Chapter 13.40 — PERMITS AND FEES
Fortuna Municipal Code · 2026-07 edition · updated 2026-10-02 · Fortuna
§ 13.40.010. Required for all work.¶
§ 13.40.020. Application.¶
§ 13.40.030. Compliance required – Changes in permit.¶
§ 13.40.040. Applicant's signature constitutes agreement.¶
§ 13.40.050. Fees – Established by resolution.¶
§ 13.40.060. Special connection charges.¶
§ 13.40.065. Connection fees – Deferred payment.¶
§ 13.40.070. Bonding required.¶
§ 13.40.080. Inspection of work – Issuance of certificate.¶
§ 13.40.090. Notification that work is ready for inspection.¶
§ 13.40.100. Condemned work.¶
§ 13.40.110. All costs paid by owner.¶
§ 13.40.120. Street excavation permit.¶
§ 13.40.130. Liability.¶
§ 13.40.140. Time limit on permits.¶
§ 13.40.150. Pretreatment charges and fees.¶
Get a plain-English answer with a citation back to this text.
Ask AI about this code