§ 15.04.070. General.¶
Construction or work for which a permit is required shall be subject to inspection by the building official and all such construction or work shall remain accessible and exposed for inspection purposes until approved. Approval as a result of an inspection shall not be construed to be an approval of a violation of the provisions of this code or of other ordinances of the jurisdiction. Inspections presuming to give authority to violate or cancel the provisions of this code or of other ordinances of the jurisdiction shall not be valid. It shall be the duty of the permit applicant to cause the work to remain accessible and exposed for inspection purposes. Neither the building official nor the jurisdiction shall be liable for expense entailed in the removal or replacement of any material required to allow inspection.
(Ord. 07-08 § 1, 2007; Ord. 11-03 § 1, 2011; Ord. 13-04(B) § 1, 2014; Ord. 23-01 § 1 (Att. A), 2023; Ord. 23-02 § 1 (Att. A), 2023; Ord. 2025-02, 1/12/2026)
§ 15.04.071. Preliminary inspection.¶
Before issuing a permit, the building official is authorized to examine or cause to be examined buildings, structures and sites for which an application has been filed. A survey of the lot may be required by the building official to verify that the structure is located in accordance with the approved plans.
(Ord. 07-08 § 1, 2007; Ord. 11-03 § 1, 2011; Ord. 13-04(B) § 1, 2014; Ord. 23-01 § 1 (Att. A), 2023; Ord. 23-02 § 1 (Att. A), 2023; Ord. 2025-02, 1/12/2026)
§ 15.04.072. Required inspections.¶
The building official, upon notification, shall make the inspections set forth in the following subsections:
A. Foundation and Footing Inspection. Footings and foundation inspections shall be made after excavations for footings are complete and any required reinforcing steel is in place. For concrete foundations, any required forms shall be in place prior to inspection. Materials for the foundation shall be on the job, except where concrete is ready mixed in accordance with ASTM C-94, the concrete need not be on the job.
B. Concrete Slab and Under-Floor Inspection. Concrete slab and under-floor inspections shall be made after in-slab or under-floor reinforcing steel and building service equipment, conduit, piping accessories and other ancillary equipment items are in place, but before any concrete is placed or floor sheathing installed, including the subfloor.
C. Lowest Floor Elevation. In floor hazard areas, upon placement of the lowest floor, including the basement, and prior to further vertical construction, the elevation certification required in CBC Section 1612.5 shall be submitted to the building official.
D. Frame Inspection. Framing inspections shall be made after the roof deck or sheathing, all framing, fire blocking and bracing are in place and pipes, chimneys and vents to be concealed are complete and the rough electrical, plumbing, heating wires, pipes and ducts are approved.
E. Lath or Gypsum Board Inspection. Lath and gypsum board inspections shall be made after lathing and gypsum board, interior and exterior, are in place, but before any plastering is applied or before gypsum board joints and fasteners are taped and finished.
Exception: Gypsum board that is not part of a fire-resistance-rated assembly or shear assembly.
F. Fire-Resistant Penetrations. Protection of joints and penetrations in fire-resistance-rated assemblies shall not be concealed from view until inspected and approved.
G. Energy Efficiency Inspections. Inspections shall be made to determine compliance with the California Energy Code and shall include, but not be limited to, inspections for: envelope insulation R and U values, fenestration U value, duct system R value, and HVAC and water-heating equipment efficiency.
H. CalGreen Tier 1 Inspections. Inspections shall be made to determine compliance with the California Green Building Standards Code and shall include both mandatory measures, as well as the Tier 1 measures of Appendix A4.
I. Other Inspections. In addition to the inspections specified above, the building official is authorized to make or require other inspections of any construction work to ascertain compliance with the provisions of this code and other laws that are enforced by the department of building safety.
J. Special Inspections. For special inspections, see CBC Chapter 17.
K. Final Inspection. The final inspection shall be made after all work required by the building permit is completed and all other specific requirements of the project are approved.
(Ord. 07-08 § 1, 2007; Ord. 11-03 § 1 , 2011; Ord. 13-04(B) § 1, 2014; Ord. 23-01 § 1 (Att. A), 2023; Ord. 23-02 § 1 (Att. A), 2023; Ord. 2025-02, 1/12/2026)
§ 15.04.073. Inspection agencies.¶
The building official is authorized to accept reports of approved inspection agencies, provided such agencies satisfy the requirements as to qualifications and reliability.
(Ord. 07-08 § 1, 2007; Ord. 11-03 § 1, 2011; Ord. 13-04(B) § 1, 2014; Ord. 23-01 § 1 (Att. A), 2023; Ord. 23-02 § 1 (Att. A), 2023; Ord. 2025-02, 1/12/2026)
§ 15.04.074. Inspection requests.¶
It shall be the duty of the holder of the building permit or their duly authorized agent to notify the building official when work is ready for inspection. The building official may require that every request for inspection be filed at least one working day before such inspection is desired. Such request may be in writing or by telephone at the option of the building official. It shall be the duty of the permit holder to provide access to and means for inspection of such work that are required by this code.
(Ord. 07-08 § 1, 2007; Ord. 11-03 § 1, 2011; Ord. 13-04(B) § 1, 2014; Ord. 23-01 § 1 (Att. A), 2023; Ord. 23-02 § 1 (Att. A), 2023; Ord. 2025-02, 1/12/2026)
§ 15.04.075. Approval required.¶
Work shall not be done beyond the point indicated in each successive inspection without first obtaining the approval of the building official. The building official, upon notification, shall make the requested inspections and shall either indicate that portion of the construction is satisfactory as completed, or shall notify the permit holder or his or her agent wherein the same fails to comply with this code. Any portions that do not comply shall be corrected and such portion shall not be covered or concealed until authorized by the building official.
(Ord. 07-08 § 1, 2007; Ord. 11-03 § 1, 2011; Ord. 13-04(B) § 1, 2014; Ord. 23-01 § 1 (Att. A), 2023; Ord. 23-02 § 1 (Att. A), 2023; Ord. 2025-02, 1/12/2026)