Chapter 11 — DISCARDED MATERIALS, CONSTRUCTION AND DEMOLITION DEBRIS, EXCLUDED WASTE, AND WEEDS
Los Gatos Municipal Code Art. VI Construction and Demolition Debris Disposal Reduction
Los Gatos Municipal Code · 2026-10 edition · updated 2026-10-04 · Los Gatos
Cite as: Los Gatos Municipal Code Article VI · Text as of 2026-10-04
Sec. 11.60.010. - Covered projects.¶
(a) Persons applying for a permit from the Town for new construction, building renovation, remodel, additions or alterations and demolition projects shall comply with the requirements of this section and all required components of the California Green Building Standards Code, 24 CCR, Part 11 (CALGreen), as amended, if its project is covered by the scope of CALGreen and other applicable requirements of the Town. If the requirements of CALGreen, as amended, are more stringent than the requirements of this section, the CALGreen requirements shall apply.
(b) All projects within the Town, including Town-sponsored projects, shall be subject to the Waste management plan requirement of Section 6.12.70.
(c) All new construction and demolition projects within the Town, including Town-sponsored projects, shall comply with this chapter and shall submit a waste management plan required by Section 11.60.050 prior to the beginning of any construction and demolition activities.
(1) Newly constructed buildings and demolition.
(2) Non-residential renovation, remodel, addition, or alterations to an existing structure within the Town, as determined by the building official.
(3) Residential renovation, remodel, addition, or alternations that increase the structure's conditioned area, volume, or size, as determined by the building official.
(Ord. No. 2356, § VI, 4-2-24)
Sec. 11.60.020. - Requirement to divert construction and demolition debris.¶
This section sets forth that all covered projects must comply with the following provisions of the most current California Green Building Standards Code (CALGreen) Sections:
(a) 4.408.1 Construction Waste Management Residential (recycling requirements)
(b) 5.408.1 Construction Waste Management Non-Residential (recycling requirements)
(c) 4.410.2 Recycling by Occupants Residential (recycling enclosure requirements)
(d) 5.410.1 Recycling by Occupants Non-Residential (recycling enclosure requirements)
It is required that at least sixty-five (65) percent of waste tonnage and one hundred (100) percent of excavated soil from new construction, demolition, or existing construction such as addition, alteration, or repair projects shall be diverted from disposal.
(Ord. No. 2356, § VI, 4-2-24)
Sec. 11.60.030. - Deconstruction, salvage and recovery.¶
(a) Contractors are encouraged to make every structure planned for demolition available for deconstruction, salvage, and recovery prior to demolition; and to recover the maximum feasible amount of salvageable designated recyclable and reusable materials prior to demolition.
(b) Recovered and salvaged designated recyclable and reusable materials from the deconstruction phase shall be counted towards the diversion requirements of this chapter.
(Ord. No. 2356, § VI, 4-2-24)
Sec. 11.60.040. - Approved construction and demolition debris processing facilities.¶
(a) The regional agency is authorized to designate and approve C&D debris processing facilities The regional agency shall issue an approval only if the owner or operator of the facility submits documentation satisfactory to the regional agency and shall obtain third party certification for mixed C&D debris processing.
(b) A mixed C&D processing facility is required to obtain third party certification prior to registration with the regional agency. The regional agency will apply the standards described in the then-current facility certification program, consistent with the procedures set forth in this chapter, to determine whether a facility qualifies for approval of registration. Any facility certified under a terminated certification program must reapply and receive certification under the then-current program.
(c) C&D debris processing facilities shall, as a condition of their approval, agree to terms and conditions set forth by the regional agency.
(Ord. No. 2356, § VI, 4-2-24)
Sec. 11.60.050. - Reporting.¶
(a) No later than thirty (30) days following the completion of a Covered project, the contractor shall, as a condition of final approval and for issuance of any certificate of occupancy, certify C&D debris was recycled at the diversion rate set by California's Green Building Standard Code and referenced in Section 6.120.010 and submit documentation to the building department that demonstrates compliance with the requirements of this chapter.
(b) The documentation shall be submitted in a form consistent with Town requirements and consist of receipts and weight tags or other records of measurement or equivalent documentation from recycling and processing companies, deconstruction contractors, and landfill and disposal companies.
(c) Progress reports during construction may be required.
(d) All documentation submitted pursuant to this section is subject to verification by Town.
(e) It is unlawful for any person to submit documentation to Town under this section that a person knows to contain any false statements, including but not limited to false statements regarding tonnage of materials recycled or diverted, or to submit any false or fraudulent receipt of weight tags or other record of measurement.
(Ord. No. 2356, § VI, 4-2-24)