SEC. 91.9305. COMPLIANCE REQUIREMENTS.
Los Angeles Building Code — LAMC Chapter IX · 2026-08 edition · updated 2026-09-09 · Los Angeles
91.9305.1. General. The owner of each building within the scope of this division shall cause a structural analysis to be made of the building by a civil or structural engineer or architect licensed by the state of California, and if the building does not meet the minimum earthquake standards specified in this division, the owner shall
cause the building to be structurally altered to conform to such standards or, at the owner's option, cause it to be demolished within the time limits stated in Section 91.9305.2.
91.9305.2. Time Limits for Compliance. (Amended by Ord. No. 184,081, Eff. 2/19/16.) The owner of a building within the scope of this division shall comply with its requirements within the following time limits:
- Within two (2) years after service of the order described in Section 91.9306, submit to the Department for review and approval:
- a. A structural analysis and plans which shall demonstrate the building, as is, meets or exceeds the requirements set forth in Section 91.9309; or
b. A structural analysis and plans which shall demonstrate that the proposed structural alteration of the building meets or exceeds the requirements set forth in Section 91.9309; or
- c. Plans for the demolition of the building.
Within three and a half (3.5) years after service of the order, obtain all necessary permits for rehabilitation or demolition.
Within seven (7) years after service of the order, complete construction or demolition work under all necessary permits.
Time limits for compliance shall be based on the service date of the original order from the Department. Transfer of title shall not change compliance dates.
Get a plain-English answer with a citation back to this text.
Ask AI about this code▸Contents — Los Angeles Building Code — LAMC Chapter IX
- Chapter IX
- Chapter IX — BUILDING REGULATIONS
- Division 1
- Division 2
- Division 3
- Division 4
- Division 5
- Division 6
- Division 7
- Division 8
- Division 9
- Division 10
- Division 11
- Division 12
- Division 13
- Division 14
- Division 15
- Division 16
- Division 17
- Division 18
- Division 19
- Division 20
- Division 21
- Division 22
- Division 23
- Division 24
- Division 25
- Division 26
- Division 27
- Division 28
- Division 29
- Division 30
- Division 31
- Division 32
- Division 33
- Division 34
- Division 35
- Division 61
- Division 62
- Division 63
- Division 67
- Division 70
- Division 71
- Division 72
- Division 82
- Division 83
- Division 85
- Division 88
- Division 89
- Division 90
- Division 91
- Division 92
▸Division 93
Overview- SEC. 91.9301. PURPOSE.
- SEC. 91.9302. SCOPE.
- SEC. 91.9304. PRIORITY DESIGNATIONS.
- SEC. 91.9305. COMPLIANCE REQUIREMENTS.
- SEC. 91.9306. ADMINISTRATION.
- SEC. 91.9308. HISTORICAL BULDINGS.
- SEC. 91.9309. ENGINEERING ANALYSIS.
- SEC. 91.9310. INFORMATION REQUIRED ON PLANS.
- SEC. 91.9311. VIOLATION / PENALTY.
- SEC. 91.9312. SEVERABILITY.
- Division 94
- Division 95
- Division 96
- Division 5 — REGISTRATION
- Division 16A
- Division 17
- Division 18
- Division 19
- Division 20
- Division 21
- Division 17
- Division 18
- Division C
- Division D