Skip to content

Title 13 — UTILITIES

Chapter 13.40 — PERMITS AND FEES

Fortuna Municipal Code · 2026-07 edition · updated 2026-10-02 · Fortuna

§ 13.40.010. Required for all work.

§ 13.40.020. Application.

§ 13.40.030. Compliance required – Changes in permit.

§ 13.40.040. Applicant's signature constitutes agreement.

§ 13.40.050. Fees – Established by resolution.

§ 13.40.060. Special connection charges.

§ 13.40.065. Connection fees – Deferred payment.

§ 13.40.070. Bonding required.

§ 13.40.080. Inspection of work – Issuance of certificate.

§ 13.40.090. Notification that work is ready for inspection.

§ 13.40.100. Condemned work.

§ 13.40.110. All costs paid by owner.

§ 13.40.120. Street excavation permit.

§ 13.40.130. Liability.

§ 13.40.140. Time limit on permits.

§ 13.40.150. Pretreatment charges and fees.

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — Fortuna Municipal Code

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.