo dated 12/9/ 2025)
II. BUSINESS LICENSES.¶
- A. Generally
1. The hourly rate is computed annually by the California Highway Patrol by adding the hourly rate charged by tow companies on the rotation list, plus 15%, and dividing the total figure by the number of tow companies participating.
Text read from an image; its layout may differ:
Subject Fee Section
ADMINISTRATION
Duplicate licenses $5.00 5.04.090
Transfer of license 5.00 5.04.080
ADVERTISING 5.12.030
Billboards, illuminated signs, wall signs $150.00 per year 5.12.030
CHRISTMAS TREES 5.12.030
Decorations and miscellaneous Christmas $50.00 per year 5.12.030
merchandise other than in connection with
another business license
COMMERCIAL VEHICLES Fee Per Year 5.12.030
1. For every vehicle used in serving residents or
places of business within the city, by:
a. Person maintaining a fixed place of business $ 63.00
outside the city or operating from outside city
b. Person maintaining a fixed place of business 45.00
within the city or operating from within the
city
2. For every mobile grocery store, operating 750.00
within the city
3. For every mobile lunch-wagon used in selling 188.00
or delivering boxed lunches, confections,
refreshments, cigarettes, tobaccos, etc., or
offering lunch-counter service, operating within
the city
4. For every vehicle used in selling, delivering, 188.00
or offering for sale to residents, vegetables, fruits
and similar commodities, operating within the
city
DANCES, PUBLIC $25.00 per event 5.56.070
Text read from an image; its layout may differ:
CONTRACTORS (Section 5.12.030)
At Least But Less Than License Fee
$ 0.00 $ 499.00 $ 15.00
500.00 4,999.00 30.00
5,000.00 9,999.00 45.00
10,000.00 49,999.00 63.00
50,000.00 99,999.00 94.00
Text read from an image; its layout may differ:
100,000.00 149,999.00 156.00
150,000.00 199,999.00 219.00
200,000.00 249,999.00 281.00
250,000.00 299,999.00 344.00
300,000.00 349,999.00 406.00
350,000.00 399,999.00 469.00
400,000.00 449,999.00 531.00
450,000.00 499,999.00 594.00
500,000.00 599,999.00 688.00
600,000.00 699,999.00 813.00
700,000.00 799,999.00 938.00
800,000.00 899,999.00 1,063.00
900,000.00 999,999.00 1,188.00
1,000,000.00 and over 1,250.00
Subject Fee Per Year Section
FOOD PROCESSING
1. Canning, processing or $300.00 5.12.030
preparing green or dried fruits or
vegetables or other food products
for shipment or for sale on
commission or otherwise
2. Creamery, milk or cheese 300.00 5.12.030
processing or manufacturing plant
which makes no retail sales
3. Packing or preparing for 75.00 5.12.030
shipment fresh fruit or vegetables
where no processing other than
washing or trimming is involved
HOTELS, MOTELS, APARTMENTS AND ROOMINGHOUSES AND AUTO
COURTS (5.12.030)
Gross receipts of $5,000.00 or less, $38.00 per year; plus 75¢ for each additional
$1,000.00 of gross receipts up to $100,000; plus 25¢ for each additional $1,000.00 of
gross receipts thereafter
LIVESTOCK AND POULTRY FEED (Section 5.12.030)
If annual gross receipts are:
At Least But Less Than License Fee
$ 0.00 $ 99,999.00 $ 63.00
Text read from an image; its layout may differ:
Subject Fee Per Year Section
100,000.00 199,999.00 94.00
200,000.00 299,999.00 156.00
300,000.00 399,999.00 219.00
400,000.00 499,999.00 281.00
500,000.00 599,999.00 344.00
600,000.00 799,999.00 438.00
800,000.00 999,999.00 563.00
1,000,000.00 and over 625.00
MANUFACTURING (Section 5.12.030)
If annual gross receipts are:
At Least But Less Than License Fee
$ 0.00 $ 99,999.00 $ 63.00
100,000.00 199,999.00 94.00
200,000.00 299,999.00 156.00
300,000.00 399,999.00 219.00
400,000.00 499,999.00 281.00
500,000.00 599,999.00 344.00
600,000.00 799,999.00 438.00
800,000.00 999,999.00 563.00
1,000,000.00 and over 625.00
MISCELLANEOUS BUSINESS, TRADE, OCCUPATIONS, PROFESSIONS (Section
5.12.030)
If the annual gross receipts are:
At Least But Less Than License Fee
$ 0.00 $ 499.00 $ 15.00
500.00 4,999.00 30.00
5,000.00 14,999.00 45.00
15,000.00 29,999.00 55.00
30,000.00 44,999.00 63.00
45,000.00 99,999.00 100.00
100,000.00 149,999.00 150.00
150,000.00 249,999.00 250.00
250,000.00 and over 313.00
Text read from an image; its layout may differ:
Subject Fee Per Year Section
100,000.00 199,999.00 94.00
200,000.00 299,999.00 156.00
300,000.00 399,999.00 219.00
400,000.00 499,999.00 281.00
500,000.00 599,999.00 344.00
600,000.00 799,999.00 438.00
800,000.00 999,999.00 563.00
1,000,000.00 and over 625.00
MANUFACTURING (Section 5.12.030)
If annual gross receipts are:
At Least But Less Than License Fee
$ 0.00 $ 99,999.00 $ 63.00
100,000.00 199,999.00 94.00
200,000.00 299,999.00 156.00
300,000.00 399,999.00 219.00
400,000.00 499,999.00 281.00
500,000.00 599,999.00 344.00
600,000.00 799,999.00 438.00
800,000.00 999,999.00 563.00
1,000,000.00 and over 625.00
MISCELLANEOUS BUSINESS, TRADE, OCCUPATIONS, PROFESSIONS (Section
5.12.030)
If the annual gross receipts are:
At Least But Less Than License Fee
$ 0.00 $ 499.00 $ 15.00
500.00 4,999.00 30.00
5,000.00 14,999.00 45.00
15,000.00 29,999.00 55.00
30,000.00 44,999.00 63.00
45,000.00 99,999.00 100.00
100,000.00 149,999.00 150.00
150,000.00 249,999.00 250.00
250,000.00 and over 313.00
Text read from an image; its layout may differ:
Subject Fee Per Year Section
100,000.00 199,999.00 94.00
200,000.00 299,999.00 156.00
300,000.00 399,999.00 219.00
400,000.00 499,999.00 281.00
500,000.00 599,999.00 344.00
600,000.00 799,999.00 438.00
800,000.00 999,999.00 563.00
1,000,000.00 and over 625.00
MANUFACTURING (Section 5.12.030)
If annual gross receipts are:
At Least But Less Than License Fee
$ 0.00 $ 99,999.00 $ 63.00
100,000.00 199,999.00 94.00
200,000.00 299,999.00 156.00
300,000.00 399,999.00 219.00
400,000.00 499,999.00 281.00
500,000.00 599,999.00 344.00
600,000.00 799,999.00 438.00
800,000.00 999,999.00 563.00
1,000,000.00 and over 625.00
MISCELLANEOUS BUSINESS, TRADE, OCCUPATIONS, PROFESSIONS (Section
5.12.030)
If the annual gross receipts are:
At Least But Less Than License Fee
$ 0.00 $ 499.00 $ 15.00
500.00 4,999.00 30.00
5,000.00 14,999.00 45.00
15,000.00 29,999.00 55.00
30,000.00 44,999.00 63.00
45,000.00 99,999.00 100.00
100,000.00 149,999.00 150.00
150,000.00 249,999.00 250.00
250,000.00 and over 313.00
Text read from an image; its layout may differ:
Subject Fee Per Year Section
OIL STORAGE TANK STATIONS (5.12.030) $125.00 per year
PROFESSIONAL SERVICES, PERSONAL SERVICE AND ARTS AND CRAFTS
(Section 5.12.030)
If annual gross receipts are:
At Least But Less Than License Fee
$ 0.00 $ 999.00 $ 15.00
1,000.00 4,999.00 30.00
5,000.00 9,999.00 63.00
10,000.00 19,999.00 94.00
20,000.00 29,999.00 125.00
30,000.00 39,999.00 163.00
40,000.00 49,999.00 200.00
50,000.00 and over 250.00
RESIDENTIAL CONSTRUCTION (5.12.030)
Dwelling units constructed in very low density or low $900.00 per dwelling
density residential zones unit
Dwelling units constructed in medium density or high $625.00 per dwelling
density residential zones unit
RETAILING, PRINTING AND PUBLISHING, TRUCKING AND
TRANSPORTATION
(Section 5.12.030)
If annual gross receipts are:
At Least But Less Than License Fee
$ 0.00 $499.00 $ 15.00
500.00 4,999.00 30.00
5,000.00 14,999.00 45.00
15,000.00 29,999.00 55.00
30,000.00 44,999.00 63.00
45,000.00 99,999.00 100.00
100,000.00 199,999.00 150.00
200,000.00 399,999.00 200.00
400,000.00 799,999.00 250.00
800,000.00 and over 313.00
STREET FAIR AND SPECIAL EVENTS $5.00 per vendor
Text read from an image; its layout may differ:
Subject Fee Per Year Section
OIL STORAGE TANK STATIONS (5.12.030) $125.00 per year
PROFESSIONAL SERVICES, PERSONAL SERVICE AND ARTS AND CRAFTS
(Section 5.12.030)
If annual gross receipts are:
At Least But Less Than License Fee
$ 0.00 $ 999.00 $ 15.00
1,000.00 4,999.00 30.00
5,000.00 9,999.00 63.00
10,000.00 19,999.00 94.00
20,000.00 29,999.00 125.00
30,000.00 39,999.00 163.00
40,000.00 49,999.00 200.00
50,000.00 and over 250.00
RESIDENTIAL CONSTRUCTION (5.12.030)
Dwelling units constructed in very low density or low $900.00 per dwelling
density residential zones unit
Dwelling units constructed in medium density or high $625.00 per dwelling
density residential zones unit
RETAILING, PRINTING AND PUBLISHING, TRUCKING AND
TRANSPORTATION
(Section 5.12.030)
If annual gross receipts are:
At Least But Less Than License Fee
$ 0.00 $499.00 $ 15.00
500.00 4,999.00 30.00
5,000.00 14,999.00 45.00
15,000.00 29,999.00 55.00
30,000.00 44,999.00 63.00
45,000.00 99,999.00 100.00
100,000.00 199,999.00 150.00
200,000.00 399,999.00 200.00
400,000.00 799,999.00 250.00
800,000.00 and over 313.00
STREET FAIR AND SPECIAL EVENTS $5.00 per vendor
Text read from an image; its layout may differ:
Subject Fee Per Year Section
OIL STORAGE TANK STATIONS (5.12.030) $125.00 per year
PROFESSIONAL SERVICES, PERSONAL SERVICE AND ARTS AND CRAFTS
(Section 5.12.030)
If annual gross receipts are:
At Least But Less Than License Fee
$ 0.00 $ 999.00 $ 15.00
1,000.00 4,999.00 30.00
5,000.00 9,999.00 63.00
10,000.00 19,999.00 94.00
20,000.00 29,999.00 125.00
30,000.00 39,999.00 163.00
40,000.00 49,999.00 200.00
50,000.00 and over 250.00
RESIDENTIAL CONSTRUCTION (5.12.030)
Dwelling units constructed in very low density or low $900.00 per dwelling
density residential zones unit
Dwelling units constructed in medium density or high $625.00 per dwelling
density residential zones unit
RETAILING, PRINTING AND PUBLISHING, TRUCKING AND
TRANSPORTATION
(Section 5.12.030)
If annual gross receipts are:
At Least But Less Than License Fee
$ 0.00 $499.00 $ 15.00
500.00 4,999.00 30.00
5,000.00 14,999.00 45.00
15,000.00 29,999.00 55.00
30,000.00 44,999.00 63.00
45,000.00 99,999.00 100.00
100,000.00 199,999.00 150.00
200,000.00 399,999.00 200.00
400,000.00 799,999.00 250.00
800,000.00 and over 313.00
STREET FAIR AND SPECIAL EVENTS $5.00 per vendor
Text read from an image; its layout may differ:
Subject Fee Per Year Section
TRADING STAMPS (5.12.030) $125.00 per year or
fractional part thereof
TRUCKING AND TRANSPORTATION (maintained by person maintaining fixed
place of business outside of city) (5.12.030)
License, annual $63.00
VENDING MACHINES (Section 5.12.030)
1. Vending machines vending merchandise other than cigarettes where gross receipts
are:
At Least But Less Than License Fee
$ 0.00 $ 499.00 $ 15.00
500.00 4,999.00 30.00
5,000.00 14,999.00 45.00
15,000.00 29,999.00 55.00
30,000.00 44,999.00 63.00
45,000.00 99,999.00 100.00
100,000.00 199,999.00 150.00
200,000.00 399,999.00 200.00
400,000.00 799,999.00 250.00
800,000.00 and over 313.00
2. Cigarette vending machines where gross receipts are:
At Least But Less Than License Fee
$ 0.00 $ 499.00 $ 15.00
500.00 4,999.00 30.00
5,000.00 14,999.00 45.00
15,000.00 29,999.00 55.00
30,000.00 44,999.00 63.00
45,000.00 99,999.00 100.00
100,000.00 199,999.00 150.00
200,000.00 399,999.00 200.00
400,000.00 799,999.00 250.00
800,000.00and over 313.00
WHOLESALING AND JOBBING (Section 5.12.030)
If annual gross receipts are:
At Least But Less Than License Fee
Text read from an image; its layout may differ:
Subject Fee Per Year Section
TRADING STAMPS (5.12.030) $125.00 per year or
fractional part thereof
TRUCKING AND TRANSPORTATION (maintained by person maintaining fixed
place of business outside of city) (5.12.030)
License, annual $63.00
VENDING MACHINES (Section 5.12.030)
1. Vending machines vending merchandise other than cigarettes where gross receipts
are:
At Least But Less Than License Fee
$ 0.00 $ 499.00 $ 15.00
500.00 4,999.00 30.00
5,000.00 14,999.00 45.00
15,000.00 29,999.00 55.00
30,000.00 44,999.00 63.00
45,000.00 99,999.00 100.00
100,000.00 199,999.00 150.00
200,000.00 399,999.00 200.00
400,000.00 799,999.00 250.00
800,000.00 and over 313.00
2. Cigarette vending machines where gross receipts are:
At Least But Less Than License Fee
$ 0.00 $ 499.00 $ 15.00
500.00 4,999.00 30.00
5,000.00 14,999.00 45.00
15,000.00 29,999.00 55.00
30,000.00 44,999.00 63.00
45,000.00 99,999.00 100.00
100,000.00 199,999.00 150.00
200,000.00 399,999.00 200.00
400,000.00 799,999.00 250.00
800,000.00and over 313.00
WHOLESALING AND JOBBING (Section 5.12.030)
If annual gross receipts are:
At Least But Less Than License Fee
Text read from an image; its layout may differ:
Subject Fee Per Year Section
TRADING STAMPS (5.12.030) $125.00 per year or
fractional part thereof
TRUCKING AND TRANSPORTATION (maintained by person maintaining fixed
place of business outside of city) (5.12.030)
License, annual $63.00
VENDING MACHINES (Section 5.12.030)
1. Vending machines vending merchandise other than cigarettes where gross receipts
are:
At Least But Less Than License Fee
$ 0.00 $ 499.00 $ 15.00
500.00 4,999.00 30.00
5,000.00 14,999.00 45.00
15,000.00 29,999.00 55.00
30,000.00 44,999.00 63.00
45,000.00 99,999.00 100.00
100,000.00 199,999.00 150.00
200,000.00 399,999.00 200.00
400,000.00 799,999.00 250.00
800,000.00 and over 313.00
2. Cigarette vending machines where gross receipts are:
At Least But Less Than License Fee
$ 0.00 $ 499.00 $ 15.00
500.00 4,999.00 30.00
5,000.00 14,999.00 45.00
15,000.00 29,999.00 55.00
30,000.00 44,999.00 63.00
45,000.00 99,999.00 100.00
100,000.00 199,999.00 150.00
200,000.00 399,999.00 200.00
400,000.00 799,999.00 250.00
800,000.00and over 313.00
WHOLESALING AND JOBBING (Section 5.12.030)
If annual gross receipts are:
At Least But Less Than License Fee
Text read from an image; its layout may differ:
Subject Fee Per Year Section
$ 0.00 $ 99,999.00 $ 63.00
100,000.00 199,999.00 94.00
200,000.00 299,999.00 156.00
300,000.00 399,999.00 219.00
400,000.00 499,999.00 281.00
500,000.00 599,999.00 344.00
600,000.00 799,999.00 438.00
800,000.00 999,999.00 563.00
1,000,000.00 and over 625.00
- B. Businesses requiring certificates or permits
Text read from an image; its layout may differ:
Subject Fee Section
Businesses requiring certificate of compliance from police chief:
Amusement-music boxes if annual gross receipts are: 5.16.020
At Least But Less Than License Fee
$ 0.00 $ 499.00 $ 15.00
500.00 4,999.00 30.00
5,000.00 14,999.00 45.00
15,000.00 29,999.00 55.00
30,000.00 44,999.00 63.00
45,000.00 99,999.00 100.00
100,000.00 199,999.00 150.00
200,000.00 399,999.00 200.00
400,000.00 799,999.00 250.00
800,000.00 and over 313.00
Canvassers, solicitors, $300.00 per year 5.16.020
peddlers
$13.00 per day
Itinerant street vendors, $375.00 per year 5.16.020
handbill distributors
$16.00 per day
Klieg lights $150.00 per year 5.16.020
$13.00 per day
Transient house-to-house $300.00 per year 5.16.020
services
$13.00 per day
Text read from an image; its layout may differ:
Subject Fee Section
Vehicular street advertising $450.00 per year 5.16.020
$25.00 per day
Businesses requiring permit from the planning commission:
Animal hospitals, kennels, Gross receipts of $3,000.00 or less, 5.16.020
and boarding stables; $60.00 per year, plus $1.25 for
bathhouses, massage parlors, each additional $1,000.00 of gross
etc.; pawnbrokers; receipts
watchman, private police
and detective agencies
Bowling alleys, pool and $250.00 per year 5.16.020
billiard halls, amusement
arcades, commercial
amusements, ice or roller
skating rinks
Cardrooms, public $375.00 per quarter plus $250.00 5.16.020
per quarter for each additional
table in excess of three tables
Hospitals, sanitariums, Gross receipts of $5,000.00 or less, 5.16.020
resthomes, mortuaries and $63.00 per year, plus 75 cents for
funeral parlors: each additional $1,000.00 of gross
receipts
Junk dealers or collectors; $125.00 per year 5.16.020
secondhand dealers;
automobile wrecking yards
Mobile home parks $63.00 per year, plus $2.50 per 5.16.020
$1,000.00 of annual gross receipts
Theaters maintaining a fixed $688.00 per year 5.16.020
place of business in city
Businesses requiring permit from director of community development:
Automobile parking lots $25.00 per year, plus $2.50 for 5.16.020
each 1000 sq. ft. of rental space
Carnivals, tent theaters, $375.00 for the first day, $125.00 5.16.020
animal shows, temporary per day for each additional day
entertainment under tent or
temporary structure
Circuses: 5.16.020
Where seating capacity is $500.00 for the first day and
4,000 persons or less $375.00 per day for each additional
day
III
Text read from an image; its layout may differ:
Subject Fee Section
Where seating capacity is $750.00 for the first day and
more than 4,000 persons $250.00 per day for each additional
day
Rummage sales $300.00 per year, or, at option of 5.16.020
licensee, $100.00 per quarter, or
$13.00 per day
Taxicab and ambulance $63.00 per year for each vehicle or, 5.16.020
service at the option of the licensee, $6.25
per quarter
Businesses requiring permit from police chief:
Fortunetelling $375.00 per year 5.16.020
Private police and detective Gross receipts of $3,000.00 or less, 5.16.020
agencies $60.00 per year, plus $1.25 each
additional $1,000.00 of gross
receipts
(Res. R2004-503)
III. UTILITIES.¶
Text read from an image; its layout may differ:
Subject Fee Section
SEWER CONNECTION
Residential
Very low density $3,961.00 per unit
Low density 3,961.00 per unit
Medium density 3,301.00 per unit
High density 3,301.00 per unit
Commercial
Office professional $1,493.00 per 1,000 sq. ft.
Neighborhood/community 1,640.00 per 1,000 sq. ft.
commercial
Business/visitor services 1,640.00 per 1,000 sq. ft.
General commercial 1,640.00 per 1,000 sq. ft.
Commercial recreation 1,640.00 per 1,000 sq. ft.
Light industrial 1,692.00 per 1,000 sq. ft.
Heavy industrial 1,692.00 per 1,000 sq. ft.
WQCF PHASE 3 COMPLETION CHARGE
Residential
III
III
Text read from an image; its layout may differ:
Subject Fee Section
Very low density $2,003.00 per unit
Low density 2,003.00 per unit
Medium density 1,802.00 per unit
High density 1,802.00 per unit
Commercial
Office professional $815.00 per 1,000 sq. ft.
Neighborhood/community 895.00 per 1,000 sq. ft.
commercial
Business/visitor services 895.00 per 1,000 sq. ft.
General commercial 895.00 per 1,000 sq. ft.
Commercial recreation 895.00 per 1,000 sq. ft.
Light industrial 924.00 per 1,000 sq. ft.
Heavy industrial 924.00 per 1,000 sq. ft.
SEWER SYSTEM MONTHLY RATE (Jan. 1, 2013 and Thereafter)
Residential and equivalents $43.30 per unit
Trailer park 36.57 per 1,000 CF
Rooming houses 27.70 per 1,000 CF
Commercial/retail 30.96 per 1,000 CF
Hotel/motel 33.81 per 1,000 CF
Hotel/motel w/kitchen 61.89 per 1,000 CF
Car washes/laundromats 24.53 per 1,000 CF
Service stations (metered) 34.04 per 1,000 CF
Office/light industrial 25.35 per 1,000 CF
Restaurants 72.42 per 1,000 CF
Markets 75.45 per 1,000 CF
Mortuaries 75.45 per 1,000 CF
Hospitals 32.69 per 1,000 CF
Elementary schools 24.06 per 1,000 CF
Secondary schools 24.06 per 1,000 CF
Churches 28.71 per 1,000 CF
Nonprofit 27.82 per 1,000 CF
Commercial/mixed use 40.23 per 1,000 CF
Industrial
III
III
Text read from an image; its layout may differ:
Subject Fee Section
Flow 4,946.55 per million gallons
Biochemical oxygen demand 0.375 per 1,000 pounds
(BOD)
Suspended solids (SS) 0.711 per 1,000 pounds
Nitrogen (N) 0.023 per 1,000 pounds
Septage 165.16 per 1,000 gallons
City of Lathrop per contract
Raymus Village per contract
- WATER WORKS SYSTEM:
Text read from an image; its layout may differ:
(effective 1/1/2025)
Surface Water Capital
Meter Size Meter Installation Fee Water Debt Fee Fee
5/8″ & 3/4″ $ 408.00 $ 5,214.00 $ 163.00
1″ 577.00 8,918.00 273.00
1-1/2″ 999.00 17,781.00 540.00
2″ 1,161.00 28,458.00 864.00
3″ 5,496.00 53,395.00 1,621.00
4″ 6,662.00 89,005.00 2,704.00
6″ 18,846.00 177,947.00 5,409.00
8″ 24,302.00 284,745.00 8,658.00
(effective 5/1/2025)
Water Debt Fee/Surface
Meter Size Meter Installation Fee Water Capital Fee
5/8″ & 3/4″ $ 870.26 $ 5,167.79
1″ 1,006.36 8,612.98
1-1/2″ 1,648.47 17,225.96
2″ 2,062.87 27,561.54
3″ 10,441.80 60,290.87
4″ 12,197.55 108,523.57
6″ 17,925.64 275,615.43
8″ 24,956.85 482,327.00
III
III
Text read from an image; its layout may differ:
Subject Fee Section
Water Service Reconnection Charges* 13.04.130
Regular Time:
48-hour notices $ 2.00
Routine turn on 25.00
Lock turn on 19.00
Meter turn on 52.00*
Plus cost of damaged equipment
A $15.00 charge will be assessed for all returned checks.
Text read from an image; its layout may differ:
Subject Fee Section
Overtime Turn On 13.04.130
Lock turn on $ 52.00
Meter turn on 71.00
- TEMPORARY SERVICE FEE (13.04.150)
Text read from an image; its layout may differ:
Water Consumption Charge
Monthly Rental per Hundred Cubic Feet
Meter Size Deposit* Charge Used
Sept. 1, 2018 and Sept. 1, 2018 and Sept. 1, 2018 and thereafter
thereafter thereafter
1″ $1,500.00 $26.50 $3.76
3″ $5,000.00 $142.70 $3.76
- The deposit shall be refunded to the applicant upon return of the water meter/ backflow prevention assembly provided it is returned in the same condition as furnished.
- SOLID WASTE
Residential Charges:¶
The monthly charges for collection of solid waste from each single-family dwelling or from each unit of a multiple-family dwelling using the city's carts shall be as follows:
III
III
Text read from an image; its layout may differ:
Nov. 16, 2023 Jan. 1, 2025 Jan. 1, 2026 Jan. 1, 2027
through Dec. through Dec. through Dec. and
31, 2024 31, 2025 31, 2026 Thereafter
Large refuse cart (95 – $50.92 $54.68 $58.72 $63.07
100 gallon)
Each additional large $20.00 $20.00 $20.00 $20.00
green cart (95 – 100
gallon)
Each additional large $17.00 $17.00 $16.97 $17.12
refuse cart (95 – 100
gallon)
Extra dump $50.00 $50.00 $50.00 $50.00
- The city may provide a discount for utility charges for customers. Specifics on the program are indicated on each individual utility service section.
Customers that reside in the Stonegate and Westwood Apartments shall be charged a monthly fee that is prorata share of the monthly cost of providing solid waste service to those apartments.
Extra Collection Charges¶
The city will provide collection of bulky items and other waste based on pricing below:
Individual Items
Solid waste staff may retrieve a residential sized refrigerator for $35.00 plus time and materials.
There is no charge for Electronic Waste delivered to the solid waste office or special collection events. Solid waste staff may retrieve electronic waste at the residents on a time and materials basis.
Cleaning of Bins will be on a time and materials basis.
Replacement of Damaged Bins will be $65.00 plus time to assemble and deliver (time and materials).
Miscellaneous Bulky Items (couch, chair, etc.) will be charged the low-income senior monthly rate at the time of service, plus time and materials.
Extra Bags (no more than 3 – 35 Gallon) placed at curb beside brown bin will be charged a fee equal to the 35-gallon monthly rate at the time of service.
Locking Bar Installation (one time charge): $50.00.
Vacation Suspended Service: $120.00.
Other Tasks will be charged on a time and materials basis.
III
III
Text read from an image; its layout may differ:
Special Pick-Ups (A Portion of Time and Material Rates)
Cost per Hour/Year
Level of Labor 2017 2018 2019 2020 2021*
Truck and one $101.53 $103.56 $105.63 $107.75 $109.90
worker
Truck and two $171.85 $175.29 $178.80 $182.37 $186.02
workers
Truck and three $242.17 $247.02 $251.96 $257.00 $262.14
workers
Loading equipment $48.79 $49.77 $50.76 $51.78 $52.81
Rates are for January 1, 2021 and thereafter.
- ½ hour minimum charge.
Short-Term Rental¶
Commercial containers are available to residences and businesses for short-term rentals based on the following rates:
Text read from an image; its layout may differ:
Short-Term Collection Bin 2017
Container Size 3-Yard 4-Yard 6-Yard Roll Off
Charge for up to 14 days $249.57 $252.55 $258.51 $462.55
container rental*
Rental rate per day over 14-days $5.00 $5.00 $5.00 $50.00
Extra dump $169.36 $172.34 $178.30 $308.37
Rates are for February 16, 2017 to December 31, 2017.
- Charge includes one disposal; roll off boxes will require a $600.00 deposit.
Text read from an image; its layout may differ:
Short-Term Collection Bin 2018
Container Size 3-Yard 4-Yard 6-Yard Roll Off
Charge for up to 14 days $256.12 $259.16 $265.24 $474.78
container rental*
Rental rate per day over $5.00 $5.00 $5.00 $50.00
14-days
Extra dump $173.79 $176.83 $182.91 $316.52
Rates are for January 1, 2018 to December 31, 2018.
- Charge includes one disposal; roll off boxes will require a $600.00 deposit.
III
III
Text read from an image; its layout may differ:
Short-Term Collection Bin 2019
Container Size 3-Yard 4-Yard 6-Yard Roll Off
Charge for up to 14 days $261.24 $264.34 $270.55 $484.27
container rental*
Rental rate per day over $5.00 $5.00 $5.00 $50.00
14-days
Extra Dump $177.26 $180.36 $186.57 $322.85
Rates are for January 1, 2019 to December 31, 2019.
- Charge includes one disposal; roll off boxes will require a $600.00 deposit.
Text read from an image; its layout may differ:
Short-Term Collection Bin 2020
Container Size 3-Yard 4-Yard 6-Yard Roll Off
Charge for up to 14 days $263.22 $266.38 $272.69 $487.75
container rental*
Rental rate per day over $5.00 $5.00 $5.00 $50.00
14-days
Extra Dump $178.64 $181.80 $188.11 $325.17
Rates are for January 1, 2020 to December 31, 2020.
- Charge includes one disposal, roll off boxes will require a $600.00 deposit.
Text read from an image; its layout may differ:
Short-Term Collection Bin 2021
Container Size 3-Yard 4-Yard 6-Yard Roll Off
Charge for up to 14 days $265.85 $269.04 $275.42 $492.63
container rental*
Rental rate per day over $5.00 $5.00 $5.00 $50.00
14-days
Extra dump $180.42 $183.61 $189.99 $328.42
Rates are for January 1, 2021 and thereafter.
- Charge includes one disposal; Roll Off Boxes will require a $600.00 deposit.
Commercial Rates:¶
The monthly charge for the collection of garbage from businesses in the city furnished containers shall be as follows:
III
III
Text read from an image; its layout may differ:
Nov. 16, 2023 Jan. 1, 2025 Jan. 1, 2026
through Dec. through Dec. through Dec. Jan. 1, 2027 and
Cart Capacity 31, 2024 31, 2025 31, 2026 Thereafter
Large $50.92 $54.68 $58.72 $63.07
Each additional $20.00 $20.00 $20.00 $20.00
large green cart
Each additional $17.00 $17.00 $16.97 $17.12
large refuse cart
Extra dump $50.00 $50.00 $50.00 $50.00
Text read from an image; its layout may differ:
Commercial Bins Garbage 2024
Collection Times per Week $/Month
Extra
Size 1 2 3 4 5 6 Dump
1 Yard $160.69 $321.39 $482.08 $642.76 $803.45 $640.14 $219.07
2 Yard $178.10 $356.19 $534.29 $712.38 $890.48 $1,068.60 $223.08
3 Yard $195.49 $390.98 $586.46 $781.95 $977.44 $1,172.94 $227.11
4 Yard $212.87 $425.76 $638.63 $851.52 $1,064.39 $1,277.28 $231.11
6 Yard $248.94 $495.35 $743.02 $990.70 $1,238.37 $1,486.05 $239.14
Text read from an image; its layout may differ:
Commercial Bins Garbage 2025
Collection Times per Week $/Month
Extra
Size 1 2 3 4 5 6 Dump
1 Yard $178.20 $356.42 $534.62 $712.84 $891.04 $1,069.24 $241.25
2 Yard $197.51 $395.02 $592.52 $790.03 $987.54 $1,185.05 $245.68
3 Yard $216.80 $433.60 $650.38 $867.18 $1,083.98 $1,300.78 $251.86
4 Yard $236.08 $472.17 $708.25 $944.34 $1,180.41 $1,416.50 $256.30
6 Yard $276.07 $549.35 $824.01 $1,098.68 $1,373.36 $1,648.03 $265.21
Text read from an image; its layout may differ:
Commercial Bins Garbage 2026
Collection Times per Week $/Month
Extra
Size 1 2 3 4 5 6 Dump
1 Yard $197.63 $395.27 $592.90 $790.53 $988.16 $1,185.79 $269.43
2 Yard $219.04 $438.07 $657.11 $876.15 $1,095.18 $1,314.22 $274.36
3 Yard $240.43 $480.86 $721.28 $961.71 $1,202.14 $1,442.57 $279.35
4 Yard $261.81 $523.63 $785.44 $1,047.27 $1,309.08 $1,570.90 $284.24
6 Yard $306.16 $609.23 $913.83 $1,218.44 $1,523.05 $1,827.67 $294.12
III
III
Text read from an image; its layout may differ:
Commercial Bins Garbage 2027
Collection Times per Week $/Month
Extra
Size 1 2 3 4 5 6 Dump
1 Yard $219.17 $438.35 $657.52 $876.69 $1,095.86 $1,315.03 $298.79
2 Yard $242.91 $485.82 $728.73 $971.65 $1,214.56 $1,457.47 $304.27
3 Yard $266.64 $533.28 $799.90 $1,066.53 $1,333.17 $1,599.81 $309.76
4 Yard $290.35 $580.71 $871.06 $1,161.42 $1,451.77 $1,742.13 $315.22
6 Yard $339.53 $675.63 $1,013.43 $1,351.25 $1,689.07 $2,026.88 $326.18
Roll off boxes include both drop boxes and compactors. Roll off charges will consist of a service fee and tipping fees. Actual tipping fees incurred to dispose of waste contained in the box will be added to a service fee each time that the box is dumped. Service fees will include rental for drop boxes as long as the box is serviced at least once every two weeks. Compactors are customer furnished. The city will not service overweight boxes. Drop boxes not serviced every two weeks will incur a $50.00 daily rental fee for every day in excess of 14 days.
Text read from an image; its layout may differ:
Commercial Roll Off Boxes (All Materials)
Pull Fee (Tipping is added
Size Monthly on call rate to fee)
All Year Fee Monthly on- Tip fees are Year Fee
call rate the actual
2017 $616.74 2017 $308.37
includes 2 charges at
2018 $633.04 pulls. Tip the receiving 2018 $316.52
2019 $645.70 fees are in facility 2019 $322.85
addition.
2020 $650.34 2020 $325.17
2021 $656.84 2021 $328.42
Tip fees are in addition to pull fees and monthly on call rate.
Any excess deposit will be refunded and any balance due will be invoiced.
Pull fees include roll off box rental, as long as the box is serviced a minimum of once every two weeks.
Commercial Food Waste¶
Rates for collection of commercial food waste will be as follows:
City of Manteca, CA III
MANTECA CODE
III
Text read from an image; its layout may differ:
Commercial Food Waste 2017
Pulls Per Week $/Month
Volume and disposition 1 2 3 4 5
35-Gallon, clean food $33.18 $66.35 $99.53 $132.71 $165.89
35-Gallon, dirty food $59.72 $119.44 $179.16 $238.88 $298.60
2-Yard, clean food $66.35 $132.71 $199.06 $265.42 $331.77
2-Yard, dirty food $119.44 $238.88 $358.32 $477.75 $597.19
Rates are for February 16, 2017 to December 31, 2017.
Text read from an image; its layout may differ:
Commercial Food Waste 2018
Pulls Per Week $/Month
Volume and disposition 1 2 3 4 5
35-Gallon, clean food $34.02 $68.04 $102.05 $136.07 $170.09
35-Gallon, dirty food $61.23 $122.46 $183.70 $244.93 $306.16
2-Yard, clean food $68.04 $136.07 $204.11 $272.14 $340.18
2-Yard, dirty food $122.46 $244.93 $367.39 $489.86 $612.32
Rates are for January 1, 2018 to December 31, 2018.
Text read from an image; its layout may differ:
Commercial Food Waste 2019
Pulls Per Week $/Month
Volume and disposition 1 2 3 4 5
35-Gallon, clean food $34.70 $69.40 $104.09 $138.79 $173.49
35-Gallon, dirty food $62.46 $124.91 $187.37 $249.82 $312.28
2-Yard, clean food $69.40 $138.79 $208.19 $277.58 $346.98
2-Yard, dirty food $124.91 $249.82 $374.74 $499.65 $624.56
Rates are for January 1, 2019 to December 31, 2019.
Text read from an image; its layout may differ:
Commercial Food Waste 2020
Pulls Per Week $/Month
Volume and disposition 1 2 3 4 5
35-Gallon, clean food $35.02 $70.04 $105.06 $140.09 $175.11
35-Gallon, dirty food $63.04 $126.08 $189.12 $252.15 $315.19
III
III
Text read from an image; its layout may differ:
Commercial Food Waste 2020
Pulls Per Week $/Month
Volume and disposition 1 2 3 4 5
2-Yard, clean food $70.04 $140.09 $210.13 $280.17 $350.21
2-Yard, dirty food $126.08 $252.15 $378.23 $504.31 $630.38
Rates are for January 1, 2020 to December 31, 2020.
Text read from an image; its layout may differ:
Commercial Food Waste 2021
Pulls Per Week $/Month
Volume and disposition 1 2 3 4 5
35-Gallon, clean food $35.37 $70.74 $106.11 $141.49 $176.86
35-Gallon, dirty food $63.67 $127.34 $191.01 $254.68 $318.34
2-Yard, clean food $70.74 $141.49 $212.23 $282.97 $353.72
2-Yard, dirty food $127.34 $254.68 $382.01 $509.35 $636.69
Rates are for January 1, 2021 and thereafter.
Text read from an image; its layout may differ:
Commercial Roll Off Boxes (Food Waste)
Pull Fee (Tipping is
Size Monthly on call rate added to fee)
All Year Fee Monthly Tip fees Year Fee
on-call are the
2017 $616.74 2017 $308.37
rate actual
2018 $633.04 includes 2 charges at 2018 $316.52
2019 $645.70 pulls. Tip the 2019 $322.85
fees are in receiving
2020 $650.34 addition. facility 2020 $325.17
2021 $656.84 2021 $328.42
Tip fees are in addition to pull fees and monthly on call rate.
Any excess deposit will be refunded and any balance due will be invoiced.
Pull fees include roll off box rental, as long as the box is serviced a minimum of once every two weeks.
Clean food waste will not be charged a tip fee.
Dirty food waste will be charged a tip fee of $25.00/ton.
For collection of waste not covered by this schedule, collection will be charged on a time and material basis.
III
IV
Text read from an image; its layout may differ:
SOLID WASTE SERVICE INITIATION AND COST RECOVERY CHARGE
Feb. 16, 2017 Jan. 1, 2018 Jan. 1, 2019 Jan. 1, 2020
through Dec. through Dec. through Dec. through Dec. Jan. 1, 2021 and
31, 2017 31, 2018 31, 2019 31, 2020 Thereafter
Residential1
$420.00 $428.40 $436.97 $445.71 $454.62
Commercial2
Time and materials to purchase, assemble, and deliver carts/bins/boxes to businesses
occupying newly constructed space.
1 For residential new homes, the cost recovery charge is collected with the issuance of the building permit.
2 For new commercial facilities, the cost recovery charge is collected at the commencement of service to new construction that has not been previously occupied.
(Ord. 1600; Ord. 887 § 1, 1990; Ord. 916 § 1, 1991; Res. R1991-177; Res. R1993-227; amended during 8/92 supplementation; amended during 6/94 supplementation; Res. R1994-116; Res. R1997-6; Res R1997-61; amended during 2/01 supplement; Res. R2004-201; amended during 2009 republication; Res. R2011-221; amended during 12/12 supplement; amended during 3/15 supplement; Memo dated 12-21-15; Res. R2016-237; Memo dated 1-3-17; Memo dated 12-29-17; Memo dated 12-18-18; Ord. O2018-21 § 1, 2018; Memo dated 1-6-20; Memo dated 9-16-21; Memo dated 11-17-21; Memo dated 11-21-22; Memo dated 9-7-23; Ord. 2023-15 § 2; Ord. O2023-15 § 2; Ord. O2025-02, 2/18/2025; Ord. O2025-05, 3/ 18/2025)
IV. POLICE DEPARTMENT FEE SCHEDULE.¶
Text read from an image; its layout may differ:
Current Fee ($) DOJ ($) [Additional Fee ]
($)
Accident report copies
(first page) 8.75
(each additional page) 0.10
Arrest clearance letter 20.00
Card dealer permit 45.00 32.00
Card dealer permit (renewal) 45.00 N/A
Crime report copies
(first page) 8.75
(each additional page) 0.10
Citation sign-off—Other agency 20.00
Citation copy 20.00
Text read from an image; its layout may differ:
Current Fee ($) DOJ ($) [Additional Fee ]
($)
Concealed weapons permit 265.00 93.00
CCW, renewal 140.00 52.00
Escort service permit 80.00
Fingerprinting (LiveScan) 30.00 Pending
Firearm intake processing/storage 2.00/day upon
issuance of
87.50
property
receipt
Food vending permit 100.00
Inspections
Tow yard 40.00
Massage clinic permit 162.00 (400.00
if no
certification)
Massage permit renewal 100.00
Merchant patrol permit 40.00
MPD shoulder patches 10.00
Photographs, per case 10.00
Solicitor permit, all 80.00 32.00
Subpoena duces tecum 15.00
Taxi operators permit 60.00 (32 if
new)
Tow truck driver permit 60.00 (32 if
new)
Towed vehicle release (to include state
225.00
impound fee of $25.00)
VIN verification 20.00
Pawn broker/second hand dealer 80.00 300.00
All other business permit clearances 40.00
All other permit renewals 60.00
Audiotapes (person may no longer
10.00
provide own tape)
Videotapes/DVD (person may no longer
10.00
provide own tape/DVD)
(Res. R2010-12; Res. R2025-214, 11/18/2025)
V. (RESERVED)¶
VI. DEVELOPMENT FEES.
Text read from an image; its layout may differ:
WATER FACILITIES DEVELOPMENT FEE
Water Fees by Meter Size, All Land Uses
(effective 4/1/26)
Groundwater Peaking Facility Distribution Total PFIP Water
Meter Size Supply Fee Fee System Fee Fee
5/8″ 1,444 2,217 935 4,596
1″ 2,407 3,704 1,561 7,672
1½″ 4,803 7,386 3,107 15,296
2″ 7,688 11,826 4,972 24,486
3″ 14,424 22,189 9,328 45,941
4″ 24,043 36,988 15,553 76,584
6″ 48,074 73,953 31,098 153,125
8″ 76,923 118,328 49,758 245,009
Text read from an image; its layout may differ:
SEWER FACILITIES DEVELOPMENT FEES
Residential Sewer Collection System Fees
Fee Per Dwelling Unit (effective 4/1/26)
Land Use3 Zone 21 Zone 22 Zone 24 Zone 25 Zone 26
VLDR 409 2,549 1,943 459 1,586
LDR 409 2,549 1,943 459 1,586
MDR 299 1,866 1,419 334 1,159
HDR 299 1,866 1,419 334 1,159
Land Use3 Zone 24(A) Overlay1, 2
Office Professional $160.62
Neighborhood/Community Commercial 176.26
Business/Visitor Services 176.26
General Commercial 176.26
Commercial Recreation 176.26
Light Industrial 366.46
Heavy Industrial 366.46
1 Fees are per dwelling unit for residential land uses and per 1,000 square feet of building for commercial and industrial land uses.
2 Zone 24 in this schedule refers to Sewer Financing Zone 24 set forth in the PFIP Report. Zone 24(A) Overlay in this schedule refers to those development projects within Zone 24 that use any portion of the interim sewer facilities.
3 The impact fee applicable to a land use located in a Planned Employment Center (PEC) is the same as the impact fee for that land use elsewhere in the same financing zone.
Text read from an image; its layout may differ:
Nonresidential Sewer Collection System Fees
$ Per Gallon Per Day (effective 4/1/26)
Land Use Zone 21 Zone 22 Zone 24 Zone 25 Zone 26
All 2.58 15.98 12.16 2.89 9.94
Nonresidential
Text read from an image; its layout may differ:
STORM DRAINAGE FACILITIES DEVELOPMENT FEE
Residential Storm Drainage Fees
Fee Per Dwelling Unit (effective 4/1/26)
Land Use Zone 30 Zone 32 Zone 34 Zone 36 Zone 39
VLDR 176 2,127 1,337 3,258 1,341
LDR 71 851 537 1,304 537
MDR, HDR, and Nonresidential Storm Drainage Fees
Fee Per Acre (effective 4/1/26)
Land Use Zone 30 Zone 32 Zone 34 Zone 36 Zone 39
MDR 587 7,092 4,461 10,872 4,464
HDR 765 9,222 5,799 14,130 5,802
BP 1,056 12,769 8,029 19,565 8,032
CMU 1,056 12,769 8,029 19,565 8,032
GC 1,056 12,769 8,029 19,565 8,032
NC 1,056 12,769 8,029 19,565 8,032
HI 820 9,932 6,245 15,220 6,248
LI 820 9,932 6,245 15,220 6,248
BIP 820 9,932 6,245 15,220 6,248
Text read from an image; its layout may differ:
SUMMARY OF DEVELOPMENT IMPACT FEES
Transportation Financing Plan
Land Use Zone 1 1, 2 Zone 2 1, 2 Zone 3 1, 2 Zone 4 1, 2 Zone 5 1, 2
Very Low Density $ 2,038.00 $ 2,665.00 $ 2,723.00 $ 1,468.00 $ 2,366.00
Residential
Low Density 2,038.00 2,665.00 2,723.00 1,468.00 2,366.00
Residential
Medium Density 998.00 1,952.00 1,996.00 1,069.00 1,725.00
Residential
High Density 826.00 1,597.00 1,639.00 884.00 1,425.00
Residential
Office Professional 3,093.00 6,043.00 6,186.00 3,307.00 5,373.00
Neighborhood/ $ 3,891.00 $ 7,625.00 $ 7,796.00 $ 4,162.00 $ 6,770.00
Community
Commercial
Business/Visitor 3,549.00 6,955.00 7,113.00 3,805.00 6,172.00
Services
General 3,392.00 6,642.00 6,785.00 3,635.00 5,886.00
Commercial
Commercial 32,227.00 63,156.00 64,582.00 34,521.00 56,058.00
Recreational
Light Industrial 1,126.00 2,195.00 2,238.00 1,197.00 1,939.00
Heavy Industrial 2,038.00 2,665.00 2,723.00 1,468.00 2,366.00
1 Fees are per dwelling unit for residential land uses, per net acre for commercial recreation land uses and per one thousand square feet of building for other nonresidential land uses.
2 The zones listed in the resolution codified in this table refer to transportation facilities financing zones set forth in the PFIP report.
COMMERCIAL AND INDUSTRIAL DEVELOPMENT FEE REDUCTION. All commercial or industrial development projects in the city of Manteca with a complete and adequate application for a building permit submitted after October 4, 1999 are eligible to have their PFIP fees reduced. The amount of the fee reduction is determined from a series of matrices and tables corresponding to the ratio of jobs created per one thousand square feet of building, the average annual wage/salary with benefits, the direct tax revenue generated by the project, and the amenity rating approved by the city council. The amount of fee reduction is hereby established in the amounts set forth in Exhibit E of the resolution codified in this paragraph. The amount of the fee reduction cannot exceed the amount of the PFIP fee. The fee reduction program is limited to the amount of Manteca redevelopment agency funds designated for fee reductions. Commercial or industrial development projects that are "wet" industries, as determined by the director of public works on a case-by-case basis based on their demand on the wastewater quality control facility, are not eligible to have their "sewer connection" portion of the fees reduced.
Text read from an image; its layout may differ:
STANDARD DEVELOPMENT AGREEMENT FEE
Per Unit Amount
1—50 Project Allocations Per Year $ 7,725.00
51—99 Project Allocations Per Year 9,375.00
100 and over Project Allocations Per Year 12,375.00
Text read from an image; its layout may differ:
San Joaquin County Multi-Species Habitat Conservation and Open Space Plan Development Fees*
Habitat Type Category A Category B Category C Total Fee Rounded Fee
Open Space $5,528.00 $3,093.00 $314.00 $8,935.00 $8,935.00
AG/Natural $11,065.00 $6,185.00 $627.00 $17,868.00 $17,868.00
Vernal Pool $55,474.00 $15,764.00 $1,424.00 $72,662.00 $72,662.00
(grasslands)
Vernal Pool (wetted) $54,519.00 $127,980.00 $1,395.00 $183,894.00 $183,894.00
- Effective January 1, 2026.
Text read from an image; its layout may differ:
2023 Endowment Fees with In-Lieu Land**
Enhancement Cost/ Land Management Total Per Acre
Type of Preserve acre Cost/acre Endowment
Agricultural Habitat Lands $5,769.00 $764.97 $6,539.00
Natural Lands $5,769.00 $764.97 $6,539.00
Vernal Pool Habitat
Vernal Pool Grasslands $14,791.00 $1,901.76 $16,393.00
Vernal Pool Wetted $117,102.00 $1,864.45 $118,966.00
- ** Effective January 1, 2018—December 31, 2018. In-lieu fees to be used as the endowment for the dedicated land preserves (Category B + C)
VELB Mitigation¶
A special fee category shall apply when removal of the Valley Elderberry Long-Horned Beatle (VELB) habitat of elderberry shrubs occurs. The fee shall be paid to SJCOG, Inc. or a VELB mitigation bank approved by the Permitting Agencies. The current fee, as established in the VELB Conservation Fund Account managed by the Center for Natural Lands Management, and approved by the USFWS, is $1,800.00 per VELB Unit (one unit = one stem over 1″ in diameter at ground level which is removed). Fees shall be established by the JPA during preconstruction surveys (i.e., counts of stems to be removed with and without exit holes shall be completed during preconstruction surveys) and shall be paid to the JPA prior to ground disturbance or stem removal, whichever comes first.
Text read from an image; its layout may differ:
Agriculture Mitigation Fee
Effective 4/15/2026
Agriculture Mitigation Fee Per Acre $3,666.42
Strong Motion Instrumentation Program (SMIP): State Earthquake Fee
Residential 0.00010 x building valuation
Commercial 0.00021 x building valuation
California Building Standards Commission (CBSC) Green Building Fund Fee
(rates effective 1/1/09 per State Bill 1473)
Text read from an image; its layout may differ:
Valuation Fee
$1 to $25,000 $1.00
$25,001 to $50,000 $2.00
$50,001 to $75,000 $3.00
$75,001 to $100,000 $4.00
$100,001 and up add $1.00 for each additional
$25,000 or fraction thereof
Text read from an image; its layout may differ:
PFIP TRANSPORTATION DEVELOPMENT IMPACT FEE
Land Use Fee (effective 4/1/26)
Single Family Residential 10,688 per dwelling unit
Multi-Family Residential (Apartments) 7,469 per dwelling unit
General Office/Business Professional 2,807 per 1000 s.f. bldg
Medical Office Building 9,176 per 1000 s.f. bldg
Community Commercial 8,434 per 1000 s.f. bldg
Text read from an image; its layout may differ:
PFIP TRANSPORTATION DEVELOPMENT IMPACT FEE
Land Use Fee (effective 4/1/26)
Regional Commercial 12,812 per 1000 s.f. bldg
Church 1,395 per 1000 s.f. bldg
Clubhouse 12,844 per 1000 s.f. bldg
Hotel 1,925 per room
Business Industrial Park Subject to Dev. Services Review
Industrial Park/R&D 1,925 per 1000 s.f. bldg
Distribution/High Cube Warehousing 1,025 per 1000 s.f. bldg
Note: This information is based on a Citywide DUE fee.
Total PFIP cost of $215,807,783.12.
[a] If a parking garage is to serve a specific Land Use Category then the PFIP fee would be included in the number of dwelling units or square footage for the project that the parking garage would serve.
[b] If the clubhouse is part of a master planned community, than the PFIP fee would be included in the number of dwelling units and would not be charged separately.
[c] Business Industrial Park fee subject to Community Development Review.
Text read from an image; its layout may differ:
Government Building Facilities Fee Permit Fees
Nonresidential
General Commercial $ 1.71 per sq. ft.
Neighborhood Commercial 1.71 per sq. ft.
Commercial Mixed-Use 1.71 per sq. ft.
Heavy Industrial 0.65 per sq. ft.
Light Industrial 0.88 per sq. ft.
Business Park Industrial 1.71 per sq. ft.
Government Building Facilities Fee (Cont'd)
Business Professional 2.25 per sq. ft.
Major Equipment Purchase Fee
Commercial
Retail stores $ 0.12 per sq. ft.
Hotels, motels 0.10 per sq. ft.
Markets 0.13 per sq. ft.
Professional offices 0.09 per sq. ft.
Text read from an image; its layout may differ:
Government Building Facilities Fee Permit Fees
Restaurants 0.14 per sq. ft.
Other commercial use (auto, steam cleaners, car wash, mortuaries, 0.14 per sq. ft.
and others)
Institutions—This category includes hospitals, care homes, schools 0.08 per sq. ft.
and churches
Industrial—This category includes utility companies, such as PG&E, 0.08 per sq. ft.
telephone companies, etc.
Very low-density residential $6,051.73
Low density residential 6,051.73
Medium density residential 5,046.81
High density residential 4,541.98
Commercial mixed use 4,541.98
Major Equipment Purchase 350.00
Text read from an image; its layout may differ:
Manteca Unified School District Residential/Commercial Property Developer Fee
Residential
Mello Roos Districts (Level $2.96 per s.f. bldg. This fee is paid directly to the
I) School District—call
209-825-3200, ext. 50858 for
Non-Mello Roos Districts 2.96 per s.f. bldg.
more information.
(Level II)
Non-Mello Roos Districts 2.96 per s.f. bldg.
(Level III)
Commercial/Industrial 0.47 per s.f. bldg.
San Joaquin County Facilities Fee
This is a County fee collected by the City of Manteca; call the County at 209-468-3216 for
more information.
Residential
Single-Family $1,826.00 per dwelling unit
Multiple-Family 1,564.00 per dwelling unit
Nonresidential
Retail 0.42 per s.f. bldg.
Office 0.38 per s.f. bldg.
Industrial 0.21 per s.f. bldg.
(Res. R1993-227; Res. R1999-210; Res. R2001-14; Res. R2003-316 (Exh. A); Res. R2003-316 (Exh. C); Res. R2003-316 (Exh. D); Res. R2004-530; Res. R2005-163; Res. R2005-43; Res. 2005-473; Res. R2006-325 (Exh. A); Res. R2006-325 (Exh. C); Res. R2006-325 (Exh. D); Res.
VIII
R2007-504; Res. R2008-489; Memo dated 1-18-08; Memo dated 3-07-08; Res. 2009-12; Res. R2009-344; Res. 2009-344; Memo dated 2-24-09; Memo dated 2-24-09; Res. R2010-205; Memo dated 2-17-10; Memo dated 2-11-10; Res. R2011-170; Res. R2011-170; Memo dated 2-17-11; Memo dated 2-16-11; Res. R2012-143; Memo dated 3-3-12; Memo dated 3-1-12; Memo dated 6-11-12; Memo dated 12-17-13; Memo dated 12-17-13; Memo dated 2-27-13; Memo dated 12-17-13; Res. R2013-31; Res. R2013-31; Res. R2013-31 (Exh. A); Res. R2013-31; Res. R2013-31; Res. R2013-31 (Exh. B); Res. R2013-31; Res. R2013-31; Res. R2013-31 (Exh. C); Res. R2013-175; Res. R2013-31; Res. R2013-31; Memo dated 1-2-14; Memo dated 12-23-14; Memo dated 12-23-14; Memo dated 2-19-14; Memo dated 12-23-14; Memo dated 2-19-14; Memo dated 12-21-15; Memo dated 12-21-15; Memo dated 12-21-15; Memo dated 2-27-15; Memo dated 1-7-15; Res. R2016-217; Memo dated 2-27-16; Memo dated 12-29-17; Memo dated 1-1-17; Memo dated 12-29-17; Memo dated 1-1-17; Memo dated 12-29-17; Memo dated 1-1-17; Memo dated 6-14-17; Memo dated 12-13-17; Res. R2017-146; Res. R2017-146; Res. R2017-143; Res. R2018-173; Memo dated 12-20-18; Memo dated 12-20-18; Memo dated 12-20-18; Memo dated 2-28-18; Memo dated 1-20-18; Memo dated 12-18-18; Memo dated 2-25-19; Memo dated 1-6-20; Res. R2020-163; Memo dated 11-17-21; Memo dated 11-1-21; Memo dated 11-17-21; Memo dated 11-1-21; Memo dated 11-17-21; Memo dated 11-1-21; Memo dated 9-15-21; Memo dated 11-17-21; Memo dated 11-1-21; Memo dated 9-16-21; Memo Dated 2-7-22; Memo dated 2-1-22; Res. R2022-177; Res. R2022-177; Res. R2023-149; Memo dated 9-7-23; Memo dated 9-7-23; Memo dated 9-7-23; Memo dated 2-6-23; Memo dated 9-7-23; Memo dated 12-6-23; Memo dated 1-3-23; Memo dated 7-31-24; Memo dated 12-12-2024;Memo dated9-30-2025; Res. R2025-205, 11/4/2025; Memo dated 3/9/2026; Memo dated 3/25/2026)
VII. REGIONAL TRANSPORTATION IMPACT FEE (RTIF).¶
Below are the revised fees for the regional transportation impact fee (RTIF), referenced in MMC Section 13.46.040:
Text read from an image; its layout may differ:
Annual RTIF Programmatic Fee Adjustment
Land Use Type FY 2025-26 Fee
Residential Single-Family $2.13 /SF
Residential Multi-Family $3.35 /SF
Retail $1.84 /SF
Office $2.32 /SF
Commercial/industrial $1.57 /SF
Warehouse $0.78 /SF
Other (per trip) $159.08 /trip
Section 13.46.040(B) states the fee shall be automatically adjusted on an annual basis beginning of each fiscal year (July 1st) based on the Engineering News Record California Construction Code Index. The new fees are effective on July 1, 2023.
(Memo dated 6-26-07; Staff report dated 5-09; Memo dated 6-18-10; Memo dated 5-3-12; Memo dated 7-3-14; Memo dated 6-20-15; Staff report dated 5-17; Staff report dated 5-18; Memo dated 6-28-21; Memo dated 5-26-23; Memo dated4-25-25)
City of Manteca, CA VIII
MANTECA CODE
IX
VIII. VIOLATION OF ADMINISTRATIVE ENFORCEMENT PROVISIONS.¶
The following fees are for the violation of the administrative enforcement provisions. These fees shall become effective upon the city council adopting Ordinance No. 1457 establishing Sections 1.10.010 through 1.10.510 of the Manteca Municipal Code.
Text read from an image; its layout may differ:
- First citation $100.00
2. Second citation for the same violation $200.00
3. Third and subsequent citations for the $500.00
same violation
1.10.060 Assessment of Fees Recovery of actual cost not less than $25.00
and not to exceed $1,100.00.
1.10.450 Hearing Fee Recovery of actual costs not to exceed
$2,000.00. (This amount to be placed on
deposit with the city at the time of application
for appeal. Those monies in excess of the
appeal costs to be returned to applicant after
completion of the appeal process.)
(Res. R2010-24; Res. R2010-219)
IX. BUILDING SAFETY FEE SCHEDULE.¶
Text read from an image; its layout may differ:
Fee Description Fee Code Unit Fee
Residential & Commercial New Construction New Const Permit % of valuation 0.80%
and Additions (Permit Fee)
Residential & Commercial New Construction New Const PC % of permit fee 85%
and Additions (Plan Review Fee)
Residential Remodels and Commercial TIs Remodel Permit % of valuation 0.80%
(Permit Fee)
Residential Remodels and Commercial TIs Remodel PC % of permit fee 85%
(Plan Review Fee)
Permit Administration Fee Permit Admin Flat $364
Minimum Permit Fee - Flat $126
SINGLE
Single Family Production Repeat SFD Prod Repeat % of valuation 0.80%
Production Repeat Single Family Dwelling SFD Repeat Flat $364
Administrative Fee Admin
MWELO Landscape Fee - Residential MWELO % of Permit Fee 11%
Residential
Plot Plan Revision Plot Plan Rev Per app $77
Master Plan Check Fees (SFD Track Housing) Master Plan PC % of valuation 2.4%
Text read from an image; its layout may differ:
Fee Description Fee Code Unit Fee
RESIDENTIAL
Bathroom Remodel Or Repair Bathroom Per app $286
Remodel
Electrical Appliances Electrical App Per app $73
Electrical Circuits (First) Electrical Circ Per app $90
Electrical Circuits (Each Additional) - Per app $12
Electrical Panels Elec Panel Res Per app $119
Energy Storage System ESS Per app $304
EV Charging Station EV Charg Station Per app $311
Fence Fence Per app $233
Fireplace Insert Fireplace Insert Per app $130
Flag Pole Flag Pole Res Per app $351
Gas Piping System Gas Piping Per app $146
Grading Permit Fee (Building Admin Grading Permit Per app $38
Department)
Hot Tub / Spa Portable Spa/Hot Tub Port Per app $74
HVAC System Replacement HVAC Residential Per app $79
Kitchen Remodel Or Repair (W/O Structural Kitchen Remodel Per app $326
Modifications)
Misc. Inspection Misc Insp Res Per app $122
Misc. Each Additional Inspection Per app $79
Patio Covers & Gazebos Patio Cover Per app $413
Patio Covers & Gazebos (ICC/IAPMO Patio Cover ICC Per app $183
Approved)
Plumbing Fixture Plumbing Fixture Per app $39
Re-Roof Residential Reroof Resident Per app $119
Sewer Repair Sewer Repair Per app $79
Shed Shed Per app $573
Shower/Bathtub Replacement Shower/Bath Rep Per app $122
Solar Photovoltaic - Residential (Rooftop) Solar PV Resid Per app $378
Solar Pool Heating System Solar Pool Heat Per app $109
Stucco or Siding Stucco / Siding Per app $119
Swimming Pool (No Master Plan) Swimming Pool Per app $645
Text read from an image; its layout may differ:
Fee Description Fee Code Unit Fee
Swimming Pool Master Plan Swimming Pool Per app $294
MP
Swimming Pool With Approved Master Plan Swim Pool w/ MP Per app $339
Temp Power Pole Temp Power Pole Per app $39
Ventilation Fan Ventilation Fan Per app $79
Water Heater Replacement - (Like for Like) Water Heater Per app $79
Water Piping System Water Piping Sys Per app $146
Water Softener Water Softener Per app $79
Window Replacements Window Replace Per app $58
Permit Administration Fee Permit Admin Flat $77
COMMERCIAL
Awning (First) Awning Per app $246
Awning (Each Additional) Per app $69
Cell Tower Cell Tower Per app $774
Commercial Coach Commercial Coach Per app $553
Electrical Panel Electric Pan Com Per app $181
Flag Pole Flag Pole Com Per app $365
HVAC System Replacement HVAC Per app $79
Commercial
HVAC Replacement - Each Additional - Per app $42
Misc. Inspection (1 Stop) Misc Insp Com Per app $113
Misc. Inspection (Each Additional Inspection) - Per app $79
Photovoltaic System - Up To 50 kW Solar PV Com Per app $1,000
Photovoltaic System - Each Additional Kw. - Per app $7
(51-250kW)
Photovoltaic System - Each Additional Kw. - Per app $5
(251+kW)
Reroof - First 10 Squares Reroof Com Per app $119
Reroof - Each Additional 10 Squares - Per app $39
Sewer Repair Sewer Repair Per app $79
Sign - Free Standing/Pole Sign - Free/Pole Per app $335
Wall Sign (Illuminated or Non-Illuminated) Sign - Wall Per app $207
Swimming Pool - Less Than 1000 Sf Swim Pool Com Per app $1,018
<
Text read from an image; its layout may differ:
Fee Description Fee Code Unit Fee
Tank Installation Tank Install Per app $207
Temp Power Pole Temp Power Pole Per app $38
Water Heater Replacement - (Like for Like) Water Heater Per app $75
Permit Administration Fee Permit Admin Flat $70
OTHER/MISCELLANEOUS FEES
Board of Appeals Application Fee Board Appeals Ap Per app $1,801
Business License Inspection Bus Lic Inspect Per app $122
Fee Deferral Fee Deferral Per app $347
Fee for Additional Plan Checking and for Plan Add Plan Check Per hour $294
Revisions: (Actual Cost)
Misc. Inspection (Hourly Rate) Misc Insp hr Per hour $159
Misc. Plan Check (Hourly Rate) Misc PC hr Per hour $255
Permit Reissuance (Permits expired less than 1 Permit Reissue Per app $407
Year with no changes to plans)
Permit Extension/Application Extension Permit/App Exten Per app $75
(Subject to review and approval)
Plan Retention/Technology Fee Plan Retention % of permit fee 5%
Reinspection Fee Reinspection Per unit $118
Service Requested Outside of Regular Working Outside Reg Hour Per app $716
Hours (3 Hour Min)
Special Inspection Application (For City List) Spec Insp App Per app $255
For services required but not listed above (at Hourly Rate Hourly Rate Hourly Rate
the applicable hourly rate)
DEMOLITION PERMIT FEES
Small Residential (i.e. Patio Cover, Shed, etc.) Small Res Demo Per app $52
Single Family Dwelling Single Fam Demo Per app $118
Commercial Demolition Commercial Demo Per app $373
Demolition Permits for Removal Of Demo Tank Per app $159
Underground Tanks
Multifamily Demolition Multi Fam Demo Per app $373
HOURLY RATES BY POSITION
Chief Building Official Hour by Position per hour $303
Senior Plan Check Engineer per hour $255
Building Inspector per hour $159
Text read from an image; its layout may differ:
Fee Description Fee Code Unit Fee
Development Services Technician per hour $155
PLANNING DIVISION FEES
APPLICABLE TO BUILDING PERMITS
Commercial, Multi-Family, Mixed Plan Com M-F/ Per app $962
Mix
Commercial (Tenant Infill - Occupancy) Plan Com TI-Occ Per app $210
Residential (Addition - Minor) Plan Res Add Per app $93
Single Family Dwelling (Tract - Plot Plan) Plan SFD Plot Pl Per app $43
Signs Plan Signs Per app $140
Residential Master Plan - Plan Review Plan MP Review Per app $392
Long Range Planning Surcharge (per square Plan Long Range Per Sq. Ft. $0.20
foot, all new construction)
MWELO Landscape Fee - Residential (if MWELO Resi MWELO Fee 11% of
applicable) permit fee
MWELO Landscape Fee - Commercial (if MWELO Com MWELO Fee 5% of permit
applicable) fee
ENGINEERING DIVISION FEES
APPLICABLE TO BUILDING PERMITS
MS-4 Commercial - Per Acre MS-4 Commercial Per app $2,918
MS-4 Residential - Per Lot MS-4 Residential Per app $260
(Res. 2010-149; Res. R2011-54; Res. R2012-181; Res. 2013-201; Res. R2016-196; Res. R2017-118; Res. R2023-60)
X. ENGINEERING FEE SCHEDULE.¶
Text read from an image; its layout may differ:
Fee Description Fee
PLAN CHECK:
Plan Check 0-$500,000 (Engineers Cost Estimate) $7493 or 3% of Engineers Cost
Estimate (whichever is less)
Plan Check $500,000 or greater (Engineers Cost Estimate) 2.43% of Engineers Cost
Estimate
Master Plans (per acre) $169
Plan check after 3rd Submittal Hourly Rate
Post-Construction Manual Compliance (MS-4), $5,600
Commercial, Industrial, Multi-Family
Post-Construction Manual Compliance (MS-4), Single $520
Family Residential
Text read from an image; its layout may differ:
Fee Description Fee
CONSTRUCTION INSPECTION
Inspection 0-$500,000 Eng. Cost Est. (or 6% whichever is $18,441
less)
Inspection $500,000 or greater (Engineers Cost Estimate) 3.18% of Engineers Cost
Estimate
DOCUMENT REVIEW
Final Parcel Map Processing Fee (Manteca Admin fee on $791
top of County fee)
Legal Description (easements, dedications, etc) $902
Survey monument preservation (per Corner Record) $201
Elevation Certificate Review $384
Submittal Review $480
PERMIT PROCESSING
Encroachment Permit (without traffic control) $365
Encroachment Permit with Traffic Control Plan (one day of $725
work)
Encroachment Permit (w/ Road Closure) $1,197
Encroachment Permit with Traffic Control Plan (each $164
additional day)
Encroachment Permit (Special) Deposit Required Based On
Engineering Est.
Transportation Permit - single State Sets
Encroachment Permit - USA Marking Residential per 200 $211
ft.
Encroachment Permit - USA Marking Commercial per 200 $423
ft.
Transportation Permit - single State Sets
Transportation Permit - annual State Sets
MISCELLANEOUS
Due diligence meeting (engineering support to entitled Hourly Rate
projects) (hourly-first hour/no charge)
ENGINEERING PRODUCTIVE HOURLY RATES
BY POSITION:
Director of Engineering/City Engineer $318
Deputy Director of Engineering $248
Senior Engineer $232
Text read from an image; its layout may differ:
Fee Description Fee
Associate Engineer $179
Engineering Tech $107
Assist Engineer $160
Construction Inspector $148
Driveway $122
Curb/Gutter/Sidewalk - replace / repair (per 20 L.F. or $41
portion thereof)
Trench Cut (each) - per 25 L.F. or portion thereof (based $204
on longest cut dimension), 5 ft depth max
Trench Cut (each) - per 25 L.F. or portion thereof (based $366
on longest cut dimension), >5 ft depth
Temporary water permit $60
ENGINEERING DIVISION FEES FOR ENTITLEMENT PROJECTS
*These fees are in addition to the Planning Division Fees
ANNEXATION
Annexation (LAFCo Fees Not Included) $3,194
DEVELOPMENT AGREEMENT
Development Agreement $2,990
DA Amendment (Administrative Review) $1,429
DA Amendment (Public Hearing) $1,925
ENVIRONMENTAL
Environmental Impact Report $1,938
MISCELLANEOUS
Lot Line Adjustment/Reversion to Acreage $1,435
Certificate of Compliance $1,460
Entitlement Extension $796
PLANNED DEVELOPMENT
Planned Development 0-10 Acres $1,008
Planned Development Greater than 10 Acres $1,008
Planned Development Amendment (Administrative $565
Decision)
Planned Development Amendment (Public Hearing) $923
SITE PLAN REVIEW:
Text read from an image; its layout may differ:
Fee Description Fee
Preliminary Staff Review (amount credited to project $792
application)
Site Plan Review - Res. 2-4 units $1,659
Site Plan Review - Res. 5 or more units $2,568
Site Plan Review - Non Residential - 5 acres or less $1,659
Site Plan Review - Non-Residential. - Greater than 5 acres $2,568
Minor Plan Modification/Minor Site Plan $552
SPECIFIC PLANS:
Specific Plan/Master Plan Prep. Processing & Review $14,300
(Staff admin. does not include consultant cost.)
Specific Plan/Master Plan Amendment Major $4,165
Specific Plan/Master Plan Amendment Minor $2,318
Tentative Parcel Map $1,740
Tentative Map 5-50 lots $3,622
Tentative Map Greater than 50 lots $5,497
Tentative Map Extension $796
USE PERMITS:
Conditional Use Permit $357
Minor Use Permit $357
Temporary Use Permit $228
(Res. 2010-149; Res. R2011-54; Res. R2016-196; Res. R2017-118; Res. R2023-60)
XI. FIRE PREVENTION FEES.¶
Text read from an image; its layout may differ:
Fee Description Fee
Fire Prevention Plan Review 0.6%
Fire Prevention Inspection 0.6%
Fire Prevention Plan Review and Inspection (new 0.2% of new construction
commercial construction) valuation
FIRE ITEMS INTAKE AND PROCESSING (Fire
Fee):
Fire Alarm Systems (new or TI) (plan check &
inspection):
1 - 50 Devices $260
> 50 Devices $371
Text read from an image; its layout may differ:
Fee Description Fee
Fire Suppression / Protection Sys.:
Residential - Custom $60
Residential - Master Plan $250
Fire Suppression / Protection Sys. - Commercial - New:
1 - 100 Fire sprinklers (plus any outside consultant fee) $492
101 - 300 Fire sprinklers (plus any outside consultant fee) $660
301 - 700 Fire sprinklers (plus any outside consultant fee) $820
> 701 Fire sprinklers (plus any outside consultant fee) $1,028
Fire Suppression / Protection Sys. - Commercial - TI:
1 - 10 Sprinklers $141
11 - 50 $244
51 - 100 $315
> 100 $473
Automatic Fire Extinguishing System (Halon/Cleaning $166
Agent, Hood and Duct, etc.)
Fire Pump $363
Tank Installation / Removal:
Underground Install $92
Underground Remove $72
Aboveground Install $124
Aboveground Remove $107
Solar Power Systems
Commercial $50
OPERATIONAL PERMITS (* denotes a renewable
permit):
Aerosol Products* $87
Aircraft Refueling Vehicle* $141
Aircraft Repair Hanger* $141
Fee Description Fee
Amusement Buildings $101
Auto Wrecking Yard* $117
Aviation Facilities* $173
Battery Systems* $45
Text read from an image; its layout may differ:
Fee Description Fee
Special events in assembly areas $109
Carnivals / Fairs / Circus $141
Combustible Dust Operations $109
Combustible Materials Storage* $77
Commercial Rubbish Handling Operation* $77
Compressed Gases* $60
Cryogenic Fluids* $77
Cutting & Welding* $69
Dry Cleaning Plants* $205
Dust Producing Operation* $109
Exhibits & Trade Shows $109
Explosives or Blasting Agents* $369
Fire Hydrants & Valves (flow tests) $77
Fireworks Displays (4-hour min) $744
Fireworks Pyrotechnic Special Effects (Theatrical/Movies) $1,502
(4-hour min)
Flammable & Combustible Liquids - Containers/Tanks* $109
Flammable & Combustible Liquids - Underground Tanks* $109
Flammable & Combustible Liquids* $109
Fumigation or Thermal Insecticide Fogging $13
Hazardous Materials (storage/use)* $112
High-Piled Storage* $77
Hot Work, Cutting & Grinding Operations $45
Impairments (planned) - Fire Protection Systems $211
Knox Box - Residential* $28
Liquefied Petroleum Gases (store, use, handle, dispense)* $156
Fee Description Fee
Lumber Yards* $78
Misc. Combustible Storage > 2,500 cf* $77
Motor Vehicle Fuel Dispensing Station* $77
Open Fires - (includes recreational & bonfires) $92
Organic Coatings* $124
Parade Floats $13
Text read from an image; its layout may differ:
Fee Description Fee
Private Fire Hydrants 1-10 hydrants $77
Private Fire Hydrants each additional $10
Refrigeration Equipment* $77
Repair Garages* $45
Spraying or Dipping* $77
Tents, Canopies or Membrane Structures < 400 square $34
feet
Tents, Canopies or Membrane Structures > 400 square feet $45
Tire Storage* $141
Waste Handling Facilities* $141
Welding / Cutting Operations* $45
Wood Products* $60
Operating without required permit (x2 permit fee)
Operational Fees (Annual):
State Mandated Inspections
Apartment/Hotels/Motels
5 - 25 (units) $71
26 - 50 $92
51 - 100 $135
101 - 200 $167
201 or more $199
Day Care - Commercial (I-4/E) $99
Day Care - Residential (R-3) $99
Medical Facility (I-2.1) $154
Fee Description Fee
Schools (E) $338
Hospitals (I-2) $803
Senior Housing Facility/Elderly Care/Residential Care
(R-4)
9 - 49 (occupants) $138
50 or above $170
Halfway Houses (I-1)
Less than 25 (occupants) $74
XII
Text read from an image; its layout may differ:
Fee Description Fee
26 or more $106
Places of Assembly- (A-3)
50 - 300 (Occupants) $109
301 - 1,000 $130
1,001 or more $173
Special Hazard*
Liquid Petroleum Gas (More than 500 liquid gallons) $156
Motor Vehicle Fuel Dispensing Station $77
Refrigeration Materials $77
User Fees:
Carnival and Fairs $141
Christmas Tree Lots $74
Hydrant Flow/Hydraulic Testing per hydrant $77
Productive Hourly Rates by Position:
Fire Marshal (sworn) $248
Fire Inspector (civilian) $128
Admin $38
Fire Inspector / Plan Checker (civilian) $158
(Res. 2010-149; Res. R2011-54; Res. 2013-201; Res. R2016-196)
XII. PARKS AND RECREATION REVIEW FEE SCHEDULE.¶
Text read from an image; its layout may differ:
Public Works Department - Parks Planning and Development Fee Schedule
Description Fee Unit Notes
PLAN CHECK:
Plan Check 0—$500,000 Eng $10,655 Per set of Plan check assumes 3 submittals,
Cost Est plans additional submittals will be
charged hourly.
Plan Check $18,755 Per set of Plan check assumes 3 submittals,
$500,001—$1,000,000 Eng Cost plans additional submittals will be
Est charged hourly.
Plan Check $1,000,001 and $27,270 Per set of Plan check assumes 3 submittals,
greater Eng Cost Est plans additional submittals will be
charged hourly.
CONSTRUCTION INSPECTION: STREETSCAPE
XII
XII
Text read from an image; its layout may differ:
Public Works Department - Parks Planning and Development Fee Schedule
Description Fee Unit Notes
Inspection 0—$500,000 Eng Cost $7,575 Flat
Est
Inspection $500,001—$1,000,000 $14,535 Flat
Eng Cost Est
Inspection $1,000,001 and greater $20,900 Flat
Eng Cost Est
CONSTRUCTION INSPECTION: PARKS
Inspection 0—$500,000 Eng Cost $10,035 Flat
Est
Inspection $500,001—$1,000,000 $19,350 Flat
Eng Cost Est
Inspection $1,000,001 and greater $27,105 Flat
Eng Cost Est
SITE PLAN REVIEW:
Preliminary Site Plan Review $600 Per app.
Site Plan Review — Res. 2—4 $300 Per app.
units
Site Plan Review — Res. 5—15 $460 Per app.
units
Site Plan Review — Res. 16 or $765 Per app.
more units
Site Plan Review — Comm./Ind. $520 Per app.
One acre or less
Site Plan Review — Comm./Ind. $765 Per app.
1.1—12 acres
Site Plan Review — Comm./Ind. $1,285 Per app.
12.1 acres or more
Minor Plan Modification $520 Per app.
SUBDIVISIONS:
Tentative Parcel Map $765 Per app.
Tentative Map 5—50 lots $1,065 Per app.
Tentative Map 51—100 lots $1,530 Per app.
Tentative Map 101 lots or more $2,255 Per app.
Community District Facilities
CFD — Unanimous Approval $9,575 Per app.
Form
XII
XIII
Text read from an image; its layout may differ:
Public Works Department - Parks Planning and Development Fee Schedule
Description Fee Unit Notes
CFD — Formation $19,550 Per app.
CFD — Standard Annexation $19,550 Per app.
CFD — Map Expansion $19,550 Per app.
PARKS PLANNING AND DEVELOPMENT PRODUCTIVE HOURLY RATES BY
POSITION:
Deputy Director $284 Per hour
Landscape Maintenance $154 Per hour
Supervisor
Park Project Coordinator $176 Per hour
Parks Planning and Development $196 Per hour
Manager
Parks Manager $196 Per hour
Senior Landscape Technician $141 Per hour
Park Project Coordinator (Part $62 Per hour
Time)
(Res. 2010-149; Res. R2016-196; Res. R2025-202, 10/21/2025)
XIII. PLANNING FEE SCHEDULE.¶
Text read from an image; its layout may differ:
Fee Description Fee
ANNEXATION:
Annexation $10,501
LAFCO Fees — ref. LAFCO fee schedule
Prezone/Rezone 0-5 acres $9,301
Prezone/Rezone greater than 5 acres $15,724
APPEALS:
Appeal (applicant or non-applicant) $3,148
BUILDING PLAN CHECK & INSPECTION:
Commercial, Multi-Family, Mixed $1,094
Commercial (TI - Occupancy) $289
Residential (Addition - Minor) $128
Single Family Dwelling (Tract - Plot Plan) $51
Residential Master Plan $409
DEVELOPMENT AGREEMENT:
XIII
Text read from an image; its layout may differ:
Fee Description Fee
Development Agreement $21,785
DA Amendment (Administrative Review) $7,578
DA Amendment (Legislative Review) $14,593
DA Annual Review $3,031
ENVIRONMENTAL:
Mitigation Monitoring and Reporting Program - EIR Only $4,812
Environmental Impact Report (Staff admin fee only. Does not $22,961
include Consultant cost)
Initial Study-Negative Declaration (Staff admin fee only. Does $14,757
not include Consultant cost)
Initial Study-Negative Declaration (Staff prepared. Does not $22,179
include Consultant cost of supporting studies)
Environmental Determination $607
GENERAL PLAN:
General Plan Amendment $13,454
MISC:
Business License Planning Review Fee $128
Certificate of Compliance $1,169
Condo Conversion $9,947
Home Occupation Permit $197
Lot Line Adjustment/Reversion to Acreage $2,350
Williamson Act Cancellation $14,027
Large Family Daycare $193
PLANNED DEVELOPMENT:
Planned Development 0-10 Acres $12,774
Planned Development greater than 10 acres $14,504
PD Amendment (Administrative Decision) $4,015
PD Amendment (Legislative Decision) $8,002
LONG RANGE PLANNING:
Long Range Planning Surcharge (Per SF, New Construction) $0.18
SEWER ALLOCATION:
Point Rating Application Residential $1,084
SIGN PERMITS:
XIII
XIII
Text read from an image; its layout may differ:
Fee Description Fee
Subdivision Temporary Sign Permit $348
Master Sign Program $1,821
Major Sign Permit $193
Temporary Sign Permit $103
Portable Sign Permit $103
SITE PLAN REVIEW:
Preliminary Staff Review (amount credited to project $1,080
application)
Site Plan Review - Residential 2-4 units $5,791
Site Plan Review - Residential 5 or more units $10,527
Site Plan Review - Non-Residential 5 acres or less $7,834
Site Plan Review - Non-Residential greater than 5 acres $12,011
Minor Plan Modification / Minor Site Plan $4,135
Major Plan Adjustment $512
Minor Plan Adjustment $263
SPECIFIC PLANS:
Specific Plan / Master Plan Amendment Major $8,668
Specific Plan / Master Plan Amendment Major $5,778
Specific Plan / Master Plan (Staff admin. fee only. Does not $34,707
include Consultant cost)
STORAGE CONTAINERS PERMITS:
Permanent Storage Container Permit $166
Temporary Storage Container Permit $85
SUBDIVISIONS:
Tentative Parcel Map $5,733
Tentative Subdivision Map 5-50 lots $12,299
Tentative Subdivision Map greater than 50 lots $14,647
Tentative Map Extension $3,531
USE PERMITS:
Conditional Use Permit - New Construction $9,291
Conditional Use Permit - Existing $1,530
Minor Use Permit $3,718
Temporary Use Permit $477
XIII
XIII
Text read from an image; its layout may differ:
Fee Description Fee
ZONING:
Minor Zone Modification $2,907
Variance $10,786
Zoning Text Amendment $11,820
Zoning Research Letter $289
ENGINEERING PLAN CHECK AND INSPECTION:
Final map/improvement plan review For services required but $929
not listed above (at the applicable hourly rate)
PLANNING PRODUCTIVE HOURLY RATES BY
POSITION:
CD Director $303
Planning Manager $281
Senior Planner $243
Associate Planner $221
Assistant Planner $193
Admin Assistant III $155
(Res. 2004-538; Res. R2011-54; Res. R2016-196; Res. R2017-118; Ord. O2018-11 § 1; Res. R2023-60)
Get a plain-English answer with a citation back to this text.
Ask AI about this code