Title 10 — BUILDINGS AND CONSTRUCTION›Chapter 10-16 — GRADING AND EXCAVATION CODE
Article V — Grading Permit Requirements
Laguna Hills Municipal Code · 2026-07 edition · updated 2026-10-02 · Laguna Hills
§ 10-16.160. Permits required.¶
§ 10-16.170. Application.¶
§ 10-16.180. Plans and specifications.¶
§ 10-16.190. Information on plans and specifications.¶
§ 10-16.200. Soil engineering and engineering geology reports.¶
§ 10-16.210. Issuance, expiration, and renewal.¶
§ 10-16.220. Denial of permit.¶
§ 10-16.230. Time of grading operations.¶
§ 10-16.240. Responsibility of permittee.¶
§ 10-16.250. Protection of adjoining property.¶
§ 10-16.260. Import and export of earth material.¶
§ 10-16.270. Grading plan check fees.¶
§ 10-16.280. Grading permit fees.¶
§ 10-16.290. Cost recovery fees.¶
Get a plain-English answer with a citation back to this text.
Ask AI about this code