Title 13 — WATER AND SEWAGE

Chapter 13.28 — SEWER CONSTRUCTION–LATERAL SEWERS AND CONNECTIONS

Half Moon Bay Municipal Code · 2026-07 edition · updated 2026-10-02 · Half Moon Bay

§ 13.28.010. Permit required.

§ 13.28.020. Construction requirements–Compliance required.

§ 13.28.030. Minimum size and slope.

§ 13.28.040. Separate sewers–When required.

§ 13.28.050. Use of old building sewers.

§ 13.28.060. Cleanouts required.

§ 13.28.065. Check valve.

§ 13.28.070. Sewage lifted by artificial means.

§ 13.28.080. Connection to public sewer.

§ 13.28.090. Barricading of excavation.

§ 13.28.100. Maintenance of side sewer.