90902.00 - Applicability.¶
Every application for a building permit of any type, or any request for service shall be assessed a filing/processing fee, as provided herein below. The planning and development services department shall not accept, receive or issue a permit or provide any related service unless the requisite fee is received. The department, nor any commission nor any advisory board shall not waive any fee.
(Amended during 2008 codification; Ord. 1386 (part), 2004: Ord. 1355 § 2 (part), 2002)
90902.01 - State Strong Motion Instrumentation (SMI).¶
The department shall collect and distribute fees for the State Strong Motion Instrumentation (SMI) Program and/or any other state mandated fee as provided by the law(s) so enacted. The department shall not be required to first obtain direction from the board of supervisors when a new state or federal law directs or re-directs this procedure.
(Ord. 1386 (part), 2004: Ord. 1355 § 2 (part), 2002)
90902.02 - Construction permits.¶
A. Except as otherwise set forth in this division, fees for each permit issued by the building official pursuant to this division shall be paid upon application(s) for such permit. The fees are those schedule of fees as delineated within this title.
B. Where work for which a permit is required by this division, (other than emergency work as defined in Section 91002.09), is commenced prior to obtaining such permit, all fees required hereby or applicable to the permit shall be doubled, but the payment of such double fee shall not relieve any person from compliance with the requirements hereof or from the penalties prescribed herein.
C. All fees collected by the building inspection division shall be turned over to the county treasurer and shall be deposited in the general fund of Imperial County, and/or such special trust funds as established.
D. Building Fees.
The building fees are based on a Nexus Methodology Study (see attached New Construction Fee Table) conducted in November 2004 and adopted by the board of supervisors. The building official shall not negotiate fees, nor shall he or she allow the use of individual contract costs.
The fees specified in the Nexus Methodology Study (incorporated herein as the "Schedule of New Construction Fees") shall be implemented as follows:
a. Sixty percent (60%) of the rates established under the Schedule of New Construction Fees shall commence on March 31, 2005.
b. Eighty percent (80%) of the rates established under the Schedule of New Construction Fees shall commence on September 30, 2005.
c. One hundred percent (100%) of the rates established under the Schedule of New Construction Fees shall commence on March 31, 2006.
E. The following entities requiring permits under this chapter shall be exempt from payment of "some" fees, (Reference Gov. Code 6103.7) but shall not be exempt from compliance with the provisions of this division. The word "some" means other than actual building division costs that the county may incur for plan checking, inspecting and special expertise consultation.
County of Imperial;
Incorporated cities;
State/federal government agencies.
No other agency or organization shall be exempt from fees.
F. The Imperial irrigation district (I.I.D.) shall be required to obtain permits and pay fees for the construction of any structure for human occupancy; any new power plant; warehouse or storage facility. Permits shall not be required for structures used exclusively for power/water distribution (i.e., for structures having none or limited human occupancy including but not limited to remote controlled power plants, substations etc.).
G. "Special district(s)" means a service district providing a public service for a given area, such as fire protection, water and/or sewer distribution, etc. and whose governing body is duly-elected by the district constituents.
H. "School district(s)" means all facilities, structures, buildings, not used for instruction of students, classrooms, auditoriums and, under direct control of the Office of the State Architect, shall be subject to all provisions of this division. Such facilities shall include, but not be limited to, administration facilities, bus repair shops, garages, etc.
(Ord. 1386 (part), 2004: Ord. 1355 § 2 (part), 2002)
(NOTE: All fees include MFE plan checks.)
| CONSTRUCTION TYPE and RATIO OF REQUIRED EFFORT | |||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Group A: V-A/ |
Group A: V-A/ |
Group B: III-A/ |
Group B: III-A/ |
Group C: IV | Group C: IV | Group D: II-A/ |
Group D: II-A/ |
Group E: I-A/ |
Group E: I-A/ |
||||
| Relative Effort | Relative Effort | Relative Effort | Relative Effort | Relative Effort | Relative Effort | Relative Effort | Relative Effort | Relative Effort | Relative Effort | ||||
| 1.00 | 1.00 | LH | LH | 1.30 | 1.30 | 1.36 | 1.36 | 1.46 | 1.46 | ||||
| ICC (UBC) Use Type | Occupancy | Size Basis (square feet) | Base Recommended Fee | Base Cost | Each Additional SF | Base Cost | Each Additional SF | Base Cost | Each Additional SF | Base Cost | Each Additional SF | Base Cost | Each Additional SF |
| A-1 | Motion Picture, Audience Theatre - Complete | 500 | $2,257 | $2,257 | $1.24577 | $2,373 | $1.42018 | $2,934 | $1.61950 | $3,069 | $1.69425 | $3,293 | $1.81883 |
| A-1 | Motion Picture, Audience Theatre - Complete | 1,500 | $3,502 | $3,502 | $0.68703 | $3,993 | $0.78322 | $4,553 | $0.89314 | $4,763 | $0.93437 | $5,113 | $1.00307 |
| A-1 | Motion Picture, Audience Theatre - Complete | 5,000 | $5,907 | $5,907 | $0.49915 | $6,734 | $0.56903 | $7,679 | $0.64890 | $8,033 | $0.67884 | $8,624 | $0.72876 |
| A-1 | Motion Picture, Audience Theatre - Complete | 10,000 | $8,403 | $8,403 | $0.12966 | $9,579 | $0.14782 | $10,924 | $0.16856 | $11,428 | $0.17634 | $12,268 | $0.18931 |
| A-1 | Motion Picture, Audience Theatre - Complete | 20,000 | $9,699 | $9,699 | $0.48497 | $11,057 | $0.55286 | $12,609 | $0.63046 | $13,191 | $0.65956 | $14,161 | $0.70805 |
| A-1 | Motion Picture, Audience Theatre - Tenant Improvement | 100 | $997 | $997 | $2.78763 | $1,137 | $3.17790 | $1,296 | $3.6239 | $1,356 | $3.79118 | $1,456 | $4.06994 |
| A-1 | Motion Picture, Audience Theatre - Tenant Improvement | 300 | $1,555 | $1,555 | $1.51268 | $1,772 | $1.72445 | $2,021 | $1.96648 | $2,114 | $2.05724 | $2,270 | $2.20851 |
| A-1 | Motion Picture, Audience Theatre - Tenant Improvement | 1,000 | $2,613 | $2,613 | $1.02158 | $2,979 | $1.16460 | $3,398 | $1.32805 | $3,554 | $1.38935 | $3,816 | $1.49151 |
| A-1 | Motion Picture, Audience Theatre - Tenant Improvement | 2,000 | $3,635 | $3,635 | $0.29069 | $4,144 | $0.33139 | $4,726 | $0.37790 | $4,944 | $0.39534 | $5,307 | $0.42441 |
| A-1 | Motion Picture, Audience Theatre - Tenant Improvement | 4,000 | $4,216 | $4,216 | $1.05411 | $4,807 | $1.20168 | $5,481 | $1,37034 | $5,734 | $1.43358 | $6,156 | $1.53899 |
| A-2 | Restaurant, Taverns, Bars (intended for drink or consumption) - Complete | 500 | $1,465 | $1,463 | $0.30261 | $1,671 | $0.91498 | $5,481 | $1.04340 | $1,993 | $1.09155 | $2,140 | $1.17181 |
| A-2 | Restaurant, Taverns, Bars (intended for drink or consumption) - Complete | 1,500 | $2,268 | $2,268 | $0.44790 | $2.586 | $0.51061 | $2,949 | $0.58228 | $3,085 | $0.60915 | $3,311 | $0.65394 |
| A-2 | Restaurant, Taverns, Bars (intended for drink or consumption) - Complete | 5,000 | $3,836 | $3,836 | $0.24972 | $4,373 | $0.28468 | $4,986 | $0.32463 | $5,217 | $0.33961 | $5,600 | $0.36458 |
| A-2 | Restaurant, Taverns, Bars (intended for drink or consumption) - Complete | 10,000 | $5,084 | $5,084 | $0.08519 | $5,796 | $0.09712 | $6,610 | $0.11075 | $6,915 | $0.11586 | $7,423 | $0.12438 |
| A-2 | Restaurant, Taverns, Bars (intended for drink or consumption) - Complete | 20,000 | $3,936 | $5,936 | $0.29681 | $6,767 | $0.33837 | $7,717 | $0.38586 | $8,073 | $0.40367 | $8,667 | $0.4333 |
| A-2 | Restaurant, Taverns, Bars (intended for drink or consumption) - Tenant Improvements | 100 | $817 | $817 | $2.22537 | $931 | $2.53692 | $1,062 | $2.89298 | $1,111 | $3.02650 | $1,192 | $3.24904 |
| A-2 | Restaurant, Taverns, Bars (intended for drink or consumption) - Tenant Improvements | 300 | $1,262 | $1,262 | $1.21518 | $1,438 | $1.38531 | $1,640 | $1.57974 | $1,716 | $1.65265 | $1,842 | $1.77417 |
| A-2 | Restaurant, Taverns, Bars (intended for drink or consumption) - Tenant Improvements | 1,000 | $2,112 | $2,112 | $0.69808 | $2,408 | $0.79582 | $2,746 | $0.90751 | $2,873 | $0.94939 | $3,084 | $1.01920 |
| A-2 | Restaurant, Taverns, Bars (intended for drink or consumption) - Tenant Improvements | 2,000 | $2,811 | $2,811 | $0.23630 | $3,204 | $0.26938 | $3,654 | $0.30713 | $3,822 | $0.32136 | $4,103 | $0.34499 |
| A-2 | Restaurant, Taverns, Bars (intended for drink or consumption) - Tenant Improvements | 4,000 | $3,283 | $3,283 | $0.52078 | $3,743 | $0.93569 | $4,268 | $1.06702 | $4,465 | $1.11627 | $4,793 | $1.19834 |
| A-3 | Church, Community halls, Gymnasiums, Educational (Worship, amusement) - Complete | 500 | $1,649 | $1,649 | $0.97162 | $1,880 | $1.10764 | $2,143 | $1.20310 | $2,242 | $1.32140 | $2,407 | $1.41856 |
| A-3 | Church, Community halls, Gymnasiums, Educational (Worship, amusement) - Complete | 1,500 | $2,620 | $2,620 | $0.53710 | $2,987 | $0.61229 | $3,407 | $0.69823 | $3,564 | $0.73045 | $3,826 | $0.78416 |
| A-3 | Church, Community halls, Gymnasiums, Educational (Worship, amusement) - Complete | 5,000 | $4,500 | $4,500 | $0.27177 | $5,130 | $0.30982 | $5,850 | $0.35330 | $6,120 | $0.36961 | $6,570 | $0.39679 |
| A-3 | Church, Community halls, Gymnasiums, Educational (Worship, amusement) - Complete | 10,000 | $5,859 | $5,859 | $0.10263 | $6,679 | $0.11700 | $7,617 | $0.13342 | $7,968 | $0.13958 | $8,554 | $0.14984 |
| CONSTRUCTION TYPE and RATIO OF REQUIRED EFFORT | |||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| A-3 | Church, Community halls, Gymnasiums, Educational (Worship, amusement) - Complete | 20,000 | $6,885 | $6,885 | $0.34427 | $7,849 | $0.39247 | $8,951 | $0.44755 | $9,364 | $0.46821 | $10,053 | $0.50264 |
| A-3 | Church, Community halls, Gymnasiums, Educational (worship, amusement) - Tenant Improvements | 100 | $904 | $904 | $2.20207 | $1,030 | $2.11036 | $1,175 | $2.56270 | $1,229 | $2.99482 | $1,319 | $3.21503 |
| A-3 | Church, Community halls, Gymnasiums, Educational (worship, amusement) - Tenant Improvements | 300 | $1,344 | $1,344 | $1.23916 | $1,532 | $1.41264 | $1,747 | $1.61091 | $1,828 | $1.68526 | $1,962 | $1.80918 |
| A-3 | Church, Community halls, Gymnasiums, Educational (worship, amusement) - Tenant Improvements | 1,000 | $2,211 | $2,211 | $0.80836 | $2,521 | $0.92153 | $2,875 | $1.05087 | $3,007 | $1.09937 | $3,229 | $1.18021 |
| A-3 | Church, Community halls, Gymnasiums, Educational (worship, amusement) - Tenant Improvements | 2,000 | $3,020 | $3,020 | $0.23436 | $3.442 | $0.26716 | $3.926 | $0.30466 | $4.107 | $0.31872 | $4,409 | $0.34216 |
| A-3 | Church, Community halls, Gymnasiums, Educational (worship, amusement) - Tenant Improvements | 4,000 | $3,488 | $3,488 | $0.87210 | $3,977 | $0.99420 | $4,535 | $1.13373 | $4,744 | $1.18606 | $5,093 | $1.27327 |
| A-4 | Arenas, Skating Rinks (indoor sporting events and activities) - Complete | 1,000 | $2,046 | $2,046 | $0.56679 | $2,333 | $0.64614 | $2,660 | $0.73683 | $2,783 | $0.77083 | $2,987 | $0.82751 |
| A-4 | Arenas, Skating Rinks (indoor sporting events and activities) - Complete | 3,000 | $3,180 | $3,180 | $0.31362 | $3,625 | $0.35752 | $4,134 | $0.40770 | $4,324 | $0.42652 | $4,642 | $0.45788 |
| A-4 | Arenas, Skating Rinks (indoor sporting events and activities) - Complete | 10,000 | $5,375 | $5,375 | $0.21986 | $6,127 | $0.25064 | $6,987 | $0.28582 | $7,310 | $0.29901 | $7,847 | $0.32100 |
| A-4 | Arenas, Skating Rinks (indoor sporting events and activities) - Complete | 20,000 | $7,574 | $7,574 | $0.05890 | $8,634 | $0.06715 | $9,846 | $0.07657 | $10,300 | $0.08010 | $11,057 | $0.08599 |
| A-4 | Arenas, Skating Rinks (indoor sporting events and activities) - Complete | 40,000 | $8,752 | $8,752 | $0.21879 | $9,977 | $0.24942 | $11,377 | $0.28443 | $11.902 | $0.29755 | $12,777 | $0.31943 |
| A-4 | Arenas, Skating Rinks (indoor sporting events and activities) - Tenant Improvements | 500 | $1,159 | $1,159 | $0.63191 | $1,321 | $0.74317 | $1,307 | $0.84748 | $1,376 | $0.85659 | $1,692 | $0.95178 |
| A-4 | Arenas, Skating Rinks (indoor sporting events and activities) - Tenant Improvements | 1,500 | $1,811 | $1,811 | $0.36420 | $2,065 | $0.41519 | $2,354 | $0.47346 | $2,463 | $0.49531 | $2,644 | $0.53173 |
| A-4 | Arenas, Skating Rinks (indoor sporting events and activities) - Tenant Improvements | 5,000 | $3,086 | $3,086 | $0,22112 | $3,518 | $0.25208 | $4,011 | $0.28746 | $4,197 | $0.30072 | $4,505 | $0.32284 |
| A-4 | Arenas, Skating Rinks (indoor sporting events and activities) - Tenant Improvements | 10,000 | $4,191 | $4,191 | $0.06701 | $4,778 | $0.07639 | $5,449 | $0.08711 | $5,700 | $0.09113 | $6,119 | $0.09783 |
| A-4 | Arenas, Skating Rinks (indoor sporting events and activities) - Tenant Improvements | 20,000 | $4,861 | $4,861 | $0.24307 | $5,542 | $0.27710 | $6,320 | $0.31599 | $6,611 | $0.33057 | $7,098 | $0.35488 |
| A-5 | Amusement Park Structures, Stadiums (outdoor activities) - Actual time @ Staff Hourly Rates and/ |
- | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - |
| A-5 | Amusement Park Structures, Stadiums (outdoor activities) - Actual time @ Staff Hourly Rates and/ |
- | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - |
| A-5 | Amusement Park Structures, Stadiums (outdoor activities) - Actual time @ Staff Hourly Rates and/ |
- | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - |
| A-5 | Amusement Park Structures, Stadiums (outdoor activities) - Actual time @ Staff Hourly Rates and/ |
- | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - |
| A-5 | Amusement Park Structures, Stadiums (outdoor activities) - Actual time @ Staff Hourly Rates and/ |
- | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - |
| A-5 | Amusement Park Structures, Stadiums (Outdoor Activities) Tenant Improvements - Actual Time @ Staff Hourly Rates and/ |
- | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - |
| A-5 | Amusement Park Structures, Stadiums (Outdoor Activities) Tenant Improvements - Actual Time @ Staff Hourly Rates and/ |
- | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - |
| A-5 | Amusement Park Structures, Stadiums (Outdoor Activities) Tenant Improvements - Actual Time @ Staff Hourly Rates and/ |
- | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - |
| A-5 | Amusement Park Structures, Stadiums (Outdoor Activities) Tenant Improvements - Actual Time @ Staff Hourly Rates and/ |
- | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - |
| CONSTRUCTION TYPE and RATIO OF REQUIRED EFFORT | |||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| A-5 | Amusement Park Structures, Stadiums (Outdoor Activities) Tenant Improvements - Actual Time @ Staff Hourly Rates and/ |
- | $ - | $ - | $ - | $ - | $ - | $ - | $ - | 5 - | $ - | $ - | $ - |
| B | Professional Offices/ |
500 | $966 | $966 | $0.68111 | $1,101 | $0.77646 | $1,256 | $0.38544 | $1,314 | $0.92631 | $1,410 | $0.99442 |
| B | Professional Offices/ |
1,500 | $1,647 | $1,647 | $0.35659 | $1,877 | $0.40651 | $2,141 | $0.46357 | $2,240 | $0.48497 | $2,405 | $0.52062 |
| B | Professional Offices/ |
5,000 | $2,895 | $2,895 | $0.13422 | $3,300 | $0.15301 | $3,763 | $0.17449 | $3,937 | $0.18254 | $4,227 | $0.19596 |
| B | Professional Offices/ |
10,000 | $3,566 | $3,566 | $0.07238 | $4,065 | $0.08251 | $4,636 | $0.09409 | $4,850 | $0.09843 | $5,206 | $0.10567 |
| B | Professional Offices/ |
20,000 | $4,290 | $4,290 | $0.21449 | $4,890 | $0.24452 | $5,577 | $0.27884 | $5,834 | $0.29171 | $6,263 | $0.31316 |
| B | Professional Offices/ |
50 | $615 | $615 | $2.33911 | $701 | $2.66659 | $795 | $3.04085 | $836 | $3.18119 | $897 | $3.41511 |
| B | Professional Offices/ |
150 | $849 | $849 | $1.44402 | $967 | $1.64618 | $1,103 | $1.87723 | $1,154 | $1.96387 | $1,239 | $2.10827 |
| B | Professional Offices/ |
500 | $1,354 | $1,354 | $1.07302 | $1,544 | $1.22324 | $1,760 | $1.39492 | $1,841 | $1.45930 | $1.977 | $1.56661 |
| B | Professional Offices/ |
1,000 | $1,890 | $1,890 | $0.24006 | $2,155 | $0.27366 | $2,458 | $0.31207 | $2,571 | $0.32648 | $2,760 | $0.35048 |
| B | Professional Offices/ |
2,000 | $2,131 | $2,131 | $1.06526 | $2,429 | $1.21440 | $2,770 | $1.38484 | $2,898 | $1.44876 | $3,111 | $1.55528 |
| E | Educational through 12th Grade, Day Care Facilities - Complete | 300 | $1,554 | $1,554 | $1.60784 | $1,772 | $1.83294 | $2,021 | $2.09020 | $2,114 | $2.18667 | $2,269 | $2.34745 |
| E | Educational through 12th Grade, Day Care Facilities - Complete | 900 | $2,519 | $2,519 | $0.87791 | $2,872 | $1.00081 | $3,275 | $1.14128 | $3,426 | $1.19395 | $3,678 | $1.28175 |
| E | Educational through 12th Grade, Day Care Facilities - Complete | 3,000 | $4,363 | $4,363 | $0.44874 | $4,973 | $0.51157 | $5,672 | $0.58337 | $5,933 | $0.61029 | $6,370 | $0.65517 |
| E | Educational through 12th Grade, Day Care Facilities - Complete | 6,000 | $5,709 | $5,709 | $0.16819 | $6,508 | $0.19174 | $7,422 | $0.21865 | $7,764 | $0.22874 | $8,335 | $0.24556 |
| E | Educational through 12th Grade, Day Care Facilities - Complete | 12,000 | $6,718 | $6,718 | $0.55984 | $7,659 | $0.63822 | $8,733 | $0.72779 | $9,137 | $0.76138 | $9,808 | $0.81736 |
| E | Educational through 12th Grade, Day Care Facilities - Tenant Improvements | 100 | $784 | $784 | $1.77101 | $893 | $2.01895 | $1,019 | $2.30231 | $1,066 | $2.40857 | $1,144 | $2.58568 |
| E | Educational through 12th Grade, Day Care Facilities - Tenant Improvements | 300 | $1,138 | $1,135 | $1.02379 | $1,297 | $1.16713 | $1,479 | $1.33093 | $1,547 | $1.39236 | $1,661 | $1.49474 |
| E | Educational through 12th Grade, Day Care Facilities - Tenant Improvements | 1,000 | $1,854 | $1,854 | $0.73575 | $2,114 | $0.83875 | $2,411 | $0.95647 | $2,522 | $1.00062 | $2,707 | $1.07419 |
| E | Educational through 12th Grade, Day Care Facilities - Tenant Improvements | 2,000 | $2,590 | $2,590 | $0.18481 | $2,953 | $0.21069 | $3,367 | $0.24026 | $3,523 | $0.25135 | $3,782 | $0.26983 |
| E | Educational through 12th Grade, Day Care Facilities - Tenant Improvements | 4,000 | $2,960 | $2,960 | $0.73996 | $3,374 | $0.84355 | $3,848 | $0.96194 | $4,025 | $1.00634 | $4,321 | $1.08034 |
| F-1 | Moderate Hazard Factory - Complete | 500 | $1,368 | $1,368 | $0.66679 | $1,560 | $0.76014 | $1,779 | $0.3668 | $1,861 | $0.90684 | $1,998 | $0.97352 |
| F-1 | Moderate Hazard Factory - Complete | 1,500 | $2,035 | $2,035 | $0.39036 | $2,320 | $0.44501 | $2,646 | $0.50747 | $2,768 | $0.53089 | $2,971 | $0.36993 |
| F-1 | Moderate Hazard Factory - Complete | 5,000 | $3,401 | $3,401 | $0.22113 | $3,877 | $0.25209 | $4,422 | $0.28747 | $4,626 | $0.30073 | $4,966 | $0.32285 |
| F-1 | Moderate Hazard Factory - Complete | 10,000 | $4,507 | $4,507 | $0.07040 | $5,138 | $0.8026 | $5,859 | $0.09132 | $6,129 | $0.09574 | $6,580 | $0.10278 |
| F-1 | Moderate Hazard Factory - Complete | 20,000 | $3,211 | $3,211 | $0.26055 | $3,540 | $0.29702 | $6,774 | $0.33871 | $7,087 | $0.35434 | $7,608 | $0.38040 |
| F-1 | Moderate Hazard Factory - Tenant Improvements | 100 | $590 | $590 | $1.41190 | $672 | $1.60966 | $767 | $1.83335 | $802 | $1.92030 | $861 | $2.06150 |
| F-1 | Moderate Hazard Factory - Tenant Improvements | 300 | $872 | $872 | $0.79884 | $994 | $0.91068 | $1,134 | $1.03849 | $1,186 | $1.08642 | $1,273 | $1.16631 |
| F-1 | Moderate Hazard Factory - Tenant Improvements | 1,000 | $1,431 | $1,431 | $0.44161 | $1,632 | $0.50344 | $1,861 | $0.57410 | $1,946 | $0.60059 | $2,090 | $0.64475 |
| CONSTRUCTION TYPE and RATIO OF REQUIRED EFFORT | |||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| F-1 | Moderate Hazard Factory - Tenant Improvements | 2,000 | $1,873 | $1,873 | $0.15002 | $2,135 | $0.17102 | $2,435 | $0.19502 | $2,547 | $0.20402 | $2,734 | $0.21902 |
| F-1 | Moderate Hazard Factory - Tenant Improvements | 4,000 | $2,173 | $2,173 | $0.54322 | $2,477 | $0.61927 | $2,333 | $0.70619 | $2,955 | $0.73878 | $3,172 | $0.79310 |
| F-1 | Electric Generation Plants - Geothermal - Structures Complete | 300 | $1,298 | $1,298 | $0.94232 | $1,479 | $1.07424 | $1,687 | $1.22501 | $1,765 | $1.28155 | $1,895 | $1.37578 |
| F-1 | Electric Generation Plants - Geothermal - Structures Complete | 900 | $1,863 | $1,863 | $0.57081 | $2,124 | $0.65072 | $2,422 | $0.74205 | $2,534 | $0.77630 | $2,720 | $0.83338 |
| F-1 | Electric Generation Plants - Geothermal - Structures Complete | 3,000 | $3,062 | $3,062 | $0.34649 | $3,491 | $0.39500 | $3,980 | $0.45044 | $4,164 | $0.47123 | $4,470 | $0.50588 |
| F-1 | Electric Generation Plants - Geothermal - Structures Complete | 6,000 | $4,101 | $4,101 | $0.09989 | $4,676 | $0.11388 | $5,332 | $0.12986 | $5,578 | $0.13586 | $5,988 | $0.14585 |
| F-1 | Electric Generation Plants - Geothermal - Structures Complete | 12,000 | $4,701 | $4,701 | $0.39173 | $5,339 | $0.44657 | $6,111 | $0.30924 | $6,393 | $0.53275 | $6,863 | $0.37192 |
| F-1 | Electric Generation Plants - Geothermal - Structural Improvements | 50 | $970 | $970 | $4.30612 | $1,106 | $1,90597 | $1,261 | $3.39795 | $1,319 | $5.85632 | $1,416 | $6.28693 |
| F-1 | Electric Generation Plants - Geothermal - Structural Improvements | 150 | $1,900 | $1,400 | $2.64510 | $1,597 | $3.01542 | $1,821 | $3.43863 | $1,905 | $3.59734 | $2,045 | $3.86185 |
| F-1 | Electric Generation Plants - Geothermal - Structural Improvements | 500 | $2,326 | $2,326 | $1.34654 | $2,652 | $1.53506 | $3,024 | $1.75051 | $3,164 | $1.83130 | $3,396 | $1.96595 |
| F-1 | Electric Generation Plants - Geothermal - Structural Improvements | 1,000 | $3,000 | $3,000 | $0.44963 | $3,419 | $0.51258 | $3,399 | $0.58452 | $4,079 | $0.61150 | $4,379 | $0.65646 |
| F-1 | Electric Generation Plants - Geothermal - Structural Improvements | 2,000 | $3,449 | $3,449 | $1.72458 | $3,932 | $1.96603 | $4,484 | $2.24196 | $4,691 | $2.34543 | $5,036 | $2.51789 |
| S-1 or F-1 | Battery Energy Storage System - Industrial (nonportable) - Complete | 100 | $399 | $399 | $0.96974 | $455 | $1.10550 | $319 | $1.26036 | $542 | $1.31884 | $387 | $1.41582 |
| S-1 or F-1 | Battery Energy Storage System - Industrial (nonportable) - Complete | 300 | $593 | $593 | $0.53000 | $676 | $0.60420 | $771 | $0.68900 | $806 | $0.72080 | $866 | $0.77380 |
| S-1 or F-1 | Battery Energy Storage System - Industrial (nonportable) - Complete | 1,000 | $964 | $964 | $0.27432 | $1,099 | $0.31272 | $1,253 | $0.35661 | $1,311 | $0.37307 | $1,407 | $0.40050 |
| S-1 or F-1 | Battery Energy Storage System - Industrial (nonportable) - Complete | 2,000 | $1,238 | $1,238 | $0.10320 | $1,411 | $0.11765 | $1,610 | $0.13416 | $1,684 | $0.14035 | $1,808 | $0.15067 |
| S-1 or F-1 | Battery Energy Storage System - Industrial (nonportable) - Complete | 4,000 | $1,445 | $1,445 | $0.36114 | $1,647 | $0.41170 | $1,878 | $0.46948 | $1,965 | $0.49115 | $2,109 | $0.52726 |
| S-1 or F-1 | Battery Energy System - Commercial (nonportable) - Complete | 50 | $314 | $314 | $1.18398 | $358 | $1.34974 | $408 | $1.33915 | $427 | $1.61022 | $458 | $1.72862 |
| S-1 or F-1 | Battery Energy System - Commercial (nonportable) - Complete | 150 | $432 | $432 | $0.65247 | $493 | $0.74381 | $562 | $0.84821 | $588 | $0.88736 | $631 | $0.95260 |
| S-1 or F-1 | Battery Energy System - Commercial (nonportable) - Complete | 500 | $661 | $661 | $0.40932 | $753 | $0.46663 | $859 | $0.53212 | $899 | $0.55668 | $965 | $0.59761 |
| S-1 or F-1 | Battery Energy System - Commercial (nonportable) - Complete | 1,000 | $865 | $865 | $0.13139 | $986 | $0.14979 | $1,125 | $0.17081 | $1,177 | $0.17869 | $1,263 | $0.19183 |
| S-1 or F-1 | Battery Energy System - Commercial (nonportable) - Complete | 2,000 | $997 | $897 | $0.39236 | $1,134 | $0.56813 | $1,296 | $0.64787 | $1,356 | $0.67777 | $1,455 | $0.72761 |
| S-1 | Battery Energy Storage System - Residential (nonportable) - Complete | 25 | $296 | $296 | $2,510 | $337 | $2.08061 | $383 | $2.37262 | $402 | $2.48213 | $432 | $2.66167 |
| S-1 | Battery Energy Storage System - Residential (nonportable) - Complete | 50 | $342 | $342 | $1.25875 | $389 | $1.43498 | $444 | $1.63638 | $464 | $1.71191 | $499 | $1.83778 |
| S-1 | Battery Energy Storage System - Residential (nonportable) - Complete | 100 | $404 | $404 | $0.27960 | $461 | $0.31875 | $526 | $0.36348 | $550 | $0.38026 | $591 | $0.40822 |
| S-1 | Battery Energy Storage System - Residential (nonportable) - Complete | 250 | $446 | $446 | $0.64451 | $509 | $0.73474 | $580 | $0.83786 | $607 | $0.87653 | $652 | $0.94099 |
| S-1 | Battery Energy Storage System - Residential (nonportable) - Complete | 500 | $608 | $608 | $1.21506 | $693 | $1.38516 | $790 | $1.37937 | $826 | $1.63248 | $887 | $1.77398 |
| S-1 | Battery Energy Storage System - Residential Poratble | 40 | $286 | $286 | $1.12146 | $325 | $1.27846 | $371 | $1.43700 | $388 | $1.52518 | $417 | $1.63733 |
| S-1 | Battery Energy Storage System - Residential Poratble | 80 | $330 | $330 | $0.74841 | $377 | $0.85318 | $429 | $0.97293 | $449 | $1.01783 | $482 | $1.09267 |
| CONSTRUCTION TYPE and RATIO OF REQUIRED EFFORT | |||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| S-1 | Battery Energy Storage System - Residential Poratble | 160 | $390 | $390 | $0.16074 | $445 | $0.18324 | $507 | $0.20896 | $531 | $0.21860 | $570 | $0.23467 |
| S-1 | Battery Energy Storage System - Residential Poratble | 400 | $429 | $429 | $0.39717 | $489 | $0.45277 | $557 | $0.51632 | $583 | $0.54015 | $626 | $0.57986 |
| S-1 | Battery Energy Storage System - Residential Poratble | 800 | $588 | $588 | $0.73460 | $670 | $0.83744 | $764 | $0.95498 | $799 | $0.99906 | $858 | $1.07252 |
| S-1 | Battery Storage - Industrial/ |
32 | $263 | $263 | $1.08621 | $302 | $1.23828 | $344 | $1.41208 | $360 | $1047725 | $380 | $1.38387 |
| S-1 | Battery Storage - Industrial/ |
96 | $334 | $334 | $0.59865 | $381 | $0.68247 | $434 | $0.77825 | $454 | $0.81417 | $488 | $0.87404 |
| S-1 | Battery Storage - Industrial/ |
320 | $468 | $468 | $0.50484 | $534 | $0.57551 | $609 | $0.65629 | $637 | $0.68658 | $684 | $0.73706 |
| S-1 | Battery Storage - Industrial/ |
640 | $630 | $630 | $0.13328 | $718 | $0.15194 | $819 | $0.17327 | $857 | $0.18126 | $920 | $0.19459 |
| S-1 | Battery Storage - Industrial/ |
1,280 | $715 | $715 | $0.55865 | $815 | $0.63691 | $930 | $0.72630 | $973 | $0.75982 | $1,044 | $0.31569 |
| S-1 | Battery Storage - Upgrade | 40 | $233 | $233 | $0.69997 | $266 | $0.79796 | $303 | $0.90996 | $317 | $0.95196 | $341 | $1.02195 |
| S-1 | Battery Storage - Upgrade | 120 | $289 | $289 | $0.36013 | $330 | $0.41055 | $376 | $0.46817 | $394 | $0.48978 | $423 | $0.52580 |
| S-1 | Battery Storage - Upgrade | 400 | $390 | $390 | $0.38181 | $445 | $0.43527 | $507 | $0.49636 | $531 | $0.51926 | $570 | $0.55745 |
| S-1 | Battery Storage - Upgrade | 800 | $543 | $543 | $0.08919 | $619 | $0.10167 | $706 | $0.11594 | $738 | $0.12129 | $793 | $0.13021 |
| S-1 | Battery Storage - Upgrade | 1,600 | $614 | $614 | $0.38394 | $700 | $0.43769 | $799 | $0.49912 | $835 | $0.52215 | $897 | $0.56055 |
| F-2 | Gypsum, Glass (Low Hazard Factory) - Complete | 500 | $1,397 | $1,397 | $0.67901 | $1,393 | $0.77407 | $1,316 | $0.38272 | $1,900 | $0.92346 | $2,040 | $0.99136 |
| F-2 | Gypsum, Glass (Low Hazard Factory) - Complete | 1,500 | $2,076 | $2,076 | $0.40127 | $2,367 | $0.45745 | $2,699 | $0.52165 | $2,824 | $0.54573 | $3,031 | $0.58583 |
| F-2 | Gypsum, Glass (Low Hazard Factory) - Complete | 5,000 | $3,481 | $3,481 | $0.22571 | $3,968 | $0.25731 | $4,525 | $0.29343 | $4,734 | $0.30697 | $5,082 | $0.32954 |
| F-2 | Gypsum, Glass (Low Hazard Factory) - Complete | 10,000 | $4,609 | $4,609 | $0.07108 | $5,254 | $0.08103 | $5,992 | $0.09241 | $6,268 | $0.09667 | $6,729 | $0.10378 |
| F-2 | Gypsum, Glass (Low Hazard Factory) - Complete | 20,000 | $5,326 | $5,320 | $0.26600 | $6,065 | $0.30324 | $6,916 | $0.34580 | $7,235 | $0.36176 | $7,767 | $0.38836 |
| F-2 | Gypsum, Glass (Low Hazard Factory) - Tenant Improvement | 100 | $752 | $752 | $2.02332 | $858 | $2.30659 | $973 | $2.03032 | $1,023 | $2.75172 | $1,098 | $2,93405 |
| F-2 | Gypsum, Glass (Low Hazard Factory) - Tenant Improvement | 300 | $1,157 | $1,157 | $1.10509 | $1,319 | $1.25981 | $1,504 | $1.43662 | $1,573 | $1,50293 | $1,689 | $1.061344 |
| F-2 | Gypsum, Glass (Low Hazard Factory) - Tenant Improvement | 1,000 | $1,931 | $1,931 | $0.65209 | $2,201 | $0.74338 | $2,510 | $0.84772 | $2,626 | $0.88684 | $2,819 | $0.95205 |
| F-2 | Gypsum, Glass (Low Hazard Factory) - Tenant Improvement | 2,000 | $2,583 | $2,583 | $0.21431 | $2,944 | $0.24431 | $3,357 | $0.27860 | $3,512 | $0.29146 | $3,771 | $0.31289 |
| F-2 | Gypsum, Glass (Low Hazard Factory) - Tenant Improvement | 4,000 | $3,011 | $3,011 | $0.75281 | $3,433 | $0.85820 | $3,915 | $0.97863 | $4,095 | $1.02382 | $4,396 | $1.09910 |
| H-1 | Detonation Hazards - Complete | 500 | $1,646 | $1,646 | $0.2112 | $1,376 | $0.94747 | $2,139 | $1.08045 | $2,238 | $1.13032 | $2,403 | $1.21343 |
| H-1 | Detonation Hazards - Complete | 1,500 | $2,477 | $2,477 | $0.48248 | $2,823 | $0.55003 | $3,220 | $0.62723 | $3,368 | $0.65617 | $3,616 | $0.70442 |
| H-1 | Detonation Hazards - Complete | 5,000 | $4,165 | $4,165 | $0.29185 | $4,749 | $0.33271 | $5,415 | $0.37940 | $5,665 | $0.39692 | $6,081 | $0.42610 |
| H-1 | Detonation Hazards - Complete | 10,000 | $5,625 | $5,625 | $0.08678 | $6,412 | $0.09892 | $7,312 | $0.11281 | $7,649 | $0.11801 | $8,212 | $0.12669 |
| H-1 | Detonation Hazards - Complete | 20,000 | $6,492 | $6,492 | $0.132465 | $7,401 | $0.37006 | $8,440 | $0.42200 | $8,830 | $0.44148 | $9,479 | $0.47394 |
| H-2 | Deflagration or Accelerated Burning - Complete | 500 | $1,430 | $1,430 | $0.79331 | $1,630 | $0.90437 | $1,859 | $1.03130 | $1,945 | $1.07890 | $2,088 | $1.15823 |
| H-2 | Deflagration or Accelerated Burning - Complete | 1,500 | $2,223 | $2,223 | $0.44714 | $2,535 | $0.50974 | $2,890 | $0.58129 | $3,024 | $0.60812 | $3,246 | $0.65283 |
| H-2 | Deflagration or Accelerated Burning - Complete | 5,000 | $3,788 | $3,788 | $0.23866 | $4,319 | $0.27207 | $4,925 | $0.31025 | $5,152 | $0.32457 | $5,531 | $0.34844 |
| H-2 | Deflagration or Accelerated Burning - Complete | 10,000 | $4,982 | $4,982 | $0.08326 | $5,679 | $0.09491 | $6,476 | $0.10823 | $6,775 | $0.11323 | $7,273 | $0.12155 |
| CONSTRUCTION TYPE and RATIO OF REQUIRED EFFORT | |||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| H-2 | Deflagration or Accelerated Burning - Complete | 20,000 | $5,814 | $5,814 | $0.29071 | $6,628 | $0.33142 | $7,355 | $0.37793 | $7,907 | $0.39537 | $8,489 | $0.42444 |
| H-3 | Combustibles and Flammables - Complete | 500 | $1,490 | $1,490 | $0.31253 | $1,698 | $0.92628 | $1,931 | $1.05628 | $2,026 | $1,10504 | $2,175 | $1.18629 |
| H-3 | Combustibles and Flammables - Complete | 1,500 | $2,302 | $2,302 | $0.46431 | $2,625 | $0.52931 | $2,993 | $0.60360 | $3,131 | $0.63146 | $3,362 | $0.67789 |
| H-3 | Combustibles and Flammables - Complete | 5,000 | $3,927 | $3,927 | $0.24314 | $4,477 | $0.27718 | $5,106 | $0.31608 | $5,341 | $0.33067 | $5,734 | $0.35498 |
| H-3 | Combustibles and Flammables - Complete | 10,000 | $5,143 | $5,143 | $0.08486 | $5,863 | $0.09674 | $6,686 | $0.11031 | $6,995 | $0.11541 | $7,509 | $0.12389 |
| H-3 | Combustibles and Flammables - Complete | 20,000 | $5,992 | $3,992 | $0.29955 | $6,831 | $0.34135 | $7,789 | $0.38946 | $8,149 | $0,40744 | $8,748 | $0.43740 |
| H-4 | Corrosives and Toxic Materials (Health Hazard) - Complete | 500 | $1,490 | $1,490 | $0.31233 | $1,698 | $0.92628 | $1,937 | $1.03628 | $2,026 | $1.10504 | $2,173 | $1.18629 |
| H-4 | Corrosives and Toxic Materials (Health Hazard) - Complete | 1,500 | $2,302 | $2,302 | $0.46431 | $2.625 | $0.52931 | $2,993 | $0.60360 | $3,131 | $0.63146 | $3,362 | $0.67789 |
| H-4 | Corrosives and Toxic Materials (Health Hazard) - Complete | 5,000 | $3,927 | $3,927 | $0.24314 | $4,477 | $0.27718 | $5,106 | $0.31608 | $5,341 | $0.33067 | $5,734 | $0.35498 |
| H-4 | Corrosives and Toxic Materials (Health Hazard) - Complete | 10,000 | $5,143 | $5,143 | $0.08486 | $3,863 | $0.09674 | $6,686 | $0.11031 | $6,995 | $0.11541 | $7,509 | $0.12389 |
| H-4 | Corrosives and Toxic Materials (Health Hazard) - Complete | 20,000 | $5,992 | $5,992 | $0.29955 | $6,831 | $0.34153 | $7,789 | $0.38946 | $8,149 | $0.40744 | $3,748 | $0.43740 |
| H-5 | Semiconductor Fabrication Facilities, Compatible Research and Development Areas - Complete | 500 | $1,528 | $1,528 | $0.34863 | $1,742 | $0.96746 | $1,987 | $1.10324 | $2,079 | $1.15416 | $2,232 | $1.23902 |
| H-5 | Semiconductor Fabrication Facilities, Compatible Research and Development Areas - Complete | 1,500 | $2,377 | $2,377 | $0.48475 | $2,710 | $0.55262 | $3,090 | $0.63018 | $3,233 | $0.65926 | $3,471 | $0.70774 |
| H-5 | Semiconductor Fabrication Facilities, Compatible Research and Development Areas - Complete | 5,000 | $4,074 | $4,074 | $0.24983 | $4,644 | $0.28480 | $5,296 | $0.32478 | $5,540 | $0.33976 | $5,948 | $0.36475 |
| H-5 | Semiconductor Fabrication Facilities, Compatible Research and Development Areas - Complete | 10,000 | $5,323 | $5,323 | $0.08820 | $6,068 | $0.10055 | $6,920 | $0.11466 | $7,239 | $0.11995 | $7,771 | $0.12877 |
| H-5 | Semiconductor Fabrication Facilities, Compatible Research and Development Areas - Complete | 20,000 | $6,205 | $6,205 | $0.31024 | $7,074 | $0.35368 | $8,066 | $0.40332 | $8,439 | $0.42193 | $9,059 | $0.45296 |
| I-1 | Hazardous Tenant Improvements | 100 | $913 | $913 | $1.27970 | $1,040 | $1.45886 | $1,186 | $1.66361 | $1.241 | $1.74040 | $1,332 | $1.86837 |
| I-1 | Hazardous Tenant Improvements | 300 | $1,169 | $1,169 | $0.94191 | $1,332 | $1.07378 | $1,519 | $1.22448 | $1,589 | $1.28100 | $1,706 | $1.37519 |
| I-1 | Hazardous Tenant Improvements | 1,000 | $1,828 | $1,828 | $0.55504 | $2,084 | $0.63275 | $2,376 | $0.72155 | $2,486 | $0.75486 | $2,669 | $0.81036 |
| I-1 | Hazardous Tenant Improvements | 2,000 | $2,383 | $2,383 | $0.13753 | $2,716 | $0.15685 | $3,098 | $0.17886 | $3,241 | $0.18711 | $3,479 | $0.20087 |
| I-1 | Hazardous Tenant Improvements | 4,000 | $2,658 | $2,638 | $0.66431 | $3,030 | $0.75755 | $3,455 | $0.86387 | $3,615 | $0.90374 | $3,381 | $0.97019 |
| I-2 | Institutional Group (Medical Care on a 24-hr Basis 5+ Person) - Complete | 2,000 | $2,321 | $2,321 | $0.37063 | $2,646 | $0.42253 | $3,017 | $0.48184 | $3,137 | $0.30407 | $3,359 | $0.54114 |
| I-2 | Institutional Group (Medical Care on a 24-hr Basis 5+ Person) - Complete | 6,000 | $3,804 | $3,804 | $0.19889 | $4,336 | $0.22674 | $4,945 | $0.25856 | $5,173 | $0.27049 | $5,553 | $0.29038 |
| I-2 | Institutional Group (Medical Care on a 24-hr Basis 5+ Person) - Complete | 20,000 | $6,588 | $6,588 | $0.12124 | $7,510 | $0.13822 | $8,565 | $0.15761 | $8,960 | $0.16489 | $9,619 | $0.17701 |
| I-2 | Institutional Group (Medical Care on a 24-hr Basis 5+ Person) - Complete | 40,000 | $9,013 | $9,013 | $0.03851 | $10,275 | $0.04390 | $11,717 | $0.05006 | $12,258 | $0.05237 | $13,159 | $0.05622 |
| I-2 | Institutional Group (Medical Care on a 24-hr Basis 5+ Person) - Complete | 80,000 | $10,553 | $10,553 | $0.13192 | $12,031 | $0.15038 | $13,719 | $0.17149 | $14,352 | $0.17941 | $15,408 | $0.19260 |
| I-3 | Institutional Restraint and Security - Complete | 6,000 | $5,421 | $5,421 | $0.30521 | $6,179 | $0.34797 | $7,047 | $0.39681 | $7,372 | $0.41513 | $7,914 | $0.44565 |
| I-3 | Institutional Restraint and Security - Complete | 18,000 | $9,083 | $9,083 | $0.16598 | $10,355 | $0.18922 | $11,808 | $0.21578 | $12,353 | $0.22574 | $13,262 | $0.24234 |
| I-3 | Institutional Restraint and Security - Complete | 60,000 | $16,055 | $16,055 | $0.08616 | $18,302 | $0.09822 | $20,871 | $0.11201 | $21,835 | $0.11717 | $23,440 | $0.12579 |
| CONSTRUCTION TYPE and RATIO OF REQUIRED EFFORT | |||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| I-3 | Institutional Restraint and Security - Complete | 120,000 | $21,224 | $21,224 | $0.03151 | $24,196 | $0.03592 | $27,592 | $0.04096 | $28,865 | $0.04285 | $30,987 | $0.04601 |
| I-3 | Institutional Restraint and Security - Complete | 240,000 | $25,006 | $23,006 | $0.10419 | $28,506 | $0.11878 | $32,307 | $0.13545 | $34,008 | $0.147170 | $36,308 | $0.15212 |
| I-4 | Institutional Daycare Facilities (More than 6 persons of any age less than 24 hrs. per day) - Complete | 500 | $1,446 | $1,446 | $0.30187 | $1,6448 | $0.91406 | $1,880 | $1.01233 | $1,966 | $1.09046 | $2,111 | $1.17064 |
| I-4 | Institutional Daycare Facilities (More than 6 persons of any age less than 24 hrs. per day) - Complete | 1,500 | $2,248 | $2,248 | $0.44614 | $2,562 | $0.50860 | $2,922 | $0.57999 | $3,057 | $0.60676 | $3,282 | $0.65137 |
| I-4 | Institutional Daycare Facilities (More than 6 persons of any age less than 24 hrs. per day) - Complete | 5,000 | $3,809 | $3,809 | $0.27263 | $4,343 | $0.31079 | $4,952 | $0.35441 | $5,181 | $0.37077 | $5,561 | $0.39803 |
| I-4 | Institutional Daycare Facilities (More than 6 persons of any age less than 24 hrs. per day) - Complete | 10,000 | $5,172 | $5,172 | $0.08382 | $5,896 | $0.09555 | $6,724 | $0.10896 | $7,034 | $0.11399 | $7,552 | $0.12237 |
| I-4 | Institutional Daycare Facilities (More than 6 persons of any age less than 24 hrs. per day) - Complete | 20,000 | $6,011 | $6,017 | $0.30053 | $6,852 | $0.34260 | $7,814 | $0.39068 | $8,174 | $0.40871 | $8,775 | $0.43877 |
| I | Institutional - Tenant Improvements | 100 | $859 | $859 | $1.60883 | $979 | $1.83407 | $1,117 | $2.09148 | $1,168 | $2.18801 | $1,254 | $2.34889 |
| I | Institutional - Tenant Improvements | 300 | $1,181 | $1,181 | $1.04176 | $1,346 | $1.18761 | $1,535 | $1.35429 | $1,606 | $1.41680 | $1,724 | $1.52097 |
| I | Institutional - Tenant Improvements | 1,000 | $1,910 | $1,910 | $0.60112 | $2,177 | $0.68528 | $2,483 | $0.78146 | $2,598 | $0.81752 | $2,789 | $0.87764 |
| I | Institutional - Tenant Improvements | 2,000 | $2,511 | $2,511 | $0.16847 | $2,863 | $0.19205 | $3,264 | $0.21901 | $3,415 | $0.12912 | $3,666 | $0.24596 |
| I | Institutional - Tenant Improvements | 4,000 | $2,848 | 2,848 | $0.71200 | $3,247 | $0.81168 | $3,702 | $0.92560 | $3,873 | $0.96832 | $4,158 | $1.03953 |
| I | Institutional Restraint and Security - Tenant Improvements | 500 | $1,762 | $1,761 | $0.61903 | $2,009 | $0.70569 | $2,290 | $0,80374 | $2,396 | $0.84188 | $2,372 | $0.90373 |
| I | Institutional Restraint and Security - Tenant Improvements | 1,500 | $2,381 | $2,381 | $0.41578 | $2,714 | $0.47399 | $3,095 | $0.54052 | $3,238 | $0.56546 | $3,476 | $0.60704 |
| I | Institutional Restraint and Security - Tenant Improvements | 5,000 | $3,836 | $3,836 | $0.26727 | $4,373 | $0.30469 | $4,987 | $0.34746 | $5,217 | $0.36349 | $5,601 | $0.39022 |
| I | Institutional Restraint and Security - Tenant Improvements | 10,000 | $5,172 | $5,172 | $0.06553 | $5,897 | $0.07470 | $6,724 | $0.08518 | $7,035 | $0.08912 | $7,552 | $0.09567 |
| I | Institutional Restraint and Security - Tenant Improvements | 20,000 | $3,828 | $3,828 | $0.29139 | $.6,644 | $0.33218 | $1,376 | $0.37880 | $7,926 | $0.39629 | $8,309 | $0.42543 |
| L | Laboratories Group - Complete | 300 | $1,290 | $1,209 | $0.94340 | $1,481 | $1.07548 | $1,689 | $1.22642 | $1,767 | $1.28303 | $1,897 | $1.37737 |
| L | Laboratories Group - Complete | 900 | $1,865 | $1,865 | $0.55138 | $2,126 | $0.62857 | $2,425 | $0.71679 | $2,536 | $0.74987 | $2,723 | $0.80501 |
| L | Laboratories Group - Complete | 3,000 | $3,023 | $3,023 | $0.42128 | $3,446 | $0.48026 | $3,930 | $0.54766 | $4,111 | $0.57294 | $4,413 | $0.61507 |
| L | Laboratories Group - Complete | 6,000 | $4,287 | $4,287 | $0.10040 | $4,387 | $0.11456 | $5,573 | $0.13064 | $5,830 | $0.13667 | $6,259 | $0.14671 |
| L | Laboratories Group - Complete | 12,000 | $4,890 | $4,890 | $0.40747 | $3,374 | $0.46452 | $6,337 | $0.52972 | $6,630 | $0.55416 | $7,139 | $0.59491 |
| L | Laboratories Group L - Tenant Improvements | 100 | $631 | $631 | $1.15295 | $720 | $1.31436 | $821 | $1.49883 | $859 | $1.56801 | $922 | $1.68331 |
| L | Laboratories Group L - Tenant Improvements | 300 | $862 | $862 | $0.69414 | $983 | $0.79132 | $1,121 | $0.90239 | $1,172 | $0.94404 | $1,258 | $1.01345 |
| L | Laboratories Group L - Tenant Improvements | 1,000 | $1,348 | $1,348 | $0.53850 | $1.537 | $0.61389 | $1.752 | $0.70005 | $1,833 | $0.73236 | $1,968 | $0.78621 |
| L | Laboratories Group L - Tenant Improvements | 2,000 | $1,886 | $1,886 | $0.12451 | $2,150 | $0.14194 | $2,452 | $0.16186 | $2.565 | $0.16933 | $2,754 | $0.18178 |
| L | Laboratories Group L - Tenant Improvements | 4,000 | $2,133 | $2,133 | $0,33383 | $2,434 | $0,60837 | $2,776 | $0.59398 | $2,904 | $0.72601 | $3,118 | $0.77940 |
| M | Mercantile (Department, Retail, Drug Stores, Gas Stations - Complete | 800 | $1,368 | $1,368 | $0.50716 | $1,560 | $0.57816 | $1,779 | $0.65931 | $1,861 | $0.68974 | $1,998 | $0.740445 |
| M | Mercantile (Department, Retail, Drug Stores, Gas Stations - Complete | 2,000 | $2,180 | $2,180 | $0.27240 | $2,485 | 0.31054 | $2,834 | $0.35412 | $2,965 | $0.37047 | $3,183 | $0.39771 |
| M | Mercantile (Department, Retail, Drug Stores, Gas Stations - Complete | 8,000 | $3,705 | $3,705 | $0.17916 | $4,224 | $0.20425 | $4,817 | $0.23291 | $5,039 | $0.24366 | $5,410 | $0.26158 |
| CONSTRUCTION TYPE and RATIO OF REQUIRED EFFORT | |||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| M | Mercantile (Department, Retail, Drug Stores, Gas Stations - Complete | 16,000 | $5,139 | $5,139 | $0.05303 | $5,858 | $0.06045 | $6,680 | $0.06893 | $6,989 | $0.07212 | $7,503 | $0.07742 |
| M | Mercantile (Department, Retail, Drug Stores, Gas Stations - Complete | 32,000 | $5,987 | $5,987 | $0.18710 | $6,825 | $0.21329 | $7,783 | $0.24323 | $8,142 | $0.25445 | $8,741 | $0.27316 |
| M | Mercantile (Department, Retail, Drug Stores, Gas Stations - Tenant Improvements | 100 | $684 | $664 | $1.33321 | $780 | $1.74786 | $889 | $1.9317 | $930 | $2.08517 | $999 | $2.23849 |
| M | Mercantile (Department, Retail, Drug Stores, Gas Stations - Tenant Improvements | 300 | $991 | $991 | $0.87369 | $1,130 | $0.99600 | $1,288 | $1.13579 | $1,348 | $1.18821 | $1,447 | $1.27558 |
| M | Mercantile (Department, Retail, Drug Stores, Gas Stations - Tenant Improvements | 1,000 | $1,602 | $1,602 | $0.58813 | $1,827 | $0.67046 | $2,083 | $0.76456 | $2,179 | $0.79985 | $2,340 | $0.85867 |
| M | Mercantile (Department, Retail, Drug Stores, Gas Stations - Tenant Improvements | 2,000 | $2,191 | $2,191 | $0.16374 | $2,497 | $0.18666 | $2,848 | $0.21286 | $2,979 | $0.22269 | $3,198 | $0.23906 |
| M | Mercantile (Department, Retail, Drug Stores, Gas Stations - Tenant Improvements | 4,000 | $2,518 | $2,518 | $0.62950 | $2,871 | $0.71763 | $3,273 | $0.31833 | $3,425 | $0.85613 | $3,676 | $0.91908 |
| S-1 | Storage - Moderate Hazard - Motor Vehicle Repair - Complete | 500 | $1,111 | $1,111 | $0.6916 | $1,267 | $0.78845 | $1,443 | $0.89911 | $1,511 | $0.94061 | $1,023 | $1.00977 |
| S-1 | Storage - Moderate Hazard - Motor Vehicle Repair - Complete | 1,500 | $1,803 | $1,803 | $0.36791 | $2,055 | $0.41942 | $2,344 | $0.47829 | $2,452 | $0.50036 | $2,632 | $0.53716 |
| S-1 | Storage - Moderate Hazard - Motor Vehicle Repair - Complete | 5,000 | $3,091 | $3,091 | $0.20048 | $3,523 | $0.22855 | $4,018 | $0.26062 | $4,203 | $0.27265 | $4,512 | $0.29270 |
| S-1 | Storage - Moderate Hazard - Motor Vehicle Repair - Complete | 10,000 | $4,093 | $4,093 | $0.07311 | $4,666 | $0.08334 | $5,321 | $0.09504 | $5,567 | $0.09942 | $5,976 | $0.10674 |
| S-1 | Storage - Moderate Hazard - Motor Vehicle Repair - Complete | 20,000 | $4,824 | $4,824 | $0.24121 | $5,499 | $0.27497 | $6,271 | $0.31357 | $6.561 | $0.32804 | $7,043 | $0.35216 |
| S-2 | Storage - Low Hazard - Parking Garages - Complete | 2,500 | $1,467 | $1,467 | $0.13799 | $1,673 | $0.13701 | $1,907 | $0.17939 | $1,995 | $0.18767 | $2,142 | $0,20147 |
| S-2 | Storage - Low Hazard - Parking Garages - Complete | 7,500 | $2,157 | $2,157 | $0.08052 | $2,459 | $0,09180 | $2,804 | $0.10468 | $2,934 | $0.10951 | $3,150 | $0.11756 |
| S-2 | Storage - Low Hazard - Parking Garages - Complete | 25,000 | $3,566 | $3,566 | $0.05640 | $4,066 | $0.06430 | $4,636 | $0.07332 | $4,850 | $0.07671 | $5,207 | $0.08235 |
| S-2 | Storage - Low Hazard - Parking Garages - Complete | 50,000 | $4,976 | $4,976 | $0.01442 | $5,673 | $0.01644 | $6,469 | $0.01875 | $6,768 | $0.01962 | $7,266 | $0.02106 |
| S-2 | Storage - Low Hazard - Parking Garages - Complete | 100,000 | $5,698 | $5,698 | $0.65698 | $6,495 | $0.06493 | $7,407 | $0.07407 | $7,749 | $0.07749 | $8,318 | $0.08318 |
| S | Storage - Tenant Improvements | 100 | $519 | $519 | $1.13007 | $391 | $1.28828 | $674 | $1.46909 | $705 | $1.33690 | $737 | $1.64990 |
| S | Storage - Tenant Improvements | 300 | $745 | $745 | $0.62984 | $849 | $0.71802 | $968 | $0.81880 | $1,013 | $0.85659 | $1,087 | $0.91957 |
| S | Storage - Tenant Improvements | 1,000 | $1,186 | $1,186 | $0.41606 | $1,351 | $0.47431 | $1,541 | $0.54088 | $1,612 | $0.56585 | $1,731 | $0.60745 |
| S | Storage - Tenant Improvements | 2,000 | $1,602 | $1,602 | $0.12287 | $1,826 | $0.14007 | $2,082 | $0.15973 | $2,178 | $0.16710 | $2,338 | $0.17939 |
| S | Storage - Tenant Improvements | 4,000 | $1,847 | $1,847 | $0.46183 | $2,106 | $0.52649 | $2,402 | $0.60033 | $2,512 | $0.62809 | $2,697 | $0.67427 |
| U | Utility and Accessory Structures - Agricultural/ |
300 | $337 | $337 | $0.59010 | $612 | $0.67271 | $695 | $0.76712 | $750 | $0.80253 | $784 | $0.86154 |
| U | Utility and Accessory Structures - Agricultural/ |
900 | $891 | $891 | $0.30454 | $1,016 | $0.34718 | $1,158 | $0.39591 | $1.212 | $0.41418 | $1,301 | $0.44463 |
| U | Utility and Accessory Structures - Agricultural/ |
3,000 | $1,531 | $1,531 | $0.11307 | $1,745 | $0.12890 | $1,990 | $0.14699 | $2,082 | $0.15377 | $2,235 | $0.16508 |
| U | Utility and Accessory Structures - Agricultural/ |
6,000 | $1,870 | $1,870 | $0.06338 | $2,132 | $0.07225 | $2,431 | $0.08239 | $2,543 | $0.08620 | $2,730 | $0.09254 |
| U | Utility and Accessory Structures - Agricultural/ |
12,000 | $2,250 | $2,250 | $0.18751 | $2,363 | $0.21376 | $2,925 | $0.24377 | $3,060 | $0.25502 | 3,285 | $0.27377 |
| U | Utility and Accessory Structures - Hangers and Beli-Stops - Complete | 300 | $745 | $745 | $0.74316 | 850 | $0.84720 | $969 | $0.96610 | $1,014 | $1.01069 | $1,088 | $1.08501 |
| U | Utility and Accessory Structures - Hangers and Beli-Stops - Complete | 900 | $1,191 | $1,191 | $0.40071 | $1,358 | $0.45681 | $1,549 | $0.32092 | $1,620 | $0.54496 | $1,739 | $0.58503 |
| CONSTRUCTION TYPE and RATIO OF REQUIRED EFFORT | |||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| U | Utility and Accessory Structures - Hangers and Beli-Stops - Complete | 3,000 | $2,033 | $2,033 | $0.17950 | $2,317 | $0.20463 | $2,643 | $0.23335 | $2,765 | $0.24412 | $2,968 | $0.26207 |
| U | Utility and Accessory Structures - Hangers and Beli-Stops - Complete | 6,000 | $2,571 | $2,571 | $0.07902 | $2,931 | $0.09008 | $3,343 | $0.10272 | $3,497 | $0.10746 | 3,754 | $0.11537 |
| U | Utility and Accessory Structures - Hangers and Beli-Stops - Complete | 12,000 | $3,045 | $3,043 | $0.25378 | $3,472 | $0.28931 | $3,955 | $0.32991 | $4,142 | $0.34314 | $4,446 | $0.37052 |
| U | Utility and Accessory Structures - Garages - Complete | 200 | $465 | $463 | $0.67702 | $530 | $0.77180 | $604 | $0.88012 | $632 | $0.92075 | $679 | $0.98845 |
| U | Utility and Accessory Structures - Garages - Complete | 600 | $736 | $736 | $0.35603 | $839 | $0.40588 | $956 | $0.46284 | $1,001 | $0.48420 | $1,074 | $0.51981 |
| U | Utility and Accessory Structures - Garages - Complete | 2,000 | $1,234 | $1,234 | $0.13866 | $1,407 | $0.15807 | $1,604 | $0.18026 | $1,678 | $0.18858 | $1,802 | $0.20244 |
| U | Utility and Accessory Structures - Garages - Complete | 4,000 | $1,512 | $1,512 | $0.07330 | $1,723 | $0.08356 | $1,965 | $0.09529 | $2,056 | $0.09969 | $2,207 | $0.10702 |
| U | Utility and Accessory Structures - Garages - Complete | 8,000 | $1,803 | $1,803 | $0.225539 | $2,057 | $0.25717 | $2,346 | $0.29327 | $2,454 | $0.30680 | $2,635 | $0.32936 |
| U | Utility and Accessory Structures - Tenant Improvements | 50 | $446 | $446 | $1.33473 | $508 | $1.74959 | $380 | $1.99513 | $606 | $2.08723 | $651 | $2.24070 |
| U | Utility and Accessory Structures - Tenant Improvements | 150 | $599 | $599 | $0.94160 | $683 | $1.07342 | $779 | $1.22408 | $815 | $1.28057 | $875 | $1.37473 |
| U | Utility and Accessory Structures - Tenant Improvements | 500 | $929 | $929 | $0.40677 | $1,059 | $0,46371 | $1,208 | $0.52880 | $1,263 | $0.55320 | $1,356 | $0.59388 |
| U | Utility and Accessory Structures - Tenant Improvements | 1,000 | $1,132 | $1,132 | $0.17523 | $1,291 | $0.19977 | $1,472 | $0.22780 | $1,540 | $0.23832 | $1,653 | $0.25584 |
| U | Utility and Accessory Structures - Tenant Improvements | 2,000 | $1,308 | $1,303 | $0.65378 | $1,491 | $0.74531 | $1,700 | $0.84991 | $1.778 | $0.88914 | $1,909 | $0.934532 |
| O | All Other Commercial Tenant Improvements | 300 | $772 | $772 | $0.60337 | $880 | $0.69013 | $1,004 | $0.78701 | $1,030 | $0.82333 | $1,127 | $0.38337 |
| O | All Other Commercial Tenant Improvements | >900 | $1,135 | $1,135 | $0.33960 | $1,294 | $0.78715 | $1,476 | $0.44149 | $1,544 | $0.46186 | $1,658 | $0,49582 |
| O | All Other Commercial Tenant Improvements | 3,000 | $1,848 | $1,848 | $0.21008 | $2,107 | $0.23949 | $2,403 | $0.27310 | $2,514 | $0.28571 | $2,699 | $0.30672 |
| O | All Other Commercial Tenant Improvements | 6,000 | $2,479 | $2,479 | $0.06561 | $2,826 | $0.07480 | $3.222 | $0,08530 | $3,371 | $0.08924 | $3,619 | $0.09580 |
| O | All Other Commercial Tenant Improvements | 12,000 | $2,872 | $2,872 | $0.23936 | $3,275 | $0.27288 | $3,734 | $0.31117 | $3,906 | $0.32554 | $4,194 | $0.34947 |
| O | All Shell Buildings - Complete | 500 | $772 | $772 | $0.36324 | $830 | $0.41409 | $1,002 | $0.47221 | $1,050 | $0.49400 | $1,127 | $0.53032 |
| O | All Shell Buildings - Complete | 1,500 | $1,135 | $1,135 | $0.20376 | $1,294 | $0.23229 | $1,476 | $0.26489 | $1,544 | $0.27712 | $1,658 | $0.29749 |
| O | All Shell Buildings - Complete | 5,000 | $1,848 | $1,848 | $0.12605 | $2,107 | $0.14370 | $2,403 | $0.16386 | $2,514 | $0.17143 | $2,699 | $0.18403 |
| O | All Shell Buildings - Complete | 10,000 | $2,479 | $2,479 | $0.03937 | $2,826 | $0.04488 | $3,222 | $0.05118 | $3,371 | $0.05354 | $3,619 | $0.05741 |
| O | All Shell Buildings - Complete | 20,000 | $2,872 | $2,872 | $0.14362 | $3,275 | $0.16373 | $3,734 | $0.18670 | $3,906 | $0.19532 | $4.194 | $.00968 |
| R-1 | Residential - Transient (Hotel, Motel, Boarding) | 3,750 | $2,331 | $2,331 | $0.25627 | $2,637 | $0.29215 | $3,030 | $0.33315 | $3,170 | $0.34853 | $3,403 | $0.37416 |
| R-1 | Residential - Transient (Hotel, Motel, Boarding) | 7,500 | $3,292 | $3,397 | $0.13354 | $3,753 | $0.15224 | $4,280 | $0.17360 | $4,477 | $0.18162 | $1,806 | $0.19497 |
| R-1 | Residential - Transient (Hotel, Motel, Boarding) | 15,000 | $4,294 | $4,294 | $0.01529 | $4,895 | $0.01743 | $5,582 | $0.01988 | $5,839 | $0.02080 | $6,269 | $0.02232 |
| R-1 | Residential - Transient (Hotel, Motel, Boarding) | 37,500 | $4,638 | $4,638 | $0.06375 | $5,287 | $0.07268 | $6,029 | $0.05285 | $6,307 | $0.08670 | $6.771 | $0.09308 |
| R-1 | Residential - Transient (Hotel, Motel, Boarding) | 75,000 | $7,028 | $7,028 | $0.09371 | $8,012 | $0,10683 | $10,137 | $0.12183 | $9,559 | $0.12745 | $10,261 | $0.13682 |
| R-2 | Permanent - Apartment Houses, Congregate Residences/ |
1,250 | $2,191 | $2,191 | $0.76112 | $2,498 | $0.36768 | $2,849 | $0.98946 | $2,980 | $1.03513 | $3,199 | $1.11124 |
| R-2 | Permanent - Apartment Houses, Congregate Residences/ |
2,500 | $3,143 | $3,143 | $0.38024 | $3,583 | $0.43348 | $4,086 | $0.49432 | $4,274 | $0.31713 | $4,589 | $0.55515 |
| CONSTRUCTION TYPE and RATIO OF REQUIRED EFFORT | |||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| R-2 | Permanent - Apartment Houses, Congregate Residences/ |
5,000 | $4,093 | $4,093 | $0.04441 | $4,667 | $0.05063 | $5,321 | $0.05773 | $5,567 | $0.06040 | $5,976 | $0.06484 |
| R-2 | Permanent - Apartment Houses, Congregate Residences/ |
12,500 | $4,427 | $4,427 | $0.18045 | $5,046 | $0.20571 | $5,754 | $0.23459 | $6,020 | $0.24541 | $6,463 | $0.26346 |
| R-2 | Permanent - Apartment Houses, Congregate Residences/ |
25,000 | $6,682 | $6,682 | $0.26729 | $7,618 | $0.30471 | $8,687 | $0.34747 | $3,055 | $0.36331 | $9,756 | $0.39024 |
| R-3 | Accessory Dwelling Unit Detached (Up to 1,200 sq. ft.) | 188 | $903 | $903 | $1.92600 | $1,030 | $2.19564 | $1,174 | $2.30380 | $1,228 | $2.61936 | $1,319 | $2.81196 |
| R-3 | Accessory Dwelling Unit Detached (Up to 1,200 sq. ft.) | 375 | $>1,264 | $1,264 | $0.95840 | $1,441 | $1.09257 | $1,644 | $1.24592 | $1,720 | $1.30342 | $1,846 | $1.39926 |
| R-3 | Accessory Dwelling Unit Detached (Up to 1,200 sq. ft.) | 750 | $1,624 | $1,624 | $0.12794 | $1,851 | $0.14585 | $2,111 | $0.16632 | $2,208 | $0.17400 | $2,371 | $0.18679 |
| R-3 | Accessory Dwelling Unit Detached (Up to 1,200 sq. ft.) | 1,200 | $1,681 | $1,681 | $1.40109 | $1,917 | $1.59725 | $2186 | $1,82142 | $2,287 | $1.90549 | $2,455 | $2.04560 |
| R-3 | Accessory Dwelling Unit Detached (Up to 1,200 sq. ft.) | - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - |
| R-3 | Tiny Homes and Efficiency Dwelling Units | 100 | $908 | $903 | $3.70232 | $1,033 | $1.72063 | $1,181 | $1.81302 | $1,235 | $5.03516 | $1,326 | $3.10337 |
| R-3 | Tiny Homes and Efficiency Dwelling Units | 200 | $1,279 | $1,279 | $1.81193 | $1,457 | $2.06560 | $1,662 | $2.35551 | $1,739 | $2,46423 | $1,867 | $2,64542 |
| R-3 | Tiny Homes and Efficiency Dwelling Units | 400 | $1,641 | $1,641 | $4.10223 | $1,871 | $4.67654 | $2,133 | $5.33290 | $2,232 | $5.57903 | $2,396 | $5.98926 |
| R-3 | Tiny Homes and Efficiency Dwelling Units | - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - |
| R-3 | Tiny Homes and Efficiency Dwelling Units | - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - |
| R-3 | Dwellings - Custom, Models, Single- and Two-Family, Lodging Houses | 500 | $1,255 | $1,255 | $1.08438 | $1,430 | $1.23619 | $1,631 | $1.40969 | $1,707 | $1.47475 | $1,832 | $1.58319 |
| R-3 | Dwellings - Custom, Models, Single- and Two-Family, Lodging Houses | 1,000 | 41,797 | $1,797 | $0.53544 | $2,049 | $0.61040 | $2,336 | $0.69607 | $2,444 | $0.72820 | $2,624 | $0.78174 |
| R-3 | Dwellings - Custom, Models, Single- and Two-Family, Lodging Houses | 2,000 | $2,332 | $2,332 | $0.07282 | $2,659 | $0.08302 | $3,032 | $0.09467 | $3,172 | $0.09904 | $3,405 | $0.10632 |
| R-3 | Dwellings - Custom, Models, Single- and Two-Family, Lodging Houses | 5,000 | $2,551 | $2,551 | $0.21208 | $2,908 | $0.24177 | $3,316 | $0.27570 | $3,469 | $0.28842 | $3,724 | $0.30963 |
| R-3 | Dwellings - Custom, Models, Single- and Two-Family, Lodging Houses | 10,000 | $3,611 | $3,611 | $0.36113 | $4,117 | $0.41168 | $1,693 | $0.46946 | $4,911 | $0.49113 | $5,272 | $0.52724 |
| R-3 | Dwellings - Production Phase - Tract | 300 | $803 | $303 | $0.53730 | $916 | $0.61232 | $1,044 | $0.69845 | $1,093 | $0.73072 | $1,173 | $0.78443 |
| R-3 | Dwellings - Production Phase - Tract | 1,000 | $1,072 | $1,072 | $0.30317 | $1,222 | $0.34561 | $1,394 | $0.39412 | $1,458 | $0.41231 | $1,565 | $0.44263 |
| R-3 | Dwellings - Production Phase - Tract | 2,000 | $1,375 | $1,375 | $0.04046 | $1,568 | $0.04613 | $1,788 | $0.05260 | $1,870 | $0.05503 | $2,003 | $0.05908 |
| R-3 | Dwellings - Production Phase - Tract | 5,000 | $1,497 | $1,497 | $0.14168 | $1,706 | $0.16151 | $1,946 | $0.18413 | $2,035 | $0.19268 | $2,185 | $0.20685 |
| R-3 | Dwellings - Production Phase - Tract | 10,000 | $2,205 | $2,205 | $0.22050 | $2,314 | $0.25137 | $2,867 | $0.28665 | $2,999 | $0.29988 | $3,219 | $0.32193 |
| R-3 | Accessory Junior Dwelling up to 500 Sq. Ft. | 38 | $728 | $728 | $7.14034 | $830 | $8.13998 | $946 | $9.28244 | $990 | $9.71086 | $1,063 | $10.42489 |
| R-3 | Accessory Junior Dwelling up to 500 Sq. Ft. | 75 | $996 | $996 | $3.83120 | $1,135 | $4.36757 | $1,294 | $4.98056 | $1,354 | $5.21044 | $1,454 | $5.39356 |
| R-3 | Accessory Junior Dwelling up to 500 Sq. Ft. | 150 | $1,283 | $1,283 | $0.49085 | $1,463 | $0.55957 | $1,668 | $0.63811 | $1,745 | $0.66756 | $1,873 | $0.71664 |
| R-3 | Accessory Junior Dwelling up to 500 Sq. Ft. | 375 | $1,393 | $1,393 | $1.49592 | $1,589 | $1.70535 | $1,811 | $1.94470 | $1,895 | $2.03445 | $2,034 | $2.18404 |
| R-4 | Large Family Day Care Home | 1,250 | $1,772 | $1,772 | $0.63784 | $2,021 | $.072714 | $2,304 | $0.82920 | $2,410 | $0.86747 | $2,551 | $0.93125 |
| R-4 | Large Family Day Care Home | 2,500 | $2,570 | $2,570 | $0.30229 | $2,929 | $0.34461 | $3,341 | $0.39297 | $3,495 | $0.41111 | $3,752 | $0.44134 |
| R-4 | Large Family Day Care Home | 5,000 | $3,325 | $3,325 | $0.03816 | $3,791 | $0.04351 | $4,323 | $0.04961 | $4,523 | $0.05190 | $4,855 | $0.05572 |
| R-4 | Large Family Day Care Home | 12,500 | $3,612 | $3,612 | $0.13929 | $4,117 | $0.15879 | $4,695 | $0.18108 | $4,912 | $0.18943 | $5,273 | $0.20336 |
| CONSTRUCTION TYPE and RATIO OF REQUIRED EFFORT | |||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| R-4 | Large Family Day Care Home | 25,000 | $5,353 | $5,353 | $0.21411 | $6,102 | $0.24409 | $6,959 | $0.27834 | $7,280 | $0.29119 | $7,315 | $0.31260 |
(NOTE: All fees include MFE inspections.)
| CONSTRUCTION TYPE and RATIO OF REQUIRED EFFORT | |||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Group A: V-A/ |
Group A: V-A/ |
Group B: III-A/ |
Group B: III-A/ |
Group C: IV | Group C: IV | Group D: II-A/ |
Group D: II-A/ |
Group E: I-A/ |
Group E: I-A/ |
||||
| Relative Effort | Relative Effort | Relative Effort | Relative Effort | Relative Effort | Relative Effort | Relative Effort | Relative Effort | Relative Effort | Relative Effort | ||||
| 1.00 | 1.00 | LH | LH | 1.30 | 1.30 | 136 | 136 | 1.46 | 1.46 | ||||
| ICC (UBC) Use Type | Occupancy | Size Basis (square feet) | Base Recommended Fee | Base Cost | Each Additional SF | Base Cost | Each Additional SF | Base Cost | Each Additional SF | Base Cost | Each Additional SF | Base Cost | Each Additional SF |
| A-1 | Motion Picture, Audience Theatre - Complete | 500 | $3,888 | $3,888 | $0.93948 | $4,433 | $1.09381 | $3,035 | $1.24733 | $5,284 | $1.30496 | $5,677 | $1.40085 |
| A-1 | Motion Picture, Audience Theatre - Complete | 1,500 | $4,848 | $4,848 | $0.43135 | $5,527 | $0.49174 | $6,302 | $0.56075 | $6,593 | $0.58663 | $7,078 | $0.62977 |
| A-1 | Motion Picture, Audience Theatre - Complete | 5,000 | $6,358 | $6,358 | $0.27697 | $7,248 | $0.31574 | $8,265 | $0.36006 | $8,646 | $0.37667 | $9,282 | $0.40437 |
| A-1 | Motion Picture, Audience Theatre - Complete | 10,000 | $7,742 | $7,742 | $0.15262 | $8,826 | $0.17399 | $10,065 | $0.19841 | $10,530 | $0.20757 | $11,304 | $0.22283 |
| A-1 | Motion Picture, Audience Theatre - Complete | 20,000 | $9,265 | $9,265 | $0.46343 | $10,566 | $0.52831 | $12,049 | $0.60246 | $12,605 | $0.63027 | $13,532 | $0.67661 |
| A-1 | Motion Picture, Audience Theatre - Tenant Improvements | 100 | $1,637 | $1,657 | 3 222509 | $1,889 | 3 233660 | 3 2,151 | $2.89262 | $2,233 | $1.02612 | $2,419 | $3.24863 |
| A-1 | Motion Picture, Audience Theatre - Tenant Improvements | 300 | $2,102 | $2,102 | $0.99686 | $2,396 | $1.13642 | $2,732 | $1.29591 | $2,859 | $1.35573 | $3,069 | $1.45541 |
| A-1 | Motion Picture, Audience Theatre - Tenant Improvements | 1,000 | $2,800 | $2,800 | $0.64762 | $3,192 | $0.73828 | $3,640 | $0.84190 | $3,808 | $0,88076 | $4,088 | $0.94552 |
| A-1 | Motion Picture, Audience Theatre - Tenant Improvements | 2,000 | $3,447 | $3,447 | $0.35029 | $3,930 | $0.39933 | $4,482 | $0.45537 | $4,688 | $0.47639 | $5,033 | $0.51142 |
| A-1 | Motion Picture, Audience Theatre - Tenant Improvements | 4,000 | $4,148 | $4,148 | $1.03697 | $4,729 | $1.18215 | $5,392 | $1.34806 | $5,641 | $1.41028 | $6,056 | $1.51398 |
| A-2 | Restaurant, Tavers, Bars (Intended for drink or consumption) - Complete | 500 | $3,701 | $3,701 | $1.10092 | $4,220 | $1.25505 | $4,312 | $1.43120 | $5,034 | $1.49725 | $3,404 | $1.60734 |
| A-2 | Restaurant, Tavers, Bars (Intended for drink or consumption) - Complete | 1,500 | $4,802 | $4,302 | $0.49296 | $5,475 | $0.56197 | $6,243 | $0.64084 | $6,531 | $0.67042 | $7,012 | $0.71972 |
| A-2 | Restaurant, Tavers, Bars (Intended for drink or consumption) - Complete | 5,000 | $6,528 | $6,528 | $0.31970 | $7,442 | $0.36446 | $8,486 | $0.41561 | $8,878 | $0.43479 | $9,531 | $0.46676 |
| A-2 | Restaurant, Tavers, Bars (Intended for drink or consumption) - Complete | 10,000 | $8,126 | $8,126 | $0.17346 | $9,264 | $0.19775 | $10,564 | $0.22550 | $11,052 | $0.23591 | $11,864 | $0.25326 |
| A-2 | Restaurant, Tavers, Bars (Intended for drink or consumption) - Complete | 20,000 | $9,861 | $9,361 | $0.49305 | $11,241 | $0.56207 | $12,819 | $0.64096 | $13,411 | $0.67054 | $14,397 | $0.71985 |
| A-2 | Restaurant, Tavers, Bars (Intended for drink or consumption) - Tenant Improvements | 100 | $1,549 | $1,549 | $2.12006 | $1,766 | $2.41686 | $2,014 | $2.75607 | $2,107 | $2.88328 | $2,262 | $3.09528 |
| A-2 | Restaurant, Tavers, Bars (Intended for drink or consumption) - Tenant Improvements | 300 | $1.973 | $1,973 | $0.95988 | $2,249 | $1.09426 | $2,565 | $1.14734 | $2,633 | $1.30543 | $2,881 | $1.40142 |
| A-2 | Restaurant, Tavers, Bars (Intended for drink or consumption) - Tenant Improvements | 1,000 | $2,645 | $2,645 | $0.60436 | $3,015 | $0.68897 | $3,439 | $0.78566 | $3,597 | $0.82192 | $3,862 | $0.88236 |
| A-2 | Restaurant, Tavers, Bars (Intended for drink or consumption) - Tenant Improvements | 2,000 | $3,249 | $3,249 | $0.34332 | $3,704 | $0.39139 | $4,224 | $0.44632 | $4,419 | $0.46692 | $4,744 | $0.50125 |
| A-2 | Restaurant, Tavers, Bars (Intended for drink or consumption) - Tenant Improvements | 4,000 | $3,936 | $3,936 | $0.98401 | $4,487 | $1.12177 | $5,117 | $1.27921 | $5,353 | $1.33825 | $5,747 | $1.43665 |
| A-3 | Church, Community Halls, Gymnasiums, Educational (worship, amusement) - Complete | 500 | $3,303 | $3,303 | $1.01816 | $3,993 | $1.16070 | $4,337 | $1.32360 | $4,764 | $1.38469 | $3,114 | $1.48651 |
| A-3 | Church, Community Halls, Gymnasiums, Educational (worship, amusement) - Complete | 1,500 | $4,521 | $4,521 | $0.45654 | $5,154 | $0.52046 | $5,877 | $0.59350 | $6,149 | $0.62090 | $6,601 | $0.66655 |
| A-3 | Church, Community Halls, Gymnasiums, Educational (worship, amusement) - Complete | 5,000 | $6,119 | $6,119 | $0.29517 | $6,976 | $0.33650 | $7,955 | $0.38372 | $8,322 | $0.40143 | $8,934 | $0.43095 |
| A-3 | Church, Community Halls, Gymnasiums, Educational (worship, amusement) - Complete | 10,000 | $7,595 | $7,595 | $0.16091 | $8,658 | $0.18344 | $9,873 | $0.20919 | $10,329 | $0.21884 | $11,088 | $0.23494 |
| CONSTRUCTION TYPE and RATIO OF REQUIRED EFFORT | |||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| A-3 | Church, Community Halls, Gymnasiums, Educational (worship, amusement) - Complete | 20,000 | $9,204 | $9,204 | $0.46020 | $10,492 | $0.52462 | $11,965 | $0.59826 | $12,517 | $0.62587 | $13,438 | $0.67189 |
| A-3 | Church, Community Halls, Gymnasiums, Educational (worship, amusement) Tenant Improvements | 100 | $1,531 | $1,531 | $2.09219 | $1,745 | $2.38509 | $1,990 | $2.71984 | $2,082 | $2.34337 | $2,235 | $3,03439 |
| A-3 | Church, Community Halls, Gymnasiums, Educational (worship, amusement) Tenant Improvements | 300 | $1,950 | $1,950 | $0.94502 | $2,222 | $1.07732 | $2,534 | $1.22853 | $2,651 | $1.28523 | $2,846 | $1.37973 |
| A-3 | Church, Community Halls, Gymnasiums, Educational (worship, amusement) Tenant Improvements | 1,000 | $2,611 | $2,611 | $0.59951 | $2,977 | $0.68344 | $3,394 | $0.77936 | $3,551 | $0.81533 | $3,812 | $0.87528 |
| A-3 | Church, Community Halls, Gymnasiums, Educational (worship, amusement) Tenant Improvements | 2,000 | $3,211 | $3,211 | $0.33658 | $3,660 | $0.38370 | $4,174 | $0.43755 | $4,366 | $0.45775 | $4,687 | $0.49140 |
| A-3 | Church, Community Halls, Gymnasiums, Educational (worship, amusement) Tenant Improvements | 4,000 | $3,884 | $3,884 | $0.97093 | $4,427 | $1.10686 | $5.049 | $1.26271 | $5,282 | $1.32047 | $5,670 | $1.41756 |
| A-4 | Arenas, Skating Rinks (indoor sporting events and activities) - Complete | 1,000 | $4,291 | $4,291 | $0.53471 | $4,392 | $0.60957 | $5,378 | $0.69513 | $3,336 | $0.72721 | $6,263 | $0.78065 |
| A-4 | Arenas, Skating Rinks (indoor sporting events and activities) - Complete | 3,000 | $5,360 | $5,360 | $0.24137 | $6,111 | $0.27516 | $6,969 | $0.31378 | $7,290 | $0.32826 | $7,826 | $0.35239 |
| A-4 | Arenas, Skating Rinks (indoor sporting events and activities) - Complete | 10,000 | $7,050 | $7,050 | $0.15280 | $8,037 | $0.17419 | $9,165 | $0.19864 | $9,588 | $0.20781 | $10,293 | $0.22309 |
| A-4 | Arenas, Skating Rinks (indoor sporting events and activities) - Complete | 20,000 | $8,578 | $8,578 | $0.08611 | $9,779 | $0.09816 | $11,151 | $0.11194 | $11,666 | $0.11711 | $12,524 | $0.12572 |
| A-4 | Arenas, Skating Rinks (indoor sporting events and activities) - Complete | 40,000 | $10,300 | $10,300 | $0.25730 | $11,742 | $0.29355 | $13,390 | $0.33476 | $14,008 | $0.35021 | $15,038 | $0.37596 |
| A-4 | Arenas, Skating Rinks (indoor sporting events and activities) - Tenant Improvements | 500 | $1,508 | $1,508 | $0.38349 | $1,720 | $0.44288 | $1,961 | $0.30301 | $2,052 | $0.52835 | $2,202 | $0.56719 |
| A-4 | Arenas, Skating Rinks (indoor sporting events and activities) - Tenant Improvements | 1,500 | $1,897 | $1,897 | $0.17635 | $2,163 | $0.20103 | $2,466 | $0.22925 | $2,580 | $0.23983 | $2,770 | $0.25747 |
| A-4 | Arenas, Skating Rinks (indoor sporting events and activities) - Tenant Improvements | 5,000 | $2,514 | $2,514 | $0.11034 | $2,866 | $0.12579 | $3,268 | $0.14345 | $3,419 | $0.15007 | $3,671 | $0.16110 |
| A-4 | Arenas, Skating Rinks (indoor sporting events and activities) - Tenant Improvements | 10,000 | $3,066 | $3,066 | $0.06328 | $3,495 | $0.07214 | $3,986 | $0.08226 | $4,170 | $0.08606 | $4,476 | $0.09239 |
| A-4 | Arenas, Skating Rinks (indoor sporting events and activities) - Tenant Improvements | 20,000 | $3,699 | $3,699 | $0.18493 | $4,216 | $0.21082 | $4,308 | $0.24041 | $5,030 | $0.25151 | $5,400 | $0.27000 |
| A-5 | Amusement Park Structures, Stadiums (outdoor activities) - Actual Time @ Staff Hourly Rates and/ |
- | $ - | $ - | $ - | $ - | S - | $ - | $ - | $ - | S - | $ - | $ - |
| A-5 | Amusement Park Structures, Stadiums (outdoor activities) - Actual Time @ Staff Hourly Rates and/ |
- | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - |
| A-5 | Amusement Park Structures, Stadiums (outdoor activities) - Actual Time @ Staff Hourly Rates and/ |
- | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - |
| A-5 | Amusement Park Structures, Stadiums (outdoor activities) - Actual Time @ Staff Hourly Rates and/ |
- | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - |
| A-5 | Amusement Park Structures, Stadiums (outdoor activities) - Actual Time @ Staff Hourly Rates and/ |
- | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - |
| A-5 | Amusement Park Structures, Stadiums (outdoor activities) Tenant Improvements - Actual Time @ Staff Hourly Rates and/ |
- | $ - | $ - | $ - | $ - | S - | $ - | $ - | $ - | S - | $ - | $ - |
| A-5 | Amusement Park Structures, Stadiums (outdoor activities) Tenant Improvements - Actual Time @ Staff Hourly Rates and/ |
- | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - |
| A-5 | Amusement Park Structures, Stadiums (outdoor activities) Tenant Improvements - Actual Time @ Staff Hourly Rates and/ |
- | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - |
| A-5 | Amusement Park Structures, Stadiums (outdoor activities) Tenant Improvements - Actual Time @ Staff Hourly Rates and/ |
- | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - |
| CONSTRUCTION TYPE and RATIO OF REQUIRED EFFORT | |||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| A-5 | Amusement Park Structures, Stadiums (outdoor activities) Tenant Improvements - Actual Time @ Staff Hourly Rates and/ |
- | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - |
| B | Professional Offices/ |
500 | $3,269 | $3,269 | $0.99982 | $5,757 | $1.13980 | $4,250 | $1.29977 | $4,446 | $1.35976 | $4,773 | $1.45974 |
| B | Professional Offices/ |
1,500 | $4,269 | $4,269 | $0.44951 | $4,867 | $0.51244 | $5,550 | $0.58436 | $5,806 | $0.61134 | $6,233 | $0.65629 |
| B | Professional Offices/ |
5,000 | $5,842 | $5,842 | $0.28838 | $6,660 | $0.32875 | $7,595 | $0.37489 | $7,945 | $0.39219 | $8,530 | $0.42103 |
| B | Professional Offices/ |
10,000 | $7,284 | $7,284 | $0.15914 | $8,304 | $0.18142 | $9,469 | $0.20688 | $9,906 | $0.21643 | $10,635 | $0.23235 |
| B | Professional Offices/ |
20,000 | $8,876 | $8,876 | $0.44378 | $10,118 | $0.50391 | $11,538 | $0.57691 | $12,071 | $0.60354 | $12,958 | $0.64791 |
| B | Professional Offices/ |
50 | $1,102 | $1,102 | $2.67300 | $1,256 | $3.04722 | $1,432 | $3.47490 | $1,498 | $3.63528 | $1,609 | $3.90258 |
| B | Professional Offices/ |
150 | $1,369 | $1,369 | $1.18768 | $1,561 | $1.35396 | $1,780 | $1.54398 | $1,862 | $1.61524 | $1,999 | $1.73401 |
| B | Professional Offices/ |
500 | $1,785 | $1,785 | $0.80018 | $2,035 | $0.91220 | $2,320 | $1.04023 | $2,427 | $1.08824 | $2,606 | $1.16826 |
| B | Professional Offices/ |
1,000 | $2,185 | $2,185 | $0.40773 | $2,491 | $0.46481 | $2,840 | $0.53005 | $2,971 | $0.55452 | $3,190 | $0.59529 |
| B | Professional Offices/ |
2,000 | $2,393 | $2,593 | $1.29632 | $2,956 | $1.47780 | $3,370 | $1.68521 | $3,526 | $1.76299 | $3,785 | $1.89262 |
| E | Educational through 12th Grade, Day Care Facilities - Complete | 300 | $2,772 | $2,772 | $1.35422 | $3,160 | $1.54382 | $3,603 | $1.76049 | $3,770 | $1.84174 | $4,047 | $1.97717 |
| E | Educational through 12th Grade, Day Care Facilities - Complete | 900 | $3,584 | $3,584 | $0.61029 | $4,086 | $0.69573 | $4,660 | $0.79337 | $4,875 | $0.82999 | $5,233 | $0.89102 |
| E | Educational through 12th Grade, Day Care Facilities - Complete | 3,000 | $4,866 | $4,866 | $0.39016 | $5,547 | $0.44479 | $6,326 | 0.50721 | $6,618 | $0.53062 | $7,104 | $0.56964 |
| E | Educational through 12th Grade, Day Care Facilities - Complete | 6,000 | $6,036 | $6,036 | $0.21639 | $6,382 | $0.24669 | $7,847 | $0.28131 | $8,210 | $0.29429 | $8,813 | $0.31593 |
| E | Educational through 12th Grade, Day Care Facilities - Complete | 12,000 | $7,335 | $7,333 | $0.61123 | $8,362 | $0.69681 | $9,535 | $0.79461 | $9,975 | $0.83128 | $10,709 | $0.89240 |
| E | Educational through 12th Grade, Day Care Facilities - Tenant Improvements | 100 | 1,479 | $1,479 | $1.94802 | $1,686 | $2.22074 | $1,923 | $2.53243 | 2,012 | $2.64931 | 2,139 | $2.84411 |
| E | Educational through 12th Grade, Day Care Facilities - Tenant Improvements | 300 | $1,869 | $1,869 | $0.88470 | $2,130 | $1.00856 | $2,429 | $1.15011 | $2,541 | $1.20320 | $1,728 | $1.29167 |
| E | Educational through 12th Grade, Day Care Facilities - Tenant Improvements | 1,000 | $2,488 | $2,488 | $0.55269 | $2,836 | $0.63007 | $3,234 | $0.71850 | $3,384 | $0.75166 | $3,632 | $0.80693 |
| E | Educational through 12th Grade, Day Care Facilities - Tenant Improvements | 2,000 | $3,041 | $3,041 | $0.31774 | $3,466 | $0.36222 | $1,953 | $0.41306 | $4,135 | $0.43212 | $4,439 | $0.46350 |
| E | Educational through 12th Grade, Day Care Facilities - Tenant Improvements | 4,000 | $3,676 | $3,676 | $0.91903 | $4,191 | $1.04770 | $4,779 | $1.19474 | $5,000 | $1.24988 | $5,367 | $1.34179 |
| F-1 | Moderate Hazard Factory - Complete | 300 | $2,126 | $1,126 | $0.30367 | $2,424 | $0.57419 | $2,761 | $0.63478 | $2,892 | $0.68500 | $3,104 | 0.72336 |
| F-1 | Moderate Hazard Factory - Complete | 1,500 | $2,630 | $2,630 | $0.23027 | $2,998 | $0.26251 | $3,419 | $0.29935 | $3,577 | $0.31317 | $3,840 | $0.33620 |
| F-1 | Moderate Hazard Factory - Complete | 5,000 | $3,436 | $3,436 | $0.14256 | $3,917 | $0.16252 | $4,467 | $0.18533 | $4,673 | $0.19389 | $5,016 | $0.20814 |
| F-1 | Moderate Hazard Factory - Complete | 10,000 | $4,149 | $4,149 | $0.08300 | $4.729 | $0.09462 | $5,393 | $0.10790 | $5,642 | $0.11288 | $6,057 | $0.12118 |
| F-1 | Moderate Hazard Factory - Complete | 20,000 | $4,979 | $4,979 | $0.24893 | $5,676 | $0.28378 | $6,472 | $0.32361 | $6,771 | $0.33855 | $7,269 | $.036344 |
| F-1 | Moderate Hazard Factory - Tenant Improvements | 100 | $1,075 | $1,075 | $1.29210 | $1,226 | $1.47299 | $1,393 | $1.67973 | $1,463 | $1,75725 | $1,370 | $1.88646 |
| F-1 | Moderate Hazard Factory - Tenant Improvements | 300 | $1,334 | $1,334 | $0.57430 | $1,321 | $0.63471 | $1,734 | $0.74659 | $1,814 | 0.78105 | $1,947 | $0.83848 |
| F-1 | Moderate Hazard Factory - Tenant Improvements | 1,000 | $1,736 | $1,736 | $0.38693 | $1,979 | $0.44110 | $2,257 | $0.50301 | $2,361 | $0.52622 | $2,534 | $0.56492 |
| CONSTRUCTION TYPE and RATIO OF REQUIRED EFFORT | |||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| F-1 | Moderate Hazard Factory - Tenant Improvements | 2,000 | $2,123 | $2,123 | $0.19713 | $2,420 | $0.22473 | $2,760 | $0.25627 | $2,887 | $0.26810 | $3,099 | $0.28781 |
| F-1 | Moderate Hazard Factory - Tenant Improvements | 4,000 | $2,517 | $2,517 | $0.62926 | $2,869 | $0.71736 | $3,272 | $0.81804 | $3,423 | $0.85579 | $3,675 | $0.91872 |
| F-1 | Electric Generation Plants - Geothermal - Structures - Complete | 300 | $3,471 | $3,471 | $1.27016 | $3,957 | 1.44798 | $4,513 | $1.63120 | $4,721 | 1.72141 | $5,048 | $1.85443 |
| F-1 | Electric Generation Plants - Geothermal - Structures - Complete | 900 | $4,233 | $4,233 | $0.57330 | $4,326 | $0.65356 | $3,503 | $0.74578 | $5,757 | $0.77968 | $6,181 | $0.83702 |
| F-1 | Electric Generation Plants - Geothermal - Structures - Complete | 3,000 | $5,437 | $5,437 | $0.36525 | $6,198 | $0.41638 | $7,068 | $0.47482 | $7,395 | $0.49674 | $7,938 | $0.53326 |
| F-1 | Electric Generation Plants - Geothermal - Structures - Complete | 6,000 | $6,533 | $6,533 | $0.20365 | $7,448 | $0.23216 | $8,493 | $0.26474 | $8,885 | $0.37696 | $9,558 | $0.29732 |
| F-1 | Electric Generation Plants - Geothermal - Structures - Complete | 12,000 | $7,755 | $1,755 | $0.64624 | $8,341 | $0.73671 | $10,081 | $0.34011 | $10,347 | $0.37888 | $11,322 | $0.94351 |
| F-1 | Electric Generation Plants - Geothermal - Structural - Tenant Improvements | 50 | $2,217 | $2,217 | $3.62963 | $2,527 | $4.13778 | $2,882 | $4.71852 | $3,015 | $4.93630 | $3,131 | $1.29926 |
| F-1 | Electric Generation Plants - Geothermal - Structural - Tenant Improvements | 150 | $2,580 | $2,580 | $1.65218 | $2.941 | $1.88349 | $3,354 | $2.14784 | $3,509 | $2.24697 | $3,767 | $2.41219 |
| F-1 | Electric Generation Plants - Geothermal - Structural - Tenant Improvements | 500 | $3,158 | $3,158 | $1.02642 | $3,600 | $1.17012 | $4,106 | $1.33435 | $4,295 | $1.39594 | $4,611 | $1.49858 |
| F-1 | Electric Generation Plants - Geothermal - Structural - Tenant Improvements | 1,000 | $3,671 | $3,671 | $0.59508 | $4,185 | $0.67839 | $4,773 | $0.77360 | $4,993 | $0.80931 | $5,360 | $0.86881 |
| F-1 | Electric Generation Plants - Geothermal - Structural - Tenant Improvements | 2,000 | $4,266 | $4,266 | $2.13323 | $4,864 | $2.43190 | $5,546 | $2.77322 | $5,802 | $5.290121 | $6,229 | $3.11454 |
| S-1 or F-1 | Battery Energy Storage System - Industrial (non-portable) - Complete | 100 | $1,650 | $1,650 | $1.19832 | $1,811 | $1.36631 | $2,143 | $1.55807 | $2,244 | $1.62998 | $2,409 | $1.74983 |
| S-1 or F-1 | Battery Energy Storage System - Industrial (non-portable) - Complete | 300 | $1,890 | $1,890 | $0.55492 | $2,154 | $0.63261 | $2,457 | $0.72140 | $2,570 | $0.75469 | $2,759 | $0.81018 |
| S-1 or F-1 | Battery Energy Storage System - Industrial (non-portable) - Complete | 1,000 | $2,278 | $2,278 | $0.33056 | $2,597 | $0.37684 | $2,962 | $0.42973 | $3,098 | $0.44957 | $3,326 | $0.48262 |
| S-1 or F-1 | Battery Energy Storage System - Industrial (non-portable) - Complete | 2,000 | $2,609 | $2,609 | $0.20409 | $2,974 | $0.23266 | $3,391 | $0.26531 | $3,548 | $0.27756 | $1,305 | $.028796 |
| S-1 or F-1 | Battery Energy Storage System - Industrial (non-portable) - Complete | 4,000 | $3,017 | $3,017 | $0.75424 | $3,439 | $0.33983 | $3,922 | $0.98051 | $4,103 | $1,02576 | $4,405 | $1.10118 |
| S-1 of F-1 | Battery Energy Storage System - Commercial (non-portable) - Complete | 50 | $1,434 | $1,434 | $1.67594 | $1,635 | $1.91058 | $1,864 | $2.17873 | $1,950 | $2.27928 | $2,094 | $2.44088 |
| S-1 of F-1 | Battery Energy Storage System - Commercial (non-portable) - Complete | 150 | $1,602 | $1,602 | $0.79256 | $1,826 | $0.90332 | $2,082 | $1.03035 | $1,178 | $1.07788 | $2,333 | $1.15714 |
| S-1 of F-1 | Battery Energy Storage System - Commercial (non-portable) - Complete | 500 | $1,879 | $1,879 | $0.44742 | $2,142 | $0.51006 | $2,443 | $0.58165 | $2,555 | $0.60849 | $2,743 | $0.65324 |
| S-1 of F-1 | Battery Energy Storage System - Commercial (non-portable) - Complete | 1,000 | $2,103 | $2,103 | $0.29883 | $2,397 | $0.34066 | $2,734 | $0.38848 | $2,860 | $0.40641 | $3,070 | $0.43629 |
| S-1 of F-1 | Battery Energy Storage System - Commercial (non-portable) - Complete | 2,000 | $2,402 | $2,402 | $1.20076 | $2,738 | $1.36887 | $3,122 | $1.36099 | $3,266 | $1.63304 | $3,506 | $1.75312 |
| S-1 | Battery Energy Storage System - Residential (non-portable) - Complete | 25 | $1,548 | $1,548 | $ - | $1,765 | $ - | $2,012 | $ - | 2,105 | $ - | $2,260 | $ - |
| S-1 | Battery Energy Storage System - Residential (non-portable) - Complete | 50 | $1,548 | $1,548 | $1.89964 | $1,765 | $2.16559 | $2,012 | $2.46953 | $2,105 | $2.58351 | $2,260 | $2.77347 |
| S-1 | Battery Energy Storage System - Residential (non-portable) - Complete | 100 | $1,643 | $1,643 | $3.53837 | $1,873 | $4.03374 | $2,136 | $4.59988 | $2,234 | $4.81218 | $2,399 | $5.16601 |
| S-1 | Battery Energy Storage System - Residential (non-portable) - Complete | 250 | $2,174 | $2,174 | $2.81011 | $2,478 | $3,20352 | $2,826 | $3.65314 | $2,956 | $3.82175 | $3,174 | $4.10276 |
| S-1 | Battery Energy Storage System - Residential (non-portable) - Complete | 500 | $2,876 | $2,876 | 3.73236 | $3,279 | $6.55791 | 3,739 | $7.47832 | $3,912 | $7,82348 | $4,199 | 8.39873 |
| CONSTRUCTION TYPE and RATIO OF REQUIRED EFFORT | |||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| S-1 | Battery Energy Storage System - Residential - Portable | 40 | $1,597 | $1,397 | $ - | $1,821 | $ - | $2,076 | $ - | $2,172 | $ - | $2,332 | $ - |
| S-1 | Battery Energy Storage System - Residential - Portable | 80 | $1,597 | $1,597 | $1.26296 | $1,821 | $1.43978 | $2,076 | $1.64185 | $2,172 | $1.71763 | $2,332 | $1.84392 |
| S-1 | Battery Energy Storage System - Residential - Portable | 160 | $1,698 | $1,698 | $2.37688 | $1,936 | $2.70965 | $2,207 | $3.08905 | $2,309 | $3.23256 | $2,479 | $3.47025 |
| S-1 | Battery Energy Storage System - Residential - Portable | 400 | $2,269 | $2,269 | $1.90552 | $2,586 | $2.17229 | $2,949 | $2.47718 | $3,085 | $2,59151 | $3,312 | $2.78206 |
| S-1 | Battery Energy Storage System - Residential - Portable | 800 | $3,031 | $3,031 | $3.78840 | $3,435 | $4.31878 | $3,940 | $4.92492 | $4,122 | $5.15223 | $4,425 | $5.33107 |
| S-1 | Battery Storage - Industrial/ |
32 | $1,223 | $1,223 | $1.98038 | $1,394 | $2.25764 | $1,390 | $2.57450 | 1,663 | $2.69332 | 1,786 | $2.89136 |
| S-1 | Battery Storage - Industrial/ |
96 | $1,350 | $1,350 | $0.95753 | $1,539 | $1.09159 | $1,755 | $1.24479 | $1,836 | $1.30225 | $1,971 | $1.39800 |
| S-1 | Battery Storage - Industrial/ |
320 | $1,564 | $1,564 | $0.50994 | $1,783 | $0.58133 | $2,034 | $0.66292 | $2,128 | $0.69351 | $2,284 | $0.74451 |
| S-1 | Battery Storage - Industrial/ |
640 | $1,728 | $1,728 | 0.37013 | $1,969 | $0.42195 | $2,246 | $0.48117 | $2,349 | $0.50338 | $2,522 | $0.54039 |
| S-1 | Battery Storage - Industrial/ |
1,280 | $1,964 | $1,964 | $1.53472 | $2,239 | $1.74958 | 2,554 | $1.99514 | $2,672 | $2.08722 | $2,868 | $2.24069 |
| S-1 | Battery Storage - Upgrade | 40 | $1,061 | $1,061 | $0.90940 | $1,210 | 1.03671 | $1,380 | $1.18221 | $1,443 | 1.23678 | $1,550 | $1.32772 |
| S-1 | Battery Storage - Upgrade | 120 | $1,134 | $1,134 | $0.46907 | $1,293 | $0.53474 | $1,474 | $0.60979 | $1,542 | $0.63793 | $1,656 | $0,63434 |
| S-1 | Battery Storage - Upgrade | 400 | $1,265 | $1,265 | $0.20793 | $1,443 | $0.23704 | $1,645 | $0.27031 | $1,721 | $0.28278 | $1,848 | $0.30358 |
| S-1 | Battery Storage - Upgrade | 800 | $1,349 | $1,349 | $0.19376 | $1,537 | $0.22089 | $1,753 | $0.25189 | $1,834 | $0.26352 | $1,969 | $0.28290 |
| S-1 | Battery Storage - Upgrade | 1,600 | $1,504 | $1,504 | $0.93977 | $1,714 | $1.07134 | $1,955 | $1.22171 | $2,045 | $1.27809 | $2,195 | 1.37207 |
| F-2 | Gypsum, Glass (Low Hazard Factory) - Complete | 500 | $2,111 | $2,111 | $0.44925 | $2,407 | $0.51218 | $2,744 | $0.58106 | $2,871 | $0.61102 | $3,032 | 0.63394 |
| F-2 | Gypsum, Glass (Low Hazard Factory) - Complete | 1,500 | $2,560 | $2,560 | $0.20623 | $2,919 | $0.23511 | $3,328 | $0.26810 | $3,482 | $0.28048 | $3,738 | $0.30110 |
| F-2 | Gypsum, Glass (Low Hazard Factory) - Complete | 5,000 | $3,282 | $3,282 | $0.12658 | $3,742 | $0.14430 | $4,267 | $0.16455 | $4,464 | $0.17215 | $4,792 | $0.18480 |
| F-2 | Gypsum, Glass (Low Hazard Factory) - Complete | 10,000 | $3,915 | $3,915 | $0.07465 | $4,463 | $0.08510 | $5,090 | $0.09705 | $5,324 | $0.10153 | $5,716 | $0.10599 |
| F-2 | Gypsum, Glass (Low Hazard Factory) - Complete | 20,000 | $4,662 | $4,662 | $0.13308 | $5,314 | $0.26371 | $6,060 | $0.30300 | $6,345 | $0.31699 | $6,806 | $0.34030 |
| F-2 | Gypsum, Glass (Low Hazard Factory) - Tenant Improvements | 100 | $1,376 | $1,376 | $1.38090 | $1,565 | $1.37423 | $1,788 | $1.79517 | $1,871 | $1.87803 | $2,008 | $2.01612 |
| F-2 | Gypsum, Glass (Low Hazard Factory) - Tenant Improvements | 300 | $1,652 | $1,652 | $0.61338 | $1,883 | $0.69925 | $2,147 | $0.79739 | $2,246 | $0.83419 | $2,412 | $0.89553 |
| F-2 | Gypsum, Glass (Low Hazard Factory) - Tenant Improvements | 1,000 | $2,081 | $2,081 | $0.41325 | $2,373 | $0.47110 | $2,705 | $0.53722 | $2,830 | $0.56202 | $3,038 | $0.60334 |
| F-2 | Gypsum, Glass (Low Hazard Factory) - Tenant Improvements | 2,000 | $2,494 | $2,494 | 0.21060 | $2,844 | $0.24008 | $3,243 | $0.27378 | $3,392 | $0.28641 | $3.642 | $0.30747 |
| F-2 | Gypsum, Glass (Low Hazard Factory) - Tenant Improvements | 4,000 | $2,916 | $2,916 | $0.72850 | $3,324 | $0.83094 | $3,790 | $0.94757 | $3,965 | $0.99130 | $4,257 | $1.06419 |
| H-1 | Detonation Hazards - Complete | 500 | $2,407 | $2,407 | 0.54808 | $2,744 | $0.62481 | $3,130 | $0.71250 | $3,274 | $0.74338 | $3,515 | $0.80019 |
| H-1 | Detonation Hazards - Complete | 1,500 | 2,955 | $2,955 | $0.24981 | $3,369 | $0.28478 | $3,842 | $0.32475 | $4,019 | $0.33974 | $4,315 | $0.36472 |
| H-1 | Detonation Hazards - Complete | 5,000 | $3,830 | $3,830 | 0.15572 | $4,366 | $0.17752 | $4,979 | $0.20244 | $5,209 | $0.21178 | $5,591 | $0.22735 |
| H-1 | Detonation Hazards - Complete | 10,000 | $4,608 | $4,608 | 0.08973 | $5,254 | $0.10230 | $5,991 | $0.11665 | $6,267 | $0.12204 | $6,728 | $0.13101 |
| H-1 | Detonation Hazards - Complete | 20,000 | $5,506 | $5,506 | $0.27529 | $6.277 | $0.31383 | $7,157 | $0.33787 | $7,488 | $0.37439 | $8,038 | $0.40192 |
| H-2 | Deflagration or Accelerated Burning - Complete | 500 | $2,044 | $2,044 | 0.54250 | $2,330 | $0.61543 | $2,657 | $0.70525 | $2,779 | $0.73780 | $2,981 | $0.79205 |
| H-2 | Deflagration or Accelerated Burning - Complete | 1,500 | $2,586 | $2,586 | $0.24684 | $2,948 | $0.28140 | $3,362 | $0.32089 | $3,517 | $0.33570 | $3.776 | $0.36038 |
| CONSTRUCTION TYPE and RATIO OF REQUIRED EFFORT | |||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| H-2 | Deflagration or Accelerated Burning - Complete | 5,000 | $3,450 | $3,450 | $0.15475 | $3,933 | $0.17642 | $4,485 | $0.20118 | $4,692 | $0.21046 | $5,037 | $0.22594 |
| H-2 | Deflagration or Accelerated Burning - Complete | 10,000 | $4,224 | $4,224 | $0.08839 | $4,815 | $1.0076 | $5,491 | $0.11490 | $5,744 | $0.12020 | $6,167 | $0.12904 |
| H-2 | Deflagration or Accelerated Burning - Complete | 20,000 | $5,108 | $5,108 | $0.25538 | $5,823 | $0.29114 | $6,640 | $0.33200 | $6,946 | 0.34732 | $7,457 | $0.37286 |
| H-3 | Combustibles and Flammables - Complete | 500 | $2,107 | $2,107 | $0.54696 | $2,402 | $0.62354 | $2,740 | $0.71105 | $2,866 | $0.74387 | $1,077 | $0.79856 |
| H-3 | Combustibles and Flammables - Complete | 1,500 | $2,654 | $2,654 | $0.24922 | $3,026 | $0.28411 | $3,451 | $0.32398 | $3,610 | $0.33893 | $3,875 | $0.36385 |
| H-3 | Combustibles and Flammables - Complete | 5,000 | $3,527 | $3,527 | $0.15553 | $4,020 | $0.17730 | $4,585 | $0.20219 | $4,796 | $0.21152 | $5,149 | $0.22707 |
| H-3 | Combustibles and Flammables - Complete | 10,000 | $4,304 | $4,304 | $0.08946 | $4,907 | $0.10199 | $5,596 | $0.11630 | $5,854 | $0.12167 | $6,284 | $0.13062 |
| H-3 | Combustibles and Flammables - Complete | 20,000 | $5,199 | 5,199 | $0.25995 | $5,927 | $029634 | $6,739 | $0.33793 | $7,071 | $0.35353 | $7,590 | $0.37952 |
| H-4 | Corrosives and Toxic Materials (Health Hazard) - Complete | 300 | $2,095 | $2,095 | $0.54808 | $2,388 | $0.62481 | $2,723 | $0.71250 | $1,849 | $0.74538 | $3,058 | $0.80019 |
| H-4 | Corrosives and Toxic Materials (Health Hazard) - Complete | 1,500 | $2,643 | $2,643 | $0.24981 | $3,013 | $0.28478 | $3,435 | $0.32475 | $3,594 | $0.33974 | $3,858 | $0.36472 |
| H-4 | Corrosives and Toxic Materials (Health Hazard) - Complete | 5,000 | $3,517 | $3,517 | $0.15572 | $4,009 | $0.17752 | $4,572 | $0.20244 | $4,783 | $0.21178 | $5,135 | $0.22735 |
| H-4 | Corrosives and Toxic Materials (Health Hazard) - Complete | 10,000 | $4,296 | $4,296 | $0.08973 | $4,897 | $0.10230 | $5,584 | $0.11665 | $5,842 | $0.12204 | $6,272 | $0.13101 |
| H-4 | Corrosives and Toxic Materials (Health Hazard) - Complete | 20,000 | $3,193 | $3,193 | $0.25965 | $5,920 | $0.29600 | $6,751 | $0.33754 | $7,062 | $0.35312 | $7,582 | $0.37909 |
| H-5 | Semiconductor Fabrication Facilities, Compatible Research and Development Areas - Complete | 500 | $2,045 | $2,045 | $0.54808 | $2,332 | $0.62481 | $2,659 | $0.71250 | $2,781 | $0.74538 | $2,986 | $0.30019 |
| H-5 | Semiconductor Fabrication Facilities, Compatible Research and Development Areas - Complete | 1,500 | $2,593 | $2,593 | $0.24981 | $2,956 | $0.28478 | $3.371 | $0.32475 | $3,527 | $0.33974 | $3,786 | $0.36472 |
| H-5 | Semiconductor Fabrication Facilities, Compatible Research and Development Areas - Complete | 5,000 | $3,468 | $3,468 | $0.15572 | $3,953 | $0.17752 | $4,508 | $0.20244 | $4,716 | $0.21178 | $5,063 | $0.22735 |
| H-5 | Semiconductor Fabrication Facilities, Compatible Research and Development Areas - Complete | 10,000 | $4,246 | $4,246 | $0.08973 | $4,841 | $0.10230 | $5,520 | $0.11665 | $5,775 | $0.12204 | $6,200 | $0.13101 |
| H-5 | Semiconductor Fabrication Facilities, Compatible Research and Development Areas - Complete | 20,000 | $5,144 | $5,144 | $0.23718 | $5,864 | $0.29318 | $6,687 | $0.33433 | $6,995 | $0,34976 | $7,510 | $0.37548 |
| H | Hazardous Tenant Improvements | 100 | $1,211 | $1,211 | $1.38090 | $1,380 | $1.57423 | $1,574 | $1.79517 | $1,647 | $1.37803 | $1,765 | $2.01612 |
| H | Hazardous Tenant Improvements | 300 | $1,487 | $1,487 | $0.61338 | $1,695 | $0.69925 | $1,933 | $0.79739 | $2,022 | $0.83419 | $2,171 | $0.89553 |
| H | Hazardous Tenant Improvements | 1,000 | $1,916 | $1,916 | $0.41325 | $2,185 | $0.47110 | $2,491 | $0.53722 | $2,606 | $0,56202 | $2,798 | $0.60334 |
| H | Hazardous Tenant Improvements | 2,000 | $2,330 | $2,330 | $0.21060 | $2,656 | $0.24008 | $3,028 | $0.27378 | $3,168 | $0.28641 | $3,401 | $0.30747 |
| H | Hazardous Tenant Improvements | 4,000 | $2,751 | $2,751 | $0.68770 | $3,136 | $0.78398 | $3,576 | $0.89401 | $3,741 | $0.93528 | $4,016 | $1.00405 |
| I-2 | Institutional Group (Medical Care on a 24-hr Basis 5+ Person - Complete | 2,000 | $22,341 | $22,341 | $1.75423 | $25,469 | $1.99983 | $29,043 | $2.28050 | $30,384 | $2.38576 | $32,618 | $2.56118 |
| I-2 | Institutional Group (Medical Care on a 24-hr Basis 5+ Person - Complete | 6,000 | $29,358 | $29,358 | $0.77653 | $33,468 | $0.38524 | $38,165 | $1.00949 | $39,927 | $1.05608 | $42,863 | $1.13373 |
| I-2 | Institutional Group (Medical Care on a 24-hr Basis 5+ Person - Complete | 20,000 | $40,229 | $40,229 | $0.51725 | $45,862 | $0.58967 | $52,298 | $0.67243 | $54,712 | $0.70346 | $58,735 | $0.75519 |
| I-2 | Institutional Group (Medical Care on a 24-hr Basis 5+ Person - Complete | 40,000 | $50,575 | $50,575 | $0.26921 | $57,655 | $0.30690 | $65,747 | $0.34997 | $68,781 | $0.36612 | $73,839 | $0.39304 |
| I-2 | Institutional Group (Medical Care on a 24-hr Basis 5+ Person - Complete | 80,000 | $61,343 | $61,343 | $0.76679 | $69,931 | $0.87414 | $79,746 | $0.99682 | $83,426 | $1.04283 | $89,561 | $1.11951 |
| I-3 | Institutional Restraint and Security - Complete | 6,000 | $67,886 | $67,886 | $1.82008 | $77,390 | $2.07489 | $88,232 | $2.36611 | $92,325 | $2.47531 | $99,114 | $2.65732 |
| CONSTRUCTION TYPE and RATIO OF REQUIRED EFFORT | |||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| I-3 | Institutional Restraint and Security - Complete | 18,000 | $89,727 | $89,727 | $0.80346 | $102,289 | $0.91594 | $116,645 | $1.04450 | $122,029 | $1,09271 | $131,002 | $1.17305 |
| I-3 | Institutional Restraint and Security - Complete | 60,000 | $123,472 | $123,472 | $0.53770 | $140,759 | $0,61298 | $160,514 | $0.69901 | $167,923 | $0.73128 | $180,270 | $0.78505 |
| I-3 | Institutional Restraint and Security - Complete | 120,000 | $155,735 | $155,735 | $0.27787 | $177,538 | $0.31678 | $202,455 | $0.36124 | $211,799 | $0.37791 | $227,373 | $0.40570 |
| I-3 | Institutional Restraint and Security - Complete | 240,000 | $189,079 | $189,079 | $0.78783 | $215,551 | $0.89813 | $245,803 | $1.02418 | $237,148 | $1.07145 | $276,056 | $1.15023 |
| I-4 | Institutional Daycare Facilities | 500 | $6,790 | $6,790 | $1.85192 | $7,740 | $2.1119 | $8,827 | $240,750 | $9,234 | $2.51862 | $9,913 | $2.70381 |
| I-4 | Institutional Daycare Facilities | 1,500 | $8,642 | $8,642 | $0.82970 | $9,851 | $0.94585 | $11,234 | $1.07861 | $11,753 | $1.12839 | $12,617 | $1.21136 |
| I-4 | Institutional Daycare Facilities | 5,000 | $11,545 | $11,545 | $0.54330 | $13,162 | $0.61936 | $15,009 | $0.70629 | $15,702 | $0.73888 | $16,856 | $0.79321 |
| I-4 | Institutional Daycare Facilities | 10,000 | $14,262 | $14,262 | $0.28992 | $16,259 | $0.33051 | $18,541 | $0.37690 | $19,396 | $0.39429 | $20,822 | $0.42329 |
| I-4 | Institutional Daycare Facilities | 20,000 | $17,161 | $17,161 | $0.85806 | $19,564 | $0.97819 | $22,310 | $1.11543 | $23,339 | $1.16696 | $25,055 | $1.25277 |
| L | Laboratories Group L - Complete | 300 | $1,744 | $1,744 | $0.74961 | $1,989 | $0.85455 | $2,268 | $0.97449 | $2,372 | $1.01947 | $2,347 | $1.09443 |
| L | Laboratories Group L - Complete | 900 | $2,194 | $2,194 | $0.34002 | $2,501 | $0.38763 | $2,852 | $0.44203 | $2,984 | $0.46243 | $3,203 | $0.49644 |
| L | Laboratories Group L - Complete | 3,000 | $2,908 | $2,908 | $0.21654 | $3,315 | $0,24685 | $3,781 | $0.28150 | $3,955 | $0.29449 | $4,246 | $0.31614 |
| L | Laboratories Group L - Complete | 6,000 | $3,358 | $3,558 | $0.12061 | $4,056 | $0.13749 | $4,625 | $0.15679 | $4,839 | $0.16403 | $5,194 | $0.17609 |
| L | Laboratories Group L - Complete | 12,000 | $4,281 | $4,281 | $0.35679 | $4,881 | $0.40674 | $5,366 | $0.46382 | $5,823 | $0.48523 | $6,251 | $0.52091 |
| L | Laboratories Group L - Tenant Improvements | 100 | $1,211 | $1,211 | $1.38090 | $1,380 | $1.57423 | $1,574 | $1.97517 | $1,647 | $1.37803 | $1,768 | $2.01612 |
| L | Laboratories Group L - Tenant Improvements | 300 | $1,487 | $1,487 | $0.61338 | $1,695 | $0.69925 | $1,933 | $0.79739 | $2,022 | $0.83419 | $2,171 | $0.89553 |
| L | Laboratories Group L - Tenant Improvements | 1,000 | $1,916 | $1,916 | $0.41325 | $2,185 | $0.47110 | $2,491 | $0.53722 | $2,606 | $0.56202 | $2,798 | $0.60334 |
| L | Laboratories Group L - Tenant Improvements | 2,000 | $2,330 | $2,330 | $0.21060 | $2,656 | $0.24008 | $3,028 | $0.27378 | $3,168 | $0.28641 | $3,401 | $0.30747 |
| L | Laboratories Group L - Tenant Improvements | 4,000 | $2,751 | $2,751 | $0.68770 | $3,136 | $0.78398 | $3,576 | $0.89401 | $3,741 | $0.93528 | $4,016 | $1.00405 |
| M | Mercantile (Department, Retail, Drug Stores, Gas Stations) - Complete | 800 | $2,073 | $2,073 | $0.33793 | $2,363 | $0.48044 | $4,695 | $0.46531 | $2,819 | $0.48679 | $3,026 | $0.52258 |
| M | Mercantile (Department, Retail, Drug Stores, Gas Stations) - Complete | 2,400 | $2,646 | $2,646 | $0.16374 | $3,016 | $0.18667 | $3,439 | $0.21287 | $3,598 | $0.22269 | $3,863 | $0.23907 |
| M | Mercantile (Department, Retail, Drug Stores, Gas Stations) - Complete | 8,000 | $3,563 | $3,563 | $0.10078 | $4,061 | $0.11489 | $4,631 | $0.13101 | $4,845 | $0.13706 | $5,201 | $0.14714 |
| M | Mercantile (Department, Retail, Drug Stores, Gas Stations) - Complete | 16,000 | $4,369 | $4,369 | $0.05923 | $4,980 | $0.06753 | $5,679 | $0.07701 | $5,942 | $0.08056 | $6.378 | $0.08648 |
| M | Mercantile (Department, Retail, Drug Stores, Gas Stations) - Complete | 32,000 | $5,317 | $5,317 | $0.16614 | $6,061 | $0.18940 | $6,912 | $0.21398 | $7,231 | $0.22595 | $7,762 | $0.24257 |
| M | Mercantile (Department, Retail, Drug Stores, Gas Stations) - Tenant Improvements | 100 | $1,231 | $1,231 | $1.56883 | $1,403 | $1.78846 | $1,600 | $2.03948 | $1,674 | $2.13361 | $1,797 | $2.29045 |
| M | Mercantile (Department, Retail, Drug Stores, Gas Stations) - Tenant Improvements | 300 | $1,544 | $1,544 | $0.70810 | $1,761 | $0.80724 | $2,008 | $0.92053 | $2,100 | $0.96302 | $2,255 | $1.03383 |
| M | Mercantile (Department, Retail, Drug Stores, Gas Stations) - Tenant Improvements | 1,000 | $2,040 | $2,040 | $0.45313 | $2,326 | $0.51656 | $2,652 | $0.58906 | $2,774 | $0.61625 | $2,978 | $0.66156 |
| M | Mercantile (Department, Retail, Drug Stores, Gas Stations) - Tenant Improvements | 2,000 | $2,493 | $2,493 | $0.25077 | $2,842 | $0.28588 | $3,241 | $0.32601 | $3,391 | $0.34105 | $3,640 | $0.36613 |
| M | Mercantile (Department, Retail, Drug Stores, Gas Stations) - Tenant Improvements | 4,000 | $2,995 | $2,995 | $0.74868 | $3,414 | $0.85349 | $3,893 | $0.97328 | $4,073 | $1.01820 | $4,372 | $1.09307 |
| S-1 | Storage Moderate Hazard - Motor Vehicle Repair - Complete | 500 | $1,674 | $1,674 | $0.47083 | $1,909 | $0.53675 | $2,176 | $0.61208 | $2,277 | $0.64033 | $2,444 | $0.68742 |
| CONSTRUCTION TYPE and RATIO OF REQUIRED EFFORT | |||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| S-1 | Storage Moderate Hazard - Motor Vehicle Repair - Complete | 1,500 | $2,145 | $2,145 | $0.21277 | $2,445 | $0.24255 | $2,789 | $0.27659 | $2,917 | $0.28936 | $3,132 | $0.31064 |
| S-1 | Storage Moderate Hazard - Motor Vehicle Repair - Complete | 5,000 | $2,890 | $2,890 | $0.13685 | $3,294 | $0.15600 | $3,757 | $0.17790 | $3,930 | $0.18611 | $4,219 | $0.19980 |
| S-1 | Storage Moderate Hazard - Motor Vehicle Repair - Complete | 10,000 | $3,574 | $3,574 | $0.07506 | $4,074 | $0.08556 | $4,646 | $0.09757 | $4,861 | $0.10208 | $5,218 | $0,10958 |
| S-1 | Storage Moderate Hazard - Motor Vehicle Repair - Complete | 20,000 | $4,325 | $4,325 | $0.21623 | $4,930 | $0.24650 | $5,622 | $0.28109 | $5,881 | $0.29407 | $6,314 | $0.31569 |
| S-2 | Storage - Low Hazard - Parking Garages - Complete | 2,500 | $2,320 | $2,320 | $0.12813 | $2,645 | $0.14606 | $3,016 | $0.16656 | $3,156 | $0.17425 | $3,388 | $0.18706 |
| S-2 | Storage - Low Hazard - Parking Garages - Complete | 7,500 | $2,961 | $2,961 | $0.05925 | $3,375 | $0.06755 | $3,849 | $0.07703 | $4,027 | $0.08058 | $4,323 | $0.08651 |
| S-2 | Storage - Low Hazard - Parking Garages - Complete | 25,000 | $3,998 | $3,998 | $0.03513 | $4,557 | $0.04004 | $5,197 | $0.04566 | $5,437 | $0.04777 | $5,837 | $0.05128 |
| S-2 | Storage - Low Hazard - Parking Garages - Complete | 50,000 | $4,876 | $4,876 | $0.02186 | $5,559 | $0.02492 | $6,339 | $0.02842 | $6,631 | $0.02974 | $7,119 | $0.03192 |
| S-2 | Storage - Low Hazard - Parking Garages - Complete | 100,000 | $5,969 | $5,969 | $0.05969 | $6,805 | $0.06805 | $7,760 | $0.07760 | $8,118 | $0.08118 | $8,715 | $0.08715 |
| S | Storage - Tenant Improvements | 100 | $1,112 | $1,112 | $1.38090 | $1,268 | $1.57423 | $1,446 | $1.79517 | $1,512 | $1.87803 | $1,624 | $2.01612 |
| S | Storage - Tenant Improvements | 300 | $1,388 | $1,388 | $0.61338 | $1,583 | $0.69925 | $1,805 | $0.79739 | $1,888 | $0.83419 | $2,027 | $0.89553 |
| S | Storage - Tenant Improvements | 1,000 | $1,818 | $1,818 | $0.41325 | $2,072 | $0.47110 | $2,363 | $0.53722 | $2,472 | $0.56202 | $2,654 | $0.60334 |
| S | Storage - Tenant Improvements | 2,000 | $2,231 | $2,231 | $0.21060 | $2,543 | $0.24008 | $2,900 | $0.27378 | $3,034 | $0.28641 | $3,257 | $0.30747 |
| S | Storage - Tenant Improvements | 4,000 | $2,652 | $2,652 | $0.66301 | $3,023 | $0.75583 | $3,448 | $0.86191 | $3,607 | $0.90169 | $3,872 | $0.96799 |
| U | Utility and Accessory Structures - Agricultural/ |
300 | $911 | $911 | $0.39877 | $1,039 | $0.45460 | $1,185 | $0.51841 | $1,239 | $0.54233 | $1,330 | $0.58221 |
| U | Utility and Accessory Structures - Agricultural/ |
900 | $1,151 | $1,151 | $0.18193 | $1,312 | $0.20740 | $1,496 | $0.23651 | $1,565 | $0.24743 | $1,680 | $0.26562 |
| U | Utility and Accessory Structures - Agricultural/ |
3,000 | $1,533 | $1,533 | $0.11745 | $1,747 | $0.13390 | $1,992 | $0.15269 | $2,084 | $0.15974 | $2,238 | $0.17148 |
| U | Utility and Accessory Structures - Agricultural/ |
6,000 | $1,885 | $1,885 | $0.06379 | $2,149 | $0.07272 | $2,450 | $0.08293 | $2,564 | $0.08676 | $2,752 | $0.09314 |
| U | Utility and Accessory Structures - Agricultural/ |
12,000 | $2,268 | $2,268 | $0.18898 | $2,585 | $0.21544 | $2,948 | $0.24567 | $3,084 | $0.25701 | $3,311 | $0.27591 |
| U | Utility and Accessory Structures - Hangers and Heli-Stops - Complete | 300 | $1,254 | $1,254 | $0.48520 | $1,430 | $0.55313 | $1,631 | $0.63076 | $1,706 | $0.63987 | $1,151 | $0.70839 |
| U | Utility and Accessory Structures - Hangers and Heli-Stops - Complete | 900 | $1,546 | $1,546 | $0.22618 | $1,762 | $0.25785 | $2,005 | $0.29404 | $2,102 | $0.30761 | $2,256 | $0.33023 |
| U | Utility and Accessory Structures - Hangers and Heli-Stops - Complete | 3,000 | $2,021 | $2,021 | $0.13489 | $2,303 | $0.15377 | $2,627 | $0.17535 | $2,748 | $0.18345 | $2,950 | $0.19694 |
| U | Utility and Accessory Structures - Hangers and Heli-Stops - Complete | 6,000 | $2,425 | $2,425 | $0.08294 | $2,765 | $0.09455 | $3,153 | $0.10782 | $3,298 | $0.11280 | $3,541 | $0.12109 |
| U | Utility and Accessory Structures - Hangers and Heli-Stops - Complete | 12,000 | $2,923 | $2,923 | $0.24357 | $3,332 | $0.27767 | $3,300 | $0.31664 | $3,975 | $0.33125 | $4,267 | s 0.33361 |
| U | Utility and Accessory Structures - Garages - Complete | 200 | $828 | $828 | $0.52845 | $944 | $0.60243 | $1,076 | $0.68699 | $1,126 | $0.71869 | $1,209 | $0.77154 |
| U | Utility and Accessory Structures - Garages - Complete | 600 | $1,039 | $1,039 | $0.24222 | $1,185 | $0.27614 | $1,351 | $0.31489 | $1,413 | $0.32943 | $1,517 | $0.35365 |
| U | Utility and Accessory Structures - Garages - Complete | 2,000 | $1,378 | $1,378 | $0.135352 | $1,371 | $0.17730 | $1,792 | $0.20218 | $1,874 | $0.21151 | $2,012 | $0.22706 |
| U | Utility and Accessory Structures - Garages - Complete | 4,000 | $1,689 | $1,689 | $0.08512 | $1,926 | $0.09704 | $2,196 | $0.11065 | $2,297 | $0.11576 | $2,466 | $0.12427 |
| U | Utility and Accessory Structures - Garages - Complete | 8,000 | $2,030 | $2,030 | $0.25372 | $2,314 | $0.28924 | $2,639 | $0.32984 | $2,760 | $0.34506 | $2,963 | $0.37043 |
| U | Utility and Accessory Structures - Tenant Improvementd | 50 | $639 | $639 | $1.45045 | $729 | $1.65352 | $831 | $1.88559 | $870 | $1.97262 | $934 | $2.11766 |
| CONSTRUCTION TYPE and RATIO OF REQUIRED EFFORT | |||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| U | Utility and Accessory Structures - Tenant Improvementd | 150 | $784 | $784 | $0.66768 | $894 | $0.76116 | $1,020 | $0.86799 | $1,067 | $0.90805 | $1,145 | $0.97482 |
| U | Utility and Accessory Structures - Tenant Improvementd | 500 | $1,018 | $1,018 | $0.43777 | $1,161 | $0.49906 | $1,324 | $0.56910 | $1,385 | $0.59537 | $1,487 | $0.63914 |
| U | Utility and Accessory Structures - Tenant Improvementd | 1,000 | $1,237 | $1,237 | $0.23083 | $1,410 | $0.26314 | $1,608 | $0.30008 | $1,682 | $0.31393 | $1,806 | $0.33701 |
| U | Utility and Accessory Structures - Tenant Improvementd | 2,000 | $1,468 | $1,468 | $0.73394 | $1,673 | $0.83669 | $1,908 | $0.95412 | $1,996 | $0.99815 | $2,143 | $1.07155 |
| O | All Other Commercial Tenant | 300 | $1,332 | $1,332 | $0.56493 | $1,519 | $0.64402 | $1,732 | $0.73440 | $1,812 | $0.76830 | $1,945 | $0.82479 |
| O | All Other Commercial Tenant | 900 | $1,671 | $1,671 | $0.26023 | $1,905 | $0.29666 | $2,172 | $0.33830 | $2,273 | $0.35391 | $2,440 | $0.37993 |
| O | All Other Commercial Tenant | 3,000 | $2,218 | $2,218 | $0.15988 | $2,528 | $0.18226 | $2,883 | $0.20784 | $3,016 | $0.21744 | $3,238 | $0.23342 |
| O | All Other Commercial Tenant | 6,000 | $2,697 | $2,697 | $0.09402 | $3,075 | $0.10719 | $3,506 | $0.12223 | $3,668 | $0.12787 | $3,938 | $0.13727 |
| O | All Other Commercial Tenant | 12,000 | $3,261 | $3,261 | $0.27178 | $3,718 | $0.30983 | $4,240 | $0.35331 | $4,435 | $0.36962 | $3,762 | $0.39679 |
| O | All Shell Buildings - Complete | 500 | $1,779 | $1,179 | $0.48918 | $2,028 | $0.55767 | $2,313 | $0.63594 | $2,419 | $0.66329 | $2,597 | $0.71421 |
| O | All Shell Buildings - Complete | 1,500 | $2,268 | $2,268 | $0.22138 | $2,586 | $0.25237 | $2,949 | $0.28779 | $3,085 | $0.30107 | $3,312 | $0.32321 |
| O | All Shell Buildings - Complete | 5,000 | $3,043 | $3,043 | $0.13923 | $3,469 | $0.15872 | $3,956 | $0.18100 | $4,138 | $0.18935 | $4,443 | $0.20328 |
| O | All Shell Buildings - Complete | 10,000 | $3,739 | $3,739 | $0.07925 | $4,263 | $0.09035 | $4,861 | $0.10303 | $5,085 | $0.10778 | $5,459 | $0.11571 |
| O | All Shell Buildings - Complete | 20,000 | $4,532 | $4,532 | $0.22658 | $5,166 | $0.25830 | $5,891 | $0.29456 | $6,163 | $0.30815 | $6,616 | $0.33081 |
| R-1 | Residential - Transient (Hotel, Motel, Boarding) | 3,750 | $4,463 | $4,463 | $ - | $5,088 | $ - | $5,802 | $ - | $6,069 | $ - | $6,316 | $ - |
| R-1 | Residential - Transient (Hotel, Motel, Boarding) | 7,500 | $4,463 | $4,463 | $0.07375 | $5,088 | $0.08408 | $5,802 | $0.09588 | $6,069 | $0.10031 | $6,516 | $0.10768 |
| R-1 | Residential - Transient (Hotel, Motel, Boarding) | 15,000 | $5,016 | $5,016 | $0.14534 | $5,088 | $0.16568 | $6,521 | $0.18894 | $6,822 | $0.19766 | $7,323 | $0.21219 |
| R-1 | Residential - Transient (Hotel, Motel, Boarding) | 37,500 | $8,286 | $8,286 | $0.12463 | $9,446 | $0.14208 | $10,772 | $0.16202 | $11,269 | $0.16950 | $12,098 | $0.18196 |
| R-1 | Residential - Transient (Hotel, Motel, Boarding) | 75,000 | $12,960 | $12,960 | $0.17280 | $14,774 | $0.19699 | $16,843 | $0.22463 | $17,625 | $0.23500 | $18,921 | $0.25228 |
| R-2 | Permanent - Apartment Houses, Congregate Residences/ |
1,250 | $3,363 | $3,363 | $ - | $3,836 | $ - | $4,374 | $ - | $4.576 | $ - | $4,912 | $ - |
| R-2 | Permanent - Apartment Houses, Congregate Residences/ |
2,500 | $3,365 | $3,365 | $0.15665 | $3,836 | $0.17858 | $4,374 | $0.20364 | $4,576 | $0.21304 | $4,912 | $0.22871 |
| R-2 | Permanent - Apartment Houses, Congregate Residences/ |
5,000 | $3,756 | $3,756 | $0.31954 | $4,282 | $0.36428 | $4,883 | $0.41541 | $5,109 | $0.43458 | $5,484 | $0.46653 |
| R-2 | Permanent - Apartment Houses, Congregate Residences/ |
12,500 | $6,153 | $6,153 | $0.27952 | $7,014 | $0.31865 | $7,999 | $0.36338 | $8,368 | $0.38015 | $3,983 | $0.40810 |
| R-2 | Permanent - Apartment Houses, Congregate Residences/ |
25,000 | $9,647 | $9,647 | $0.38588 | $10,997 | $0.43990 | $12,541 | $0.50164 | $13,120 | $0.52479 | $14,085 | $0.56338 |
| R-3 | Accessory Dwelling Unit (Up to 1,200 sq. ft.) | 188 | $1,851 | $1,851 | $ - | $2,110 | $ - | $2,406 | $ - | $2,517 | $ - | $2,702 | $ - |
| R-3 | Accessory Dwelling Unit (Up to 1,200 sq. ft.) | 375 | $1,851 | $1,851 | $0.57005 | $2,110 | $0.64985 | $2,406 | $0.74106 | $2,517 | $0.77526 | $2,702 | $0.83227 |
| R-3 | Accessory Dwelling Unit (Up to 1,200 sq. ft.) | 750 | $2,065 | $2,065 | $1.14946 | $2,354 | $1.31038 | $2,684 | $1.49430 | $2,808 | $1.56327 | $3,014 | $1.67821 |
| R-3 | Accessory Dwelling Unit (Up to 1,200 sq. ft.) | 1,200 | $2,582 | $2,582 | $2.15151 | $2,943 | $2.45272 | $3,356 | $2.79696 | $3,511 | $2.92605 | $3,769 | $3.14120 |
| R-3 | Accessory Dwelling Unit (Up to 1,200 sq. ft.) | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - |
| R-3 | Tiny Homes and Efficiency Dwelling Units | 100 | $1,737 | $1,737 | $ - | $1,980 | $ - | $2,258 | $ - | $2,362 | $ - | $2,536 | $ - |
| R-3 | Tiny Homes and Efficiency Dwelling Units | 200 | $1,737 | $1,737 | $0.97095 | $1,980 | $1.10688 | $2,258 | $1.26224 | $2,362 | $1.32049 | $2,536 | $1.41759 |
| R-3 | Tiny Homes and Efficiency Dwelling Units | 400 | $1,931 | $1,931 | $4.82793 | $2,202 | $5.50384 | $2,511 | $6.27631 | $2,626 | $6.56598 | $2,820 | $7.04877 |
| CONSTRUCTION TYPE and RATIO OF REQUIRED EFFORT | |||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| R-3 | Tiny Homes and Efficiency Dwelling Units | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - |
| R-3 | Tiny Homes and Efficiency Dwelling Units | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - |
| R-3 | Dwelling - Custom, Models, Single- and Two-Family Lodging Houses | 500 | $2,165 | $2,165 | $ - | $2,468 | $ - | $2,814 | $ - | $2,944 | $ - | $3,160 | $ - |
| R-3 | Dwelling - Custom, Models, Single- and Two-Family Lodging Houses | 1,000 | $2,165 | $2,165 | $0.25868 | $2,468 | $0.29489 | $2,814 | $0.33628 | $2,944 | $0.35180 | $3,160 | $0.37767 |
| R-3 | Dwelling - Custom, Models, Single- and Two-Family Lodging Houses | 2,000 | $2,423 | $2,423 | $0.51949 | $2,762 | $0.59222 | $3,150 | $0.67534 | $3,296 | $0.70651 | $3,538 | $0.75846 |
| R-3 | Dwelling - Custom, Models, Single- and Two-Family Lodging Houses | 5,000 | $3,982 | $3,982 | $0.45807 | $4,539 | $0.52220 | $5,176 | $0.59549 | $5,415 | $0.62297 | $5,813 | $0.66878 |
| R-3 | Dwelling - Custom, Models, Single- and Two-Family Lodging Houses | 10,000 | $6,272 | $6,272 | $0.62721 | $7,150 | $0.71501 | $8,154 | $0.81537 | $8,530 | $0.85300 | $9,157 | $0.913572 |
| R-3 | Dwellings - Production Phase - Tract | 500 | $2,503 | $2,503 | $ - | $2,853 | $ - | $3,254 | $ - | $3,404 | $ - | $3,654 | $ - |
| R-3 | Dwellings - Production Phase - Tract | 2,000 | $2,797 | $2,797 | $0.61084 | $3,189 | $0.69636 | $3,636 | $0.79409 | $3,804 | $0.83074 | $4,084 | $0.89183 |
| R-3 | Dwellings - Production Phase - Tract | 5,000 | $4,630 | $4,630 | $0.54229 | $5.278 | $0.61821 | $6,018 | $0.70497 | $6,296 | $0.73751 | $6,759 | $0.79174 |
| R-3 | Dwellings - Production Phase - Tract | 10,000 | $7,341 | $7,341 | $0.73410 | $8,369 | $0.83688 | $9,543 | $0.95433 | $9,984 | $0.99838 | $10,718 | $1.07179 |
| R-3 | Accessory Junior Dwelling Up to 500 sq. ft. | 38 | $1,101 | $1,101 | $ - | $1,255 | $ - | $1,431 | $ - | $1,497 | $ - | $1,607 | $ - |
| R-3 | Accessory Junior Dwelling Up to 500 sq. ft. | 75 | $1,101 | $1,101 | $1.50662 | $1,255 | $1.71755 | $1,431 | $1.95861 | $1,497 | $2.04900 | $1,607 | $2.19966 |
| R-3 | Accessory Junior Dwelling Up to 500 sq. ft. | 150 | $1,214 | $1,214$ | $3.12597 | $1,384 | $3.56360 | $1,578 | $4.06376 | $1,651 | $4.25131 | $1,772 | $4.56391 |
| R-3 | Accessory Junior Dwelling Up to 500 sq. ft. | 375 | $1,917 | $1,917 | $2.80973 | $2,186 | $3.20309 | $2,492 | $3.65265 | $2,607 | $3.82123 | $2,799 | $4.10220 |
| R-4 | Large Family Day Care Home | 1,250 | $3,155 | $3,155 | $ - | $3,397 | $ - | $4,102 | $ - | $4,291 | $ - | $4,607 | $ - |
| R-4 | Large Family Day Care Home | 2,500 | $3,155 | $3,155 | $0.15585 | $3,597 | $0.17767 | $4,102 | $0.20260 | $4,291 | $0.21195 | $4,607 | $0.22754 |
| R-4 | Large Family Day Care Home | 5,000 | $3,545 | $3,545 | $0.31815 | $4,041 | $0.36270 | $4,608 | $0.41360 | $4,821 | $0.43269 | $5,176 | $0.46450 |
| R-4 | Large Family Day Care Home | 12,500 | $5,931 | $5,931 | $0.27863 | $6,761 | $0.31764 | $7,710 | $0.36222 | $8,066 | $0.37894 | $8,659 | $0.40680 |
| R-4 | Large Family Day Care Home | 25,000 | $9,414 | $9,414 | $0.37656 | $10,732 | $0.42928 | $12,238 | $0.48953 | $12,803 | $0.51212 | $13,744 | $0.54978 |
(Ord. No. 1587, §§ 1, 2, 12-5-23)
90902.03 - Electrical.¶
| 1. | For issuing permits, each (no exceptions | $ 250.00 |
|---|---|---|
| 2. | For electrical service, fee is as follows: | For electrical service, fee is as follows: |
| Service (per 100 amps) | 68.40 | |
| Service (per 125 amps) | 68.40 | |
| Service (per 200 amps) | 85.50 | |
| Service (per 300 amps) | 111.15 | |
| Service (per 400 amps) | 136.80 | |
| Service (per 600 amps) | 205.20 | |
| Service (per 800 amps) | 307.80 | |
| First 10 circuits | 34.20 | |
| 11 to 40 circuits | 17.10 | |
| 41 + circuits | 17.10 | |
| Pre-inspection | 256.50 | |
| Sign circuit | 34.20 | |
| Other electrical inspections | 76.95 | |
| Standalone electrical plan check (per hour) | 102.60 | |
| Other electrical inspections | 102.60 |
(Ord. 1386 (part), 2004: Ord. 1355 § 2 (part), 2002)
90902.04 - Plumbing fees.¶
A. Fees for reconnecting and retesting of existing plumbing systems in relocated buildings shall be based on the number of plumbing fixtures, gas systems, water heaters and the like involved. For the purpose of this section, a sanitary plumbing outlet on or to which a plumbing fixture or appliance may be set or attached shall be construed to be a fixture.
B. When a permit has been obtained to connect an existing building or existing work to the public sewer or to new private disposal facility, backfilling work and/or the abandoning of private sewage disposal facilities consequent to such connection shall be included in the building permit.
C. In lieu of those fees set forth in the California Plumbing Code, the following fees shall be charged for permits issued pursuant to this division:
Schedule of Fees
| Issuance of permit (no exceptions) | $250.00 |
|---|---|
| For each plumbing fixture | 25.65 |
| For each trap | 51.30 |
| For each building sewer connection | 34.20 |
| For each water heater | 51.30 |
| For each additional heater | 17.10 |
| For each gas line | 51.30 |
| For each gas outlet | 8.55 |
| For installation, repair or alteration of water pipings | 51.30 |
| For repair or alteration of drainage or vent pipings | 17.10 |
| For each backflow device (first five) | 34.20 |
| For each backflow device more than five — each | 8.55 |
| Standalone plumbing plan check (hourly rate) | 102.60 |
| Ejector pump | 34.20 |
| Roof drain-Rain water system | 17.10 |
| Water service | 25.65 |
| Drinking fountain | 25.65 |
| Solar water system fixtures (solar panels, tanks, water treatment equip) | 136.80 |
| Graywater systems (per hour) | 102.60 |
| Swimming pool piping and gas | 136.80 |
| Medical gas system (each outlet) | 76.95 |
| Other plumbing and gas inspections (per hour) | 102.60 |
The applicable fees shall be paid prior to issuance of the permit.
(Ord. 1386 (part), 2004: Ord. 1355 § 2 (part), 2002)
90902.05 - Mechanical fees.¶
| Fee Title | Fee Type | Fee |
|---|---|---|
| UNIT FEES: | UNIT FEES: | UNIT FEES: |
| ADMINISTRATIVE (BASE) FEES: | ||
| MP&E PLAN CHECK Issuance and Administration (includes "base" time for initial intake, review, documentation, and processing) (Basic Application Processing Fee for all MPE Plan Checks.) - Base Fee may encompass multiple plan check under a combined application/ |
FLAT | $176.82 |
| MP&E PERMIT/ |
FLAT | $148.78 |
| Re-inspection fees assessed under provisions of Section 305(g) - Actual Time at Staff Hourly Rates | HOURLY | |
| Deferred Submittal - Actual Time at Staff Hourly Rate | HOURLY | |
| Permit Reactivation | CALCULATED | CALCULATED |
| MECHANICAL FEES (cost for direct plan check or inspection services): | ||
| HVAC Unit | FLAT | $132.27 |
| Boiler - up to 200,000 BTU | FLAT | $181.44 |
| Boiler - Greater than 200,000 BTU | FLAT | $344.66 |
| Chiller Unit | FLAT | $344.66 |
| Air Handler and/ |
FLAT | $143.59 |
| Furnace Unit | FLAT | $181.44 |
| Evaporative Cooler | FLAT | $132.27 |
| Make-up Air System | FLAT | $132.27 |
| Moisture Exhaust Duct (Clothes Dryer) | FLAT | $132.27 |
| Variable Air Volume Box (Including Duct Work) | FLAT | $132.27 |
| Vent Fan (Single Duel) - each | FLAT | $132.27 |
| Vent System (SINGLE STORY) | FLAT | $132.27 |
| Exhaust Hood and Duct (Residential) | FLAT | $132.27 |
| Exhaust Hood - Type 1 (Commercial Grease Hood) | FLAT | $143.59 |
| Exhaust Hood - Type II (Commercial Steam Hood) | FLAT | $233.07 |
| Non-Residential Incinerator | FLAT | $374.18 |
| Refrigerator Condenser Remote | FLAT | $132.27 |
| Walk-in Box/ |
FLAT | $423.34 |
| Each Additional Walk in Box Ref Room | FLAT | $246.58 |
| Mechanical Inspections for which no fee is specifically indicated | HOURLY | |
| Mechanical inspections outside of normal business hours Actual Time at Staff Hourly Rates with a Minimum Charge of Two Hours | HOURLY | |
| Additional Mechanical Inspections required by changes, additions, or revisions to approved plans - Actual Time at Staff Hourly Rates | HOURLY | |
| Stand Alone Mechanical Plan Check - Actual Time at Staff Hourly Rates | HOURLY | |
| Additional Mechanical plan review required by changes, additions, or revisions to approved plans - Actual Time at Staff Hourly Rates | HOURLY | |
| PLUMBING FEES (cost for direct plan check or inspection services): | ||
| Plumbing Fixture (If Plumbing Alterations or Repair Required) | FLAT | $71.80 |
| Building Sewer Connection | FLAT | $71.80 |
| Water Heater | FLAT | $71.80 |
| Gas Line First 100 LF | FLAT | $83.11 |
| Each Additional 30 LF | FLAT | $11.31 |
| Gas Outlet First Including Piping | FLAT | $71.80 |
| Each Additional | FLAT | $11.31 |
| Installation, Repair or Alteration of Water, Drainage, or Vent Piping | FLAT | $47.21 |
| Backflow Device | FLAT | $96.38 |
| Sump/ |
FLAT | $107.69 |
| Roof drain - Rain Water System | FLAT | $83.11 |
| Water Service Connection | FLAT | $71.80 |
| Solar Thermal Water System Install (solar panels, tanks, water treatment equip.) | FLAT | $317.15 |
| Solar Thermal Water System Repair or Alteration (solar panels, tanks, water treatment equip.) | FLAT | $257.65 |
| Graywater Systems | FLAT | $120.96 |
| Swimming Pool Piping and Gas system Repair or Alteration | FLAT | $132.27 |
| Jacuzzi installation includes Plumbing and Electric for bathroom | FLAT | $143.59 |
| Medical Gas System | FLAT | $133.28 |
| Medical Gas Outlets up to 5 | FLAT | $71.80 |
| Medical Gas Outlets Each Additional 5 outlets | FLAT | $35.89 |
| Plumbing and Gas Inspections for which no fee is specifically indicated - Actual Time at Staff Hourly Rates | HOURLY | |
| Plumbing and Gas Inspections outside of normal business hours - Actual Time at Staff Hourly Rates with a Minimum Charge of Two Hours | HOURLY | |
| Additional Plumbing and Gas Inspections required by changes, additions, or revisions to approved plans - Actual Time at Staff Hourly Rates | HOURLY | |
| Stand Alone Plumbing and Gas Plan Check - Actual Time at Staff Hourly Rates | HOURLY | |
| Additional Plumbing and Gas plan review required by changes, additions, or revisions to approved plans - Actual Time at Staff Hourly Rates | HOURLY | |
| ELECTRICAL (cost for direct plan check or inspection services): | ||
| Residential Service | FLAT | $162.82 |
| Upgrades. Alterations, or Repairs | FLAT | $137.93 |
| Commercial Service - up to 600 amps | FLAT | $316.18 |
| Commercial Service - above 600 up to 1500 amps | FLAT | $387.97 |
| Commercial Service - additional 300 amps above | FLAT | $45.26 |
| Residential Electric Vehicle Charger system Level 1 and 2 - each | FLAT | $215.97 |
| Commercial Electric Vehicle Charger system Level 1 and 2 - each | FLAT | $431.98 |
| Commercial Electric Vehicle Charger system DC Fast Charge Level 3 - each | FLAT | $539.92 |
| Temporary Utility Connection | FLAT | $215.97 |
| Electrical Inspections for which no fee is specifically indicated - Actual Time at Staff Hourly Rates | HOURLY | |
| Electrical Inspections outside of normal business hours - Actual Time at Staff Hourly Rates with a Minimum Charge of Two Hours | HOURLY | |
| Additional Electrical Inspections required by changes, additions, or revisions to approved plans Actual Time at Staff Hourly Rates | HOURLY | |
| Stand Alone Electrical Plan Check - Actual Time at Staff Hourly Rates | HOURLY | |
| Additional Electrical plan review required by changes, additions, or revisions to approved plans Actual Time at Staff Hourly Rates | HOURLY |
(Ord. 1386 (part), 2004: Ord. 1355 § 2 (part), 2002)
(Ord. No. 1587, §§ 1, 2, 12-5-23)
90902.06 - Sign.¶
| Permanent (each) | $ 871.59 |
|---|---|
| Billboard (each) | 1,127.94 |
| Ground/ |
563.97 |
| Replacement — Permit sticker (each) | 461.63 |
| Rework of any existing ground sign (each) | 461.43 |
| Subdivision directional sign (each) | 461.43 |
| Wall/ |
461.43 |
| Wall, electric (each) | 512.70 |
(Ord. 1386 (part), 2004: Ord. 1355 § 2 (part), 2002)
90902.07 - Other fees.¶
A. Inspections outside of normal business hours, one hundred two dollars and fifty-four cents ($102.54) per hour.
Within one hour before or after normal working hours (minimum charge - one hour).
Other inspections outside normal working hours (minimum charge - two hours).
B. Re-inspection fee assessed under California Building Code, one hundred two dollars and fifty-four cents ($102.54) each.
C. Inspections for which no fee is specifically indicated (minimum charge - one hour), one hundred two dollars and fifty-four cents ($102.54) per hour.
D. Additional plan review required by changes, additions, or revisions of approved plans (minimum charge - one hour), one hundred two dollars and fifty-four cents ($102.54) per hour.
E. Inspection fees for full-time, on-site inspection services (minimum charge - one hour), one hundred two dollars and fifty-four cents ($102.54) per hour.
F. Other Fees. In addition to the foregoing, fees shall also be charged for:
| 1. A mobile home installation on non-foundation system | $1,179.21 |
|---|---|
| 2. Mobile home re-inspection per hour | 102.54 |
| 3. Mobile home installation on foundation system | 1,179.21 |
| 4. Skirting inspection | 60.00 |
| 5. Pre-inspection of mobile home for compliance with 1974 standards | 769.05 |
| 6. An inspection of dwellings pursuant to state and federal regulations per hour | 102.54 |
| 7. Zoning map maintenance fee and general plan maintenance fee shall be charged for each permit issued per this title | 10.00 |
| Miscellaneous Items. | |
|---|---|
| Basic Antenna | |
| 0-30 ft. (each) | $ 666.51 |
| 31+ ft. (each) | 820.32 |
| Equipment Shelter <150 sq. ft. (each) | 692.15 |
| Equipment Shelter >150 sq. ft. (each) | 769.05 |
| Cellular/ |
|
| Freestanding, monopole (each) | 1,281.75 |
| Freestanding, lattice (each) | 1,333.02 |
| Co-location monopole (each) | 615.24 |
| Co-location, lattice (each) | 666.51 |
| Appeal of Abatement Notice (each) | 871.59 |
| Awning or Canopy (each) | 461.43 |
| Balcony addition (each) | 461.43 |
| Change of Occupancy (each) | 615.24 |
| Close Existing Openings | |
| Interior wall (each) | 461.43 |
| Exterior wall (each) | 769.05 |
| Commercial Coach (per unit) each unit | 717.78 |
| Compliance Inspections/ Re-inspections (each) | 615.24 |
| Covered Porch (each) | 563.97 |
| Deck (wood) (each) | 615.24 |
| Deck (wood) (with Calcs) (each) | 717.78 |
| Demolition (each) | 563.97 |
| Demolition - Multifamily/ Commercial (each) | 717.78 |
| Pre-demolition Inspection first hour) (each) | 102.54 |
| Pre-demolition Insp. (each additional hour) hourly rate | 102.54 |
| Door | |
| New door (nonstructural) (each) | 410.16 |
| New door (structural shear wall/ |
410.16 |
| Fence or Freestanding Wall | |
| 6-10 feet in height (up to 100 l.f.) | 615.24 |
| Each additional 100 l.f. (each 100 l.f.) | 102.54 |
| Over 10 feet in height (up to 100 l.f.) | 743.42 |
| Fireplace (each) | $ 205.08 |
| Masonry (each) | 717.78 |
| Pre-fabricated/ |
563.97 |
| Flag pole (over 30 feet in height) (each) | 615.24 |
| Grading (Cut and Fill) (each) | |
| 0-50 cubic yards (cut and fill) | 615.24 |
| 51-100 cubic yards | 615.24 |
| Each additional 100 cubic yards or portion thereof | 153.81 |
| 1,000 cubic yards (minimum) | 666.51 |
| Each additional 1,000 cubic yards or portion thereof | 153.81 |
| 10,000 cubic yards (minimum) | 1,025.40 |
| Each additional 10,000 cubic yards or portion thereof | 256.35 |
| 100,000 cubic yards (minimum) | 871.59 |
| Each additional 10,000 cubic yards or portion thereof | 256.35 |
| Greenhouse (non-commercial) (each) | 922.86 |
| Lighting pole (each) | 563.97 |
| each additional pole (each) | 461.43 |
| Partition - Commercial, Interior (up to 30 l.f.) (each 30 l.f.) | 666.51 |
| Partition - Residential, Interior (up to 30 l.f.) (each 30 l.f.) | 589.61 |
| Photovoltaic System per KWh | 717.78 |
| Pile Foundation | |
| Cast in Place Concrete (first 10 piles) (up to 10) | 1,333.02 |
| Additional Piles (increments of 10) (each 10) | 461.43 |
| Driven (steel, pre-stressed concrete) (up to 10) | 1,435.56 |
| Additional Piles (increments of 10) each 10 | 563.97 |
| Pre-inspection (each) | 769.05 |
| Stucco Application (up to 400 l.f.) | 820.32 |
| Additional Stucco Application (each 400 l.f.) | 102.54 |
| Retaining Wall (concrete or masonry) | |
| First 50 l.f. (up to 50 l.f.) | 1,025.40 |
| Additional retaining wall (each 50 l.f.) | 307.62 |
| Special Design, 3-10' high (up to 50 l.f.) up to 50 l.f. | $ 922.86 |
| Additional retaining wall (each 50 l.f.) | 153.81 |
| Special Design, over 10' high (up to 50 l.f.) up to 50 l.f. | 1,333.02 |
| Additional retaining wall (each 50 l.f.) | 256.35 |
| Gravity/ |
922.86 |
| Additional Gravity/ |
307.62 |
| Gravity/ |
1,230.48 |
| Additional Gravity/ |
256.35 |
| Remodel - Residential | |
| 500 s.f. Single Story (up to 500 s.f.) | 1,230.48 |
| Kitchen (more than 500 s.f.) | 717.78 |
| Additional remodel (each 500 s.f.) | 307.62 |
| Re-roofing | |
| Tile/ |
563.97 |
| Each additional 100 s.f. (each 100 s.f.) | 153.81 |
| Comp/ |
769.05 |
| Each additional 100 s.f. (each 100 s.f.) | 153.81 |
| Roof Structure Replacement (up to 100 s.f.) | 922.86 |
| Additional roof structure replacement (each 100 s.f.) | 153.81 |
| Room Addition - First Story | |
| Up to 500 s.f. | 820.32 |
| Up to 500 s.f. (with Calcs) | 1,076.67 |
| Additional room addition (over 500 s.f.) each 500 s.f. | 615.24 |
| Additional room addition (over 500 s.f. with Calcs) each 500 s.f. | 769.05 |
| Room Addition - Multi-story | |
| Up to 500 s.f. | 845.96 |
| Up to 500 s.f. (with Calcs) | 1,127.94 |
| Additional room addition (over 500 s.f.) each 500 s.f. | $820.32 |
| Additional room addition (over 500 s.f. with Calcs) each 500 s.f. | 640.88 |
| Sauna - steam (each) | 666.51 |
| Siding | |
| Stone and Brick Veneer (interior or exterior) up to 400 s.f. | 615.24 |
| All Other up to 400 s.f. | 615.24 |
| Additional siding each 400 s.f. | 307.62 |
| Skylight | |
| Less than 10 s.f. each | 563.97 |
| Greater than 10 s.f. or structural each | 717.78 |
| Spa or Hot Tub (Pre-fabricated) each | 563.97 |
| Stairs - First Flight | 615.24 |
| Each additional flight per flight | 153.81 |
| Storage Racks | |
| 0-8′ high (up to 100 l.f.) first 100 l.f. | 615.24 |
| each additional 100 l.f. each 100 l.f. | 153.81 |
| over 8′ high (up to 100 l.f.) first 100 l.f. | 666.51 |
| each additional 100 l.f. each 100 l.f. | 256.35 |
| Swimming Pool/ |
|
| Vinyl-lined (up to 800 s.f.) each | 615.24 |
| Fiberglass each | 717.78 |
| Gunite (up to 800 s.f.) - Custom and to establish master each | 820.32 |
| Master Plan Coord. - Prod. Unit | 563.97 |
| 1. A mobile home installation on non-foundation system | $1,179.21 |
|---|---|
| Additional pool (over 800 s.f.) each 100 s.f. | 563.97 |
| Commercial pool (up to 800 s.f.) each | 769.05 |
| Commercial pool (over 800 s.f.) | 974.13 |
| Temporary Utility Connection or Occupancy | 461.43 |
| Window or Sliding Glass Door | |
| Replacement each | 461.43 |
| New Window (non-structural) each | 461.43 |
| New window (structural shear wall/ |
$512.70 |
| Bay Window (structural) each | 563.97 |
| Alternate Methods and Materials. | |
| Alternate Methods | |
| Category 1 (repeats and minimal complexity) each | 563.97 |
| Category 2 (moderate complexity) each | 666.51 |
| Category 3 (complex issues) each | 666.51 |
| Category 4 (highly complex) each | 666.51 |
| Alternate Materials | |
| Request to Use Alternate Materials | |
| Standard Flat Fee each | 666.51 |
| Standard Fee (hourly rate in addition to flat fee) per hour | 102.54 |
| ICBO Fee each | 717.78 |
| Board of Appeals (per hour) | 102.54 |
| Other Miscellaneous Fees. | |
| Supplemental Plan Check Fee (per hour) | 102.54 |
| Supplemental Inspection Fee (per hour) | 102.54 |
| Fire Permit Handling Fee (TVA Contract Administration) | 512.70 |
| Change of Contractor | 358.89 |
| Water Wells | 461.43 |
| Monitoring Wells | 461.43 |
| Water Tanks and System | 615.24 |
| Cargo Container | 563.97 |
(Ord. 1386 (part), 2004: Ord. 1355 § 2 (part), 2002)
90902.08 - Plan check fee deposit.¶
A plan check deposit shall be paid at time of application submittal, for all projects which require a plan check process as applicable. The deposit shall be as follows:
| A. Residential projects: | |
|---|---|
| 1. Structures less than 1,000 sq. ft. | $200.00 |
| 2. Structures more than 1,000 sq. ft. | 400.00 |
| B. Commercial/ |
|
| 1. Structures less than 1,500 sq. ft. | 300.00 |
| 2. Structures more than 1,500 sq. ft. | 400.00 |
| 3. All other | 500.00 |
(Ord. 1386 (part), 2004: Ord. 1355 § 2 (part), 2002)
90902.09 - Flood damage prevention regulation appeals board fees (Title 9, Division 16).¶
| A. Review fee for building permits for structures lying within an area of special flood hazard. | $102.54 per hour |
|---|---|
| B. Review fee for applications for subdivisions lying within an area of special flood hazard. | 102.54 per hour |
| C. Fee for appeals or request for waiver to the flood hazard review board. | 102.54 per hour |
| D. Fee for appeals to the board of supervisors. | 692.00 |
(Ord. 1386 (part), 2004: Ord. 1355 § 2 (part), 2002)
90902.10 - NSF checks.¶
If the department receives payment in the form of a check and the check is not redeemable, the department shall charge a re-filing fee equal to double the original amount. All processing and time frames shall be held in abeyance until such time that the full amount has been deposited. The director may waive this provision only if it is determined that the check was non-redeemable through no fault of the applicant.
(Ord. 1386 (part), 2004: Ord. 1355 § 2 (part), 2002)