Chapter 16.12 — PERMITS AND PROCEDURES
Hesperia Municipal Code · 2026-09 edition · updated 2026-10-02 · Hesperia
In this part
- Article I — GENERAL PROCEDURES
- Article II — SITE PLANS AND REVISED SITE PLANS
- Article III — CONDITIONAL USE PERMITS
- Article IV — PLANNED DEVELOPMENTS
- Article V — ZONE CHANGES, GENERAL PLAN AMENDMENTS, AND SPECIFIC PLAN AMENDMENTS
- Article VI — VARIANCES AND MINOR EXCEPTIONS
- Article VII — DEVELOPMENT CODE AMENDMENTS
- Article VIII — USE DETERMINATION BY THE PLANNING COMMISSION
- Article IX — NONCONFORMING USES, BUILDINGS AND STRUCTURES
- Article X — SPECIAL USES
- Article XI — SPECIAL EVENTS AND TEMPORARY USES
- Article XII — SUBDIVISION REVIEW PROCEDURES
- Article XIII — CEQA GUIDELINES
- Article XIV — PERMITS REQUIRED
Get a plain-English answer with a citation back to this text.
Ask AI about this code