Skip to content

Title 10 — BUILDINGS AND CONSTRUCTION›Chapter 10-16 — GRADING AND EXCAVATION CODE

Article V — Grading Permit Requirements

Laguna Hills Municipal Code · 2026-07 edition · updated 2026-10-02 · Laguna Hills

§ 10-16.160. Permits required.

§ 10-16.170. Application.

§ 10-16.180. Plans and specifications.

§ 10-16.190. Information on plans and specifications.

§ 10-16.200. Soil engineering and engineering geology reports.

§ 10-16.210. Issuance, expiration, and renewal.

§ 10-16.220. Denial of permit.

§ 10-16.230. Time of grading operations.

§ 10-16.240. Responsibility of permittee.

§ 10-16.250. Protection of adjoining property.

§ 10-16.260. Import and export of earth material.

§ 10-16.270. Grading plan check fees.

§ 10-16.280. Grading permit fees.

§ 10-16.290. Cost recovery fees.

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — Laguna Hills Municipal Code

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.