§ 27E.13. Designation of the floodplain administrator.

The director of public works or his or her designee is hereby appointed to administer, implement, and enforce this chapter by granting or denying development permits in accord with its provisions.

(Ord. No. 2017-01, § 2, 1-9-2017)

Exceptions & meaning →

§ 27E.14. Duties and responsibilities of the floodplain administrator.

The duties and responsibilities of the floodplain administrator shall include, but not be limited to, the following:

(a) Permit Review. Review all development permits to determine:

(1) Permit requirements of this chapter have been satisfied, including determination of substantial improvement and substantial damage of existing structures;

(2) All other required state and federal permits have been obtained;

(3) The site is reasonably safe from flooding;

(4) The proposed development does not adversely affect the carrying capacity of areas where base flood elevations have been determined but a floodway has not been designated. This means that the cumulative effect of the proposed development when combined with all other existing and anticipated development will not increase the water surface elevation of the base flood more than one (1) foot at any point within the City of Gilroy; and

(5) All letters of map revision (LOMRs) for flood control projects are approved prior to the issuance of building permits. Building permits must not be issued based on conditional letters of map revision (CLOMRs). Approved CLOMRs allow construction of the proposed flood control project and land preparation as specified in the “start of construction” definition.

(b) Development of Substantial Improvement and Substantial Damage Procedures.

(1) Using FEMA publication FEMA 213, “Answers to Questions About Substantially Damaged Buildings,” develop detailed procedures for identifying and administering requirements for substantial improvement and substantial damage, to include defining “market value.”

(2) Assure procedures are coordinated with other departments/divisions and implemented by community staff.

(c) Review, Use and Development of Other Base Flood Data. When base flood elevation data has not been provided in accordance with section 27E.7, the floodplain administrator shall obtain, review, and reasonably utilize any base flood elevation and floodway data available from a federal or state agency, or other source, in order to administer Article V of this chapter.

All new developments located in an area without a base flood elevation specified on the FIRM shall provide the floodplain administrator with a proposed base flood elevation from an acceptable source. At the discretion of the floodplain administrator, the applicant may be required to provide a hydrologic and hydraulic engineering analysis that generates base flood elevations and floodway boundaries for the development proposal. The applicant shall be responsible for the peer review costs associated with the floodplain administrator’s review of the flood analysis.

Note: A base flood elevation may be obtained using one (1) of two (2) methods from the FEMA publication FEMA 265, “Managing Floodplain Development in Approximate Zone A Areas—A Guide for Obtaining and Developing Base (100-Year) Flood Elevations” dated July 1995, and subsequent amendments and/or revisions thereto.

(d) Notification of Other Agencies.

(1) Alteration or Relocation of a Watercourse.

a. Notify adjacent communities and the California Department of Water Resources prior to alteration or relocation;

b. Submit evidence of such notification to the Federal Emergency Management Agency; and

c. Assure that the flood carrying capacity within the altered or relocated portion of said watercourse is maintained.

(2) Base Flood Elevation Changes Due to Physical Alterations.

a. Within six (6) months of information becoming available or project completion, whichever comes first, the floodplain administrator shall submit or assure that the permit applicant submits technical or scientific data to FEMA for a letter of map revision (LOMR).

b. All LOMRs for flood control projects are approved prior to the issuance of building permits. Building permits must not be issued based on conditional letters of map revision (CLOMRs). Approved CLOMRs allow construction of the proposed flood control project and land preparation as specified in the “start of construction” definition.

Such submissions are necessary so that upon confirmation of those physical changes affecting flooding conditions, risk premium rates and floodplain management requirements are based on current data.

(3) Changes in Corporate Boundaries. Notify FEMA in writing whenever the corporate boundaries have been modified by annexation or other means and include a copy of a map of the community clearly delineating the new corporate limits.

(e) Documentation of Floodplain Development. Obtain and maintain for public inspection and make available as needed the following:

(1) Certification required by sections 27E.17(c)(1) and 27E.20 (lowest floor elevations);

(2) Certification required by section 27E.17(c)(2) (elevation or floodproofing of nonresidential and mixed-use structures);

(3) Certification required by section 27E.17(c)(3) (wet floodproofing standard);

(4) Certification of elevation required by section 27E.19(a)(3) (subdivisions and other proposed development standards);

(5) Certification required by section 27E.22(b) (floodway encroachments); and

(6) Maintain a record of all variance actions, including justification for their issuance, and report such variances issued in its biennial report submitted to the Federal Emergency Management Agency.

(f) Map Determination. Make interpretations where needed, as to the exact location of the boundaries of the areas of special flood hazard, where there appears to be a conflict between a mapped boundary and actual field conditions. The person contesting the location of the boundary shall be given a reasonable opportunity to appeal the interpretation as provided in section 27E.16.

(g) Remedial Action. Take action to remedy violations of this chapter as specified in section 27E.8.

(h) Biennial Report. Complete and submit biennial report to FEMA.

(i) Planning. Assure community’s general plan is consistent with floodplain management objectives herein.

(Ord. No. 2017-01, § 2, 1-9-2017)

Exceptions & meaning →

§ 27E.15. Development permit.

A development permit shall be obtained before any construction or other development, including manufactured homes, within any area of special flood hazard established in section 27E.7. Application for a development permit shall be made on forms furnished by the City of Gilroy. The applicant shall provide the following minimum information:

(a) Plans drawn to scale, showing:

(1) Location, dimensions, and elevation of the area in question, existing or proposed structures, storage of materials and equipment and their location;

(2) Proposed locations of water supply, sanitary sewer, and other utilities;

(3) Grading information showing existing and proposed contours, any proposed fill, and drainage facilities;

(4) Location of the regulatory floodway when applicable;

(5) Base flood elevation information as specified in section 27E.7 or 27E.14(c);

(6) Proposed elevation in relation to mean sea level, of the lowest floor (including basement) of all structures; and

(7) Proposed elevation in relation to mean sea level to which any nonresidential or mixed-use structure will be floodproofed, as required in section 27E.17(c)(2) and detailed in FEMA Technical Bulletin TB 3-93 and subsequent amendments and/or revisions thereto.

(b) Certification from a registered civil engineer or architect that the nonresidential or mixed-use, floodproofed building meets the floodproofing criteria in section 27E.17(c)(2).

(c) For a crawlspace foundation, location and total net area of foundation openings (if applicable) as required in section 27E.17(c)(3) and detailed in FEMA Technical Bulletins 1-93 and 7-93, and subsequent amendments and/or revisions thereto. Refer to section 27E.17(c)(6) for additional requirements for crawlspaces.

(d) Description of the extent to which any watercourse will be altered or relocated as a result of proposed development.

(e) All appropriate certifications listed in section 27E.14(e).

(f) Additional, special flood studies as required by the floodplain administrator.

(Ord. No. 2017-01, § 2, 1-9-2017)

Exceptions & meaning →

§ 27E.16. Appeals.

The city council of the City of Gilroy shall hear and decide appeals when it is alleged there is an error in any requirement, decision, or determination made by the floodplain administrator in the enforcement or administration of this chapter.

(Ord. No. 2017-01, § 2, 1-9-2017)

Exceptions & meaning →

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — Gilroy Municipal Code

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.