Chapter IX

SEC. 91.9405. PRE-DESIGN INVESTIGATION.

Los Angeles Rent Rules (LAMC excerpts) · 2025 edition · ingested 2026-07-08 · Los Angeles

(Added by Ord. No. 171,258, Eff. 8/30/96.)

The engineer or architect shall prepare a pre-design field investigation report in accordance with Department guidelines and shall file the report when the plans are filed for permit. The plans shall include a description of the existing lateral force resisting system at and below the base.

GoCodebook provides limited public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.