Sec. 30-43. - Administration.

43.1

It shall be the duty of the Administrative Official (or appointed designee) to enforce all the provisions of this Chapter relative to grading activities regulated by this Chapter in the unincorporated areas of the County.

(Ord. No. 2830, § 1, 7-17-2007)

Exceptions & meaning →

Sec. 30-44. - Penalty.

44.1

Any grading performed in violation of this Chapter shall be unlawful and deemed a public nuisance.

44.2

Notwithstanding these regulations, no person shall cause or allow a significant environmental impact to occur as a result of new or continued grading as defined herein, including grading that is exempt from these regulations. In the event that the Administrative Official determines that a significant environmental impact is likely to occur or has occurred as a result of grading activities, the Administrative Official may deny or revoke any grading permit.

44.3

If necessary, the Administrative Official may also require a grading permit for work that is otherwise exempt from these regulations in order to address the identified significant impact.

44.4

It is the intent of this Chapter that the conduct of grading exempted or waived from the requirement to obtain a permit shall incorporate practices consistent with the standards incorporated in this Chapter.

44.5

A violation of any of the provisions of this Chapter, or of any codes adopted by reference in this Chapter, is punishable as an infraction or a misdemeanor. Violations prosecuted as an infraction shall be punishable by fines as specified in Government Code Section 25132. Violations prosecuted as misdemeanors shall be punishable, by imprisonment in the County jail for a term not exceeding six (6) months, or by a fine of one thousand dollars ($1,000.00), or both such fine and imprisonment, as well as all administrative costs associated with such prosecution.

(Ord. No. 2830, § 1, 7-17-2007)

Exceptions & meaning →

Sec. 30-45. - Arrest and citation powers.

45.1

The following officers and employees of the Lake County Community Development Department are hereby given arrest and citation powers pursuant to Section 836.5 of the Penal Code:

a) Community Development Director

b) Chief Building Official

c) Building Inspector

d) Assistant/Associate Resource Planner

e) Senior Resource Planner

f) Code Compliance Manager

g) Code Compliance Officer

(Ord. No. 2830, § 1, 7-17-2007)

Exceptions & meaning →

Sec. 30-46. - Stop work orders.

46.1

The Administrative Official may order that any grading operations performed in violation of the requirements of this Chapter, the approved plans and specifications, any permit conditions, or any grading operations that have otherwise become hazardous to the property of others or the public welfare be stopped.

46.2

It shall be unlawful and a violation of this code for any person to resume grading operations that were ordered to be stopped, unless the Administrative Official has first required, and the violator has agreed to, any necessary corrective measures, and the Administrative Official has authorized the resumption of work.

(Ord. No. 2830, § 1, 7-17-2007)

Exceptions & meaning →

Sec. 30-47. - Corrective action.

47.1

Whenever the Administrative Official finds that a grading operation has become, or is threatening to become, hazardous to the property of others, the public welfare or the environment, or that violates or will violate the provisions of this Chapter, the Administrative Official may require that the operator submit for approval, a detailed schedule of specific remedies that can be undertaken immediately to bring the work into compliance with this Chapter.

47.2

Within twenty-four (24) hours after acceptance of said remedies by the Administrative Official, the operator/property owner shall at his/her expense undertake the required immediate remedial action as necessary to eliminate the emergency hazard prior to, or concurrent with, any necessary permit application for any further work regulated by this Chapter.

(Ord. No. 2830, § 1, 7-17-2007)

Exceptions & meaning →

Sec. 30-48. - Notice of violation.

48.1

A Notice of Violation shall specify the violation and the corrective action required to abate the violation.

48.2

The Notice of Violation shall also state that failure to abate the violation could subject the responsible party (ies) to administrative and criminal penalties and could result in the imposition of a lien on the property.

48.3

Notice shall be given as specified in Section 13.33.2 of the Lake County Ordinance Code.

(Ord. No. 2830, § 1, 7-17-2007)

Exceptions & meaning →

Sec. 30-49. - Nuisance and hazard abatement.

49.1

Any work done or maintained in violation of the provisions of this Chapter and any use of land operated or maintained in violation of the provisions of this Chapter are hereby declared to be public nuisances and full abatement and restoration may be required and an assessment of cost may be levied pursuant to Chapter 13 of the Lake County Ordinance Code.

(Ord. No. 2830, § 1, 7-17-2007)

Exceptions & meaning →

Sec. 30-50. - Summary abatement.

50.1

Upon discovery of a violation of the provisions of the Chapter, or upon the failure to comply with a Stop Work Order issued by the Administrative Official, the Administrative Official may give the property owner, and any person conducting grading operations in violation of this Chapter, notice of a Summary Grading Nuisance Abatement Order. The notice shall include:

a) a proposed administrative order detailing those actions or cessation of actions required to abate the nuisance

b) a reasonable time period for compliance

c) a reasonable opportunity for all interested parties to appear and be heard regarding the order's provisions.

50.2

If the property owner or any person conducting grading operations in violation of this Chapter fails to comply in a timely manner with the Order, the County of Lake shall commence a summary abatement proceeding in the court of competent jurisdiction with the County of Lake.

50.3

If the County prevails in such summary abatement proceeding, the Court shall, in addition to declaratory and injunctive judicial relief, award the County, as prevailing party, all costs of abatement, including the County's reasonable administrative, legal and enforcement costs. Recovery of abatement costs pursuant to this Section shall be in addition to, and shall not limit, any prevailing party's right to recover costs pursuant to Section 1032 and 1033.5 of the Code of Civil Procedure, or any other provision of law.

(Ord. No. 2830, § 1, 7-17-2007)

Exceptions & meaning →

Sec. 30-51. - Revocation or modification by count.

51.1

A grading permit may be revoked or modified for cause as provided for in this Section.

51.2

For purposes of this Section modification may include the waiver or imposition of new conditions.

51.3

Action to revoke or modify a grading permit may be taken by the Administrative Official, Planning Commission, or Board of Supervisors and shall be based on a determination of one (1) or more of the following grounds:

a) That such permit was obtained or extended by fraud or was issued in error.

b) That one (1) or more of the permit conditions have been violated.

c) That the use for which the permit was granted is being conducted so as to be detrimental to the public health, welfare or safety, or so as to be a nuisance.

51.4

A permit final may be revoked and repairs required to be made within three (3) years from the date of the final if the work is deemed to have been done in violation of this Chapter.

(Ord. No. 2830, § 1, 7-17-2007)

Exceptions & meaning →

Sec. 30-52. - Severability.

52.1

The provisions of this Chapter are hereby declared to be severable. If any provision, clause, sentence, or paragraph of this Chapter is for any reason held to be invalid such decision shall not affect the validity of the remaining provisions, clauses, sentences or paragraphs of this Chapter.

(Ord. No. 2830, § 1, 7-17-2007)

LAKE COUNTY GRADING ORDINANCE — APPENDIX A

EROSION HAZARD RATING

Soil Map Unit Erosion Hazard Rating
101 Aiken-Sobrante association, 5 to 15% slopes moderate
102 Aiken-Sobrante association 15 to 30% slopes moderate
103 Asbil clay loam, 5 to 8% slopes moderate
104 Asbil clay loam, 8 to 15% slopes moderate
105 Badland severe
106 Bally Phipps gravelly loams, 2 to 8% slopes slight
107 Bally-Phipps complex, 15 to 30% slopes severe
108 Bally-Phipps Haploxeralfs association, 30 to 75% slopes severe
109 Bamtush-Neuns gravelly loams, 15 to 30% slopes moderate
110 Bamtush-Speaker-Sanhedrin gravelly loams, 30 to 50% slopes severe
111 Bamtush-Speaker-Sanhedrin gravelly loams, 50 to 75% slopes severe
112 Benridge-Konocti association, 15 to 30% slopes severe
113 Benridge-Konocti association, 30 to 50% slopes severe
114 Benridge-Sodabay loams, 8 to 15% slopes moderate
115 Benridge-Sodabay loams, 15 to 30% slopes severe
116 Benridge Variant loam, 2 to 15% slopes moderate
117 Bottlerock-Glenview-Arrowhead complex, 5 to 30% slopes moderate
118 Bottlerock-Glenview-Arrowhead complex, 30 to 50% slopes severe
119 Bressa Millsholm loams, 8 to 15% slopes moderate
120 Bressa Millsholm loams, 15 to 30% slopes severe
121 Clear Lake clay, drained, cool slight
122 Clear Lake Variant clay, drained slight
123 Cole clay loam, drained slight
124 Cole Variant clay loam slight
125 Cole Variant clay loam, calcareous substratum slight
126 Collayomi complex, 50 to 75% slopes severe
127 Collayomi-Aiken-Whispering complex, 5 to 30% slopes moderate
128 Collayomi-Aiken-Whispering complex 30 to 50% slopes severe
129 Collayomi-Whispering complex, 30 to 50% slopes severe
130 Deadwood-Sheetiron association, 50 to 75% slopes severe
131 Fluventic Haplaquolls, nearly level slight
132 Forbesville loam, 2 to 5% slopes slight
133 Forbesville loam, 5 to 15% slopes moderate
134 Forward Variant-Kidd association, 30 to 50% slopes severe
135 Forward Variant-Kidd association, 50 to 75% slopes severe
136 Freezeout-Yollabolly very gravelly sandy loams, 30 to 50% slopes moderate
137 Freezeout-Yollabolly very gravelly sandy loams, 50 to 75% slopes severe
138 Glenview-Arrowhead complex, 5 to 15% slopes moderate
139 Glenview-Arrowhead complex, 15 to 30% slopes severe
140 Glenview-Bottlerock complex, 2 to 5% slopes slight
141 Henneke-Montara complex, 8 to 15% slopes moderate
142 Henneke-Montara-Rock outcrop complex, 15 to 30% slopes severe *
143 Henneke-Okiota complex, 30 to 50% severe *
144 Jafa loam, 2 to 5% slopes slight
145 Jafa loam, 2 to 5% slopes moderate
146 Jafa complex, 5 to 30% slopes severe
147 Kelsey fine sandy loam slight
148 Kidd-Forward complex, 5 to 30% slopes moderate
149 Kidd-Forward complex, 30 to 50% slopes severe
150 Kilaga Variant loam, 0 to 5% slopes slight
151 Konocti-Benridge complex, 50 to 75% slopes severe
152 Konocti-Hambright complex, 5 to 15% slopes moderate
153 Konocti-Hambright complex, 15 to 30% slopes severe
154 Konocti-Hambright-Rock outcrop complex, 30 to 75% slopes severe
155 Konocti Variant-Konocti-Hambright complex, 2 to 15% slopes moderate
156 Konocti Variant-Konocti-Hambright complex, 15 to 30% slopes moderate
157 Landlow Variant silty clay loam slight
158 Lupoyoma silt loam, protected slight
159 Manzanita loam, 2 to 5% slopes slight
160 Manzanita loam, 5 to 15% slopes moderate
161 Manzanita loam, 15 to 25% slopes severe
162 Manzanita gravelly loam, 2 to 8% slopes moderate
163 Manzanita gravelly loam, 8 to 25% slopes severe
164 Maxwell clay loam, 0 to 2% slopes slight *
165 Maxwell clay loam, 2 to 8% slopes moderate *
166 Maymen-Etsel-Mayacama complex, 15 to 30% slopes moderate
167 Maymen-Etsel-Mayacama complex, 30 to 75% slopes severe
168 Maymen-Etsel-Snook complex, 15 to 30% slopes moderate
169 Maymen-Etsel-Snook complex, 30 to 75% slopes severe
170 Maymen-Etsel-Speaker association, 30 to 50% slopes severe
171 Maymen-Hopland-Etsel association, 15 to 50% slopes severe
172 Maymen-Hopland-Mayacama complex, 9 to 30% slopes moderate
173 Maymen-Hopland-Mayacama association, 30 to 50% slopes severe
174 Maymen-Hopland-Mayacama association, 50 to 75% slopes severe
175 Maymen-Millsholm-Bressa complex, 30 to 50% slopes severe
176 Maywood variant sandy loam slight
177 Millsholm-Bressa loams, 30 to 50% slopes severe
178 Millsholm-Bressa-Hopland association, 30 to 50% slopes severe
179 Millsholm-Squawrock-Pomo complex, 30 to 50% slopes severe
180 Mocho Variant loam slight
181 Neice-Sobrante-Hambright complex, 30 to 75% slopes severe
182 Neice-Sobrante-Hambright complex, 30 to 75% slopes severe
183 Neuns-Bamtush-Deadwood association, 30 to 50% slopes severe
184 Neuns-Deadwood-Bamtush association, 50 to 75% slopes severe
185 Neuns-Decy-Sanhedrin complex, 30 to 50% slopes severe
186 Neuns-Sanhedrin-Deadwood complex, 30 to 50% slopes severe
187 Neuns-Sanhedrin-Deadwood complex, 50 to 75% slopes severe
188 Neuns-Sanhedrin-Speaker gravelly loams, 30 to 50% slopes severe
189 Neuns-Sheetiron-Deadwood complex, 30 to 50% slopes severe
190 Neuns-Sheetiron-Deadwood complex, 50 to 75% slopes severe
191 Neuns-Speaker gravelly loams, 15 to 30% slopes moderate
192 Okiota-Henneke complex, 5 to 30% slopes moderate *
193 Okiota-Henneke-Dubakella association, 15 to 50% slopes severe *
194 Oxalis Variant silt loam slight
195 Phipps complex, 5 to 15% slopes moderate
196 Phipps complex, 15 to 30% slopes severe
197 Phipps complex, 30 to 50% slopes severe
198 Pomo-Bressa loams, 15 to 50% slopes severe
199 Riverwash varies according to water velocities
200 Rock outcrop-Etsel-Snook complex, 50 to 80% slopes severe
201 Sanhedrin-Kekawaka-Speaker complex, 15 to 30% slopes severe
202 Sanhedrin-Kekawaka-Speaker complex, 30 to 50% slopes severe
203 San Joaquin Variant fine sandy loam, 0 to 5% slopes slight
204 Sheetiron-Deadwood association, 30 to 50% slopes severe
205 Sheetiron-Deadwood association, 50 to 75% slopes severe
206 Shortyork Variant-Yorkville-Squawrock association, 15 to 50% slopes severe *
207 Skyhigh-Asbil complex, 8 to 15% slopes moderate
208 Skyhigh-Asbil complex, 15 to 50% slopes severe
209 Skyhigh-Millsholm loams, 15 to 50% slopes severe
210 Skyhigh-Sleeper-Millsholm association, 8 to 15% slopes moderate
211 Skyhigh-Sleeper-Millsholm association, 15 to 30% slopes severe
212 Skyhigh-Sleeper-Millsholm association, 30 to 50% slopes severe
213 Sleeper Variant-Sleeper loams, 5 to 15% slopes moderate
214 Sleeper Variant-Sleeper loams, 15 to 30% slopes severe
215 Sleeper Variant-Sleeper loams, 30 to 50% slopes severe
216 Sobrante-Collayomi-Whispering association, 15 to 30% slopes severe
217 Sobrante-Collayomi-Whispering association, 30 to 50% slopes severe
218 Sobrante-Guenoc-Hambright complex, 2 to 15% slopes moderate
219 Sobrante-Guenoc-Hambright complex, 15 to 30% slopes moderate
220 Sobrante-Hambright-Guenoc complex, 30 to 50% slopes severe
221 Sodabay loam, 5 to 15% slopes moderate
222 Sodabay loam, 15 to 30% slopes severe
223 Sodabay-Konocti association, 5 to 30% slopes severe
224 Speaker-Marpa-Sanhedrin gravelly loams, 30 to 50% slopes severe
225 Speaker-Maymen-Marpa association, 30 to 50% slopes severe
226 Speaker-Maymen-Marpa association, 50 to 75% slopes severe
227 Speaker-Maymen-Millsholm association, 30 to 50% slopes severe
228 Speaker-Sanhedrin gravelly loams, 50 to 75% slopes severe
229 Speaker-Sanhedrin-Maymen association, 30 to 50% slopes severe
230 Speaker-Speaker Variant-Sanhedrin association, 5 to 30% slopes moderate
231 Squawrock-Shortyork Variant gravelly loams, 15 to 30% slopes moderate
232 Still loam slight
233 Still loam, stratified substratum Slight
234 Still gravelly loam slight
235 Still-Talmage complex, 2 to 8% slopes moderate
236 Stonyford-Guenoc complex, 30 to 50% slopes severe
237 Talmage very gravelly sandy loam slight
238 Tulelake silty clay loam, flooded slight
239 Tulelake silty clay loam, protected slight
240 Tyson-Neuns gravelly loams, 30 to 75% slopes severe
241 Vitrandepts-Cinder land complex, 15 to 75% slopes
242 Wappo loam, 2 to 8% slopes moderate
243 Wappo loam, 8 to 15% slopes moderate
244 Wappo variant clay loam, 2 to 8% slopes moderate
245 Whispering-Collayomi complex, 50 to 75% slopes severe
246 Wolfcreek gravelly loam slight
247 Wolfcreek loam slight
248 Xerofluvents, very gravelly slight
249 Xerofluvents-Riverwash complex slight
250 Yollabolly-Freezeout very gravelly sandy loams, 30 to 50% slopes moderate
251 Yollabolly Rock outcrop-Freezeout complex, 50 to 75% slopes severe
252 Yorktree-Hopland-Squawrock complex, 15 to 50% slopes severe
253 Yorkville-Pomo complex, 15 to 50% slopes severe
254 Yorkville-Yorktree-Squawrock association, 15 to 50% slopes severe
255 Yorkville Variant clay loam, 2 to 8% slopes moderate *

* Denotes most common serpentine soil units subject to asbestos hazard mitigation dust control requirements.

(Ord. No. 2830, § 1, 7-17-2007)

Exceptions & meaning →

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — Lake County Municipal Code

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.