Skip to content

Title 9 — PUBLIC WAYS AND PROPERTY

Chapter 9.04 — EXCAVATIONS

Gonzales Municipal Code · 2026-07 edition · updated 2026-10-02 · Gonzales

§ 9.04.010. PERMIT REQUIRED; DEPOSIT; BOND:

§ 9.04.020. PREREQUISITES TO PERMIT ISSUANCE; FEE:

§ 9.04.030. CONDITIONS FOR PERMIT ISSUANCE; COMPLETION OF WORK:

§ 9.04.040. SUPERVISION REQUIRED:

§ 9.04.050. RESURFACING COSTS:

§ 9.04.060. REPORTS REQUIRED:

§ 9.04.070. INSURANCE REQUIREMENTS:

§ 9.04.080. REFILLING AND REPAVING SPECIFICATIONS:

§ 9.04.090. DUTIES OF PERMITTEE CONCERNING EXCAVATIONS:

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — Gonzales Municipal Code

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.