Earlier editions: 2026-09
La Puente Municipal Code Title 8 Building Regulations
La Puente Municipal Code · 2026-10 edition · updated 2026-10-04 · La Puente
Sections in this part
- Chapter 8.03 — BUILDING CONSTRUCTION FEES AND CHARGES
- Chapter 8.05 — BUILDING CODE
- Chapter 8.09 — PLUMBING CODE
- Chapter 8.13 — ELECTRICAL CODE
- Chapter 8.16 — SWIMMING POOL FENCES
- Chapter 8.17 — MECHANICAL CODE
- Chapter 8.20 — REIMBURSEMENT FEES FROM LOS ANGELES COUNTY
- Chapter 8.24 — CURBS, GUTTERS AND SIDEWALKS
- Chapter 8.36 — EXCAVATIONS
- Chapter 8.40 — UNDERGROUND UTILITIES
- Chapter 8.44 — RESIDENTIAL CODE
- Chapter 8.48 — GREEN BUILDING STANDARDS CODE
- Chapter 8.50 — EXPEDITED PERMIT PROCESS FOR ELECTRIC VEHICLE CHARGING SYSTEMS
- Chapter 8.52 — EXISTING BUILDING CODE
Cite as: La Puente Municipal Code Title 8 · Text as of 2026-10-04
Chapters:
8.03 Building Construction Fees and Charges
8.05 Building Code
8.09 Plumbing Code
8.13 Electrical Code
8.16 Swimming Pool Fences
8.17 Mechanical Code
8.20 Reimbursement Fees from Los Angeles County
8.24 Curbs, Gutters and Sidewalks
8.36 Excavations
8.40 Underground Utilities
8.44 Residential Code
8.48 Green Building Standards Code
8.50 Expedited Permit Process for Electric Vehicle Charging Systems
8.52 Existing Building Code
Get a plain-English answer with a citation back to this text.
Ask AI about this code