Chapter 6 — BUILDING CODES AND REGULATIONS›Article II — CALIFORNIA BUILDING CODE
Article II — CALIFORNIA BUILDING CODE
Los Gatos Municipal Code · 2026-09 edition · updated 2026-10-02 · Los Gatos
Sec. 6.20.010. - Adopted.¶
The 2024 International Building Code (IBC), as amended by the State of California Building Standards Commission and known as the 2025 California Building Code (CBC), California Code of Regulations Title 24, Part 2, Volumes 1 and 2, with Appendix I, is adopted by reference and amended as follows:
(2380, § 2, 12-2-25)
Sec. 6.20.020. - IBC oversight.¶
The California adoption of the new 2024 International Building Code may have inadvertently eliminated some construction requirements by oversight or erroneous reference to another code. In cases where the code adoption has inadvertently deleted or mis-referenced necessary construction requirements, the Town of Los Gatos Building Official may authorize use of construction requirements from the last previously adopted International Codes.
(2380, § 2, 12-2-25)
Sec. 6.20.030. - Schedule of permit fees.¶
Section 109.2 is amended to read as follows:
Section 109.2 Schedule of permit fees. Where a permit is required, a fee for each permit shall be paid as required, in accordance with the schedule as established by the (Town Council).
Section 109.2.1 is added to read as follows:
109.2.1. Plan Review Fees. When submittal documents are required by Section 109, a plan review fee shall be paid at the time of submitting the submittal documents for plan review. The plan review fee shall be 65 percent of the building permit fee. The plan review fees specified in this section are separate fees from the permit fees and are in addition to the permit fees.
When submittal documents are incomplete or changed so as to require additional plan review or when the project involves deferred submittal items as defined in Section 107.3.4.1, an additional plan review fee shall be charged at the per-hour plan review rate as adopted by the Town of Los Gatos.
Section 109.6.1 is added to read as follows:
109.6.1. Refunds. The building official may authorize refunds of Building Division fees which were erroneously paid or collected.
The building official may authorize refunding of not more than 80 percent of the permit fee paid when no work or inspections have been done under an issued permit.
The building official may authorize refunding of not more than 80 percent of the collected plan review fee when the plan check application is withdrawn or cancelled prior to any plan review work being done.
The building official shall not authorize refunding of any collected fee until a written request for a refund by the original permittee or applicant is received. Requests must be received no later than 180 days after the date of the fee payment.
(2380, § 2, 12-2-25)
Sec. 6.20.040. - Automatic sprinkler systems.¶
Section 903.2 of the California Building Code adopted by this article is amended to read as follows:
903.2 Where required. Approved automatic sprinkler systems in new and existing buildings and structures shall be provided in the locations described in either this Section or in Sections 903.2.1 through 903.2.12.
For the purposes of this Section, firewalls and fire barriers used to separate building areas shall be constructed in accordance with the California Building Code and shall be without openings or penetrations.
An automatic sprinkler system shall be provided throughout all new buildings and structures, other than Group R occupancies, except as follows:
a.
Buildings and structures not located in any Wildland-Urban Interface and not exceeding 1,200 square feet of fire area.
b.
Buildings and structures located in any Wildland-Urban Interface Fire Area and not exceeding 500 square feet of fire area.
c.
Group S-2 or U occupancies, including photovoltaic support structures, used exclusively for vehicle parking which meet all of the following:
i.
Noncombustible construction.
ii.
Maximum 5,000 square feet in building area.
iii.
Structure is open on not less than three (3) sides nor 75% of structure perimeter.
iv.
Minimum of 10 feet separation from existing buildings, or similar structures, unless area is separated by fire walls complying with California Building Code 706.
d.
Canopies, constructed in accordance with CBC 406.7.2, used exclusively for weather protection of vehicle fueling pads per CBC 406.7.1 and not exceeding 5,000 square feet of fire area.
An automatic sprinkler system shall be installed throughout all new buildings with a Group R fire area.
Exception: Accessory Dwelling Unit, provided that all of the following are met:
a.
The unit meets the definition of an Accessory Dwelling Unit as defined in the Government Code Section 65852.2.
b.
The existing primary residence does not have automatic fire sprinklers.
c.
The accessory dwelling unit does not exceed 1,200 square feet in size.
d.
The unit is on the same lot as the primary residence.
e.
The unit meets all apparatus access and water supply requirements of Chapter 5 and Appendix B of the 2022 California Fire Code.
An approved automatic fire sprinkler system shall be installed in new manufactured homes (as defined in California Health and Safety Code Sections 18007 and 18009) and multifamily manufactured homes with two dwelling units (as defined in California Health and Safety Code Section 18008.7) in accordance with Title 25 of the California Code of Regulations.
An automatic sprinkler system shall be installed throughout existing buildings with a Group R fire area when additions are made causing the fire area to exceed 3,600 square feet.
Exception: Additions where all of the following are met:
a.
Building addition does not exceed 500 square feet.
b.
The resultant structure meets all water supply requirements of Chapter 5 and Appendix B of the 2022 California Fire Code.
An automatic sprinkler system shall be provided throughout existing Group A, B, E, F, L, M, S and U buildings and structures, when additions are made that increase the fire area to more than 3,600 square feet or that create conditions described in Sections 903.2.1 through 903.2.18.
Any change in the character of occupancy or in use of any building with a fire area equal to or greater than 3,600 square feet which, in the opinion of the Fire Code Official or building official, would place the building into a more hazardous division of the same occupancy group or into a different group of occupancies and constitutes a greater degree of life safety 1 or increased fire risk 2 , shall require the installation of an approved fire automatic fire sprinkler system.
1 Life Safety - Shall include, but not limited to: Increased occupant load, public assembly areas, public meeting areas, churches, indoor amusement attractions, buildings with complex exiting systems due to
increased occupant loads, large schools/day-care facilities, large residential care facilities housing non- ambulatory clients.
2 Fire Risks - Shall include but not be limited to: High-piled combustible storage, woodworking operations, hazardous operations using hazardous materials, increased fuel loads (storage of moderate to highly combustible materials), increased sources of ignition (welding, automotive repair with the use of flammable liquids and open flames).
A Section 903.2.11.7 is added to read as follows:
903.2.11.7 Chemical Fume Hood Fire Protection.
Approved automatic fire extinguishing systems shall be provided in chemical fume hoods in the following cases:
Existing hoods having interiors with a flame spread index greater than 25 in which flammable liquids are handled
If a hazard assessment determines that an automatic extinguishing system is required for the chemical fume hood, then the applicable automatic fire protection system standard shall be followed.
Section 907.8 is amended to read as follows:
907.8 Inspection, testing and maintenance.
The maintenance and testing schedules and procedures for fire alarm and fire detection systems shall be in accordance with California Fire Code Sections 907.8.1 through 907.8.4 and NFPA 72. Records of inspection, testing and maintenance shall be documented using NFPA 72 record of inspection and testing forms.
(2380, § 2, 12-2-25)
Sec. 6.20.050. - Smoke control systems.¶
Section 909.22.1 is added to read as follows:
909.22.1 Schedule. A routine maintenance and operational testing program shall be initiated immediately after the smoke control system has passed the acceptance tests. A written schedule for routine maintenance and operational testing shall be established and operational testing must occur at least annually.
(2380, § 2, 12-2-25)
Sec. 6.20.060. - Roof drainage.¶
Section 1502 is amended to add Section 1502.5 to read as follows:
Section 1502.5 Over Public Property.
Roof drainage water from a building shall not be permitted to flow over public property.
Exception(s):
Group R3, and Group U Occupancies.
Other occupancies where the drainage plan and method of drainage have been approved by the "Building Official."
Sec. 6.20.070. - Roof covering requirements in a wildland-urban interface fire area and…¶
Section 1505.1.2 is amended to read as follows:
1505.1.2 Roof coverings within all other areas.
The entire roof covering of every existing structure where more than 50 percent of the total roof area is replaced within any one-year period, the entire roof covering of every new structure, and any roof covering applied in the alteration, repair or replacement of the roof of every existing structure, shall be fire-retardant roof covering that is at least Class A.
(2380, § 2, 12-2-25)
Sec. 6.20.080. - Concrete strength.¶
Section 1705.3, Exception 1, is amended to read as follows:
Exception: Special inspections and tests shall not be required for:
Isolated spread concrete footings of buildings three stories or less above grade plane that are fully supported on earth or rock where the structural design of the footing is based on a specified compressive strength, f'c, not more than 2,500 pounds per square inch (psi) (17.2 Mpa) regardless of the compressive strength specified in the construction documents or used in the footing construction.
(2380, § 2, 12-2-25)
Sec. 6.20.090. - Limits on methods using gypsum board and cement plaster.¶
Table 2308.10.1 Wall Bracing Requirements is amended to read as follows:
The title of Table 2308.10.1 is amended to read:
TABLE 2308.10.1 a, f, g
Footnotes "f" and "g" are added to Table 2308.6.1, to read as follows:
f.
Methods PBS, HPS, and SFB are not permitted in Seismic Design Categories D or E.
g.
Methods GB, DWB, and PCP are not permitted in Seismic Design Category E.
(2380, § 2, 12-2-25)