Title 12 — STREETS, SIDEWALKS AND PUBLIC PLACES›Chapter 12.04 — PROTECTION OF HIGHWAYS
Article III — Excavations, Fills and Obstructions
Lemon Grove Municipal Code · 2026-07 edition · updated 2026-10-02 · Lemon Grove
§ 12.04.250. Scope of regulations.¶
§ 12.04.255. Permit—Required.¶
§ 12.04.260. Permit—Application.¶
§ 12.04.265. Permit—Fee.¶
§ 12.04.270. Permits nontransferable.¶
§ 12.04.275. Permits subject to use of highways by others.¶
§ 12.04.280. Applicant responsible for removing obstructions.¶
§ 12.04.285. Proof of right to use highways.¶
§ 12.04.290. Location changes required by surveyor.¶
§ 12.04.295. Commencement of work—Cancellation of permits.¶
§ 12.04.300. Permit not required of certain parties—Report—Fees—Filing of maps, plats,¶
§ 12.04.305. Poles and overhead lines—Exemption from permit requirements.¶
§ 12.04.310. Emergency excavations.¶
§ 12.04.315. Special deposit—Exemptions.¶
§ 12.04.320. General deposit in lieu of special deposit.¶
§ 12.04.325. Additional deposit.¶
§ 12.04.330. Deductions from deposit.¶
§ 12.04.335. Refund or deficiency payment.¶
§ 12.04.340. Billing in lieu of deductions.¶
§ 12.04.345. Work must conform to permit.¶
§ 12.04.350. Protective measures required.¶
§ 12.04.355. Warning lights—Requirements.¶
§ 12.04.360. Refilling excavations required.¶
§ 12.04.365. Restoration of highway.¶
§ 12.04.370. Restoration by surveyor.¶
§ 12.04.375. Notification of completed refilling.¶
§ 12.04.380. Resurfacing highway.¶
§ 12.04.385. Charge for resurfacing.¶
§ 12.04.390. Charge for subsequent repairs.¶
§ 12.04.395. Scope of regulations.¶
§ 12.04.400. Permit—Required.¶
§ 12.04.405. Permit—Residential driveways.¶
§ 12.04.410. Permit—Application.¶
§ 12.04.415. Plans required with application.¶
§ 12.04.420. Applicant for concrete work.¶
§ 12.04.425. Work to be full length of street.¶
§ 12.04.430. Permit fee.¶
§ 12.04.435. Engineering and/or inspection fee.¶
§ 12.04.440. Refund or deficiency payment.¶
§ 12.04.445. Relocation costs.¶
§ 12.04.450. Deposit for resetting stakes.¶
§ 12.04.455. Refund upon revocation.¶
§ 12.04.460. Work to commence in sixty days.¶
§ 12.04.465. Revocation for delay.¶
§ 12.04.470. Work must conform to permit.¶
§ 12.04.475. Lines and grades obtained from surveyor.¶
§ 12.04.480. Performance according to plans and specifications—Inspection.¶
§ 12.04.485. Subsequent change in plans and specifications.¶
§ 12.04.490. Request for inspector before work begins.¶
§ 12.04.495. Approval of concrete forms.¶
§ 12.04.500. Warning lights.¶
§ 12.04.505. Removal of debris.¶
§ 12.04.510. Completion of work—Notification.¶
§ 12.04.515. Completion of work—Certificate of acceptance.¶
§ 12.04.520. Permittee's responsibility.¶
§ 12.04.525. Defective work and materials.¶
§ 12.04.530. Default of permittee.¶
§ 12.04.535. Public nuisance.¶