13.14.210 - Purpose.

The city council has adopted a stormwater conveyance extension policy that is fair and equitable to all developing properties and that provides that the cost of extension shall be distributed among subsequently developing properties connecting thereto.

(Ord. No. 1905, § 1, 6-3-2015)

Exceptions & meaning →

13.14.220 - Application.

Whenever a property owner requires storm drainage, an application shall be made to the public works department. The public works director shall determine the closest stormwater conveyance and, if an extension is necessary, indicate the size of the main to be extended and the limits of the extension.

(Ord. No. 1905, § 1, 6-3-2015)

Exceptions & meaning →

13.14.230 - Applicant's obligation.

Whenever the public works director determines that a stormwater conveyance extension is necessary, the applicant will be required to install, at the applicant's own expense, the stormwater conveyance extension in accordance with the engineering plans furnished by applicant and approved by the public works director. The plans shall be prepared in accordance with the city design standards.

(Ord. No. 1905, § 1, 6-3-2015)

Exceptions & meaning →

13.14.240 - Extension for full frontage width.

In every case where a storm drain is to be tapped to serve a parcel, the same shall be extended the full frontage of the parcel unless the public works director determines that the storm drain will not need to be extended to serve any other properties.

(Ord. No. 1905, § 1, 6-3-2015)

Exceptions & meaning →

13.14.250 - Minimum diameter.

The minimum size storm drain shall have a nominal inside diameter of twelve inches. Larger size mains may be required as determined by the public works director in accordance with the city public improvement design standards to the city master storm drain plans.

(Ord. No. 1905, § 1, 6-3-2015)

Exceptions & meaning →

13.14.260 - Reimbursement—Oversize mains.

Whenever the city requires that a storm drain larger than eighteen inches in diameter be installed in order to serve additional property or to conform to the applicable master plan, the applicant may apply for a reimbursement agreement to the city in order to be reimbursed for the oversized pipe by the benefitting property(s). The reimbursement shall be based on the difference in cost between the actual pipe to be installed and an eighteen-inch storm drain as applicable. The difference in cost shall be determined by the public works director. The reimbursement shall be made in accordance with Chapter 17.62.

(Ord. No. 1905, § 1, 6-3-2015)

Exceptions & meaning →

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — Lodi Municipal Code

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.