§ 18.08.060. Land development work—Permit required.

§ 18.08.070. Designated exceptions.

§ 18.08.080. Permit applications.

§ 18.08.090. Additional information.

§ 18.08.100. Grading plan requirements.

§ 18.08.110. Plot plans.

§ 18.08.120. Preliminary soil engineering and geology reports.

§ 18.08.130. Landscape and irrigation plans.

§ 18.08.140. Minimum BMPs for land disturbance activities.

§ 18.08.150. Erosion prevention.

§ 18.08.160. Erosion control plan requirements.

§ 18.08.170. Erosion control required.

§ 18.08.180. BMP maintenance.

§ 18.08.190. Grading and grading for building construction.

§ 18.08.200. Early subdivision grading.

§ 18.08.210. Environmental review.

§ 18.08.220. Right of entry—Indemnification of city.

§ 18.08.230. Restriction on permit issuance—Excessive grades.

§ 18.08.240. Nonstructural fills.

§ 18.08.250. Drainage easement required.

§ 18.08.260. Permit applications—Expiration and extension.

§ 18.08.270. Issuance of permits.

§ 18.08.280. Denial of permits.

§ 18.08.290. Appeals.

§ 18.08.300. Permit expiration, extension and cancellation.

§ 18.08.310. Revocation of permits.

§ 18.08.320. Fee schedule—Generally.

§ 18.08.330. Plan check and permit fees.

§ 18.08.340. Preliminary soils engineering report review fee.

§ 18.08.350. Inspection deposit.

§ 18.08.360. Work commenced before permit issuance—Fee.

§ 18.08.370. Fee exemptions.

§ 18.08.380. Refunds.

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — Lemon Grove Municipal Code

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.