Skip to content

Title 8 — BUILDING REGULATIONS›Division 4 — SANITARY SEWER COLLECTION SYSTEMS

Article 12 — EARTHWORK

Laguna Niguel Municipal Code · 2026-09 edition · updated 2026-10-02 · Laguna Niguel

Sec. 8-4-243. - General standards.

Sec. 8-4-244. - Clearing and grubbing.

Sec. 8-4-245. - Excavation.

Sec. 8-4-246. - Maximum length of trench.

Sec. 8-4-247. - Trench width.

Sec. 8-4-253. - Bracing.

Sec. 8-4-254. - Correction of faulty grades.

Sec. 8-4-255. - Grading and stockpiling.

Sec. 8-4-256. - Dewatering.

Sec. 8-4-257. - Granular soil.

Sec. 8-4-263. - Trench bottom for sewer pipe.

Sec. 8-4-264. - Foundations in rock.

Sec. 8-4-265. - Foundations in unsuitable material.

Sec. 8-4-266. - Foundation in suitable soil.

Sec. 8-4-267. - Trench backfill.

Sec. 8-4-273. - Pipe bedding.

Sec. 8-4-274. - Procedure at pipe zone.

Sec. 8-4-275. - Backfill above pipe zone.

Sec. 8-4-276. - Compaction in open fields.

Sec. 8-4-277. - Backfill at street zone.

Sec. 8-4-283. - Compaction method.

Sec. 8-4-284. - Consolidation.

Sec. 8-4-285. - Testing of compaction.

Sec. 8-4-286. - Removal of excess excavated material.

Sec. 8-4-287. - Use of imported backfill material.

Sec. 8-4-293. - Structure excavation.

Sec. 8-4-294. - Structure backfill.

Sec. 8-4-295. - Backfill material.

Sec. 8-4-296. - Compaction of backfill.

Sec. 8-4-297. - Final cleanup.

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — Laguna Niguel Municipal Code

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.