Chapter 17.62
Fort Bragg Zoning Code · 2026-07 edition · updated 2026-09-09 · Fort Bragg
17.62.030 - Erosion, Sediment, and Other Construction Pollution Control¶
17.62.040 - Excavations and Fills¶
17.62.050 - Grading During the Rainy Season¶
17.62.060 - Removal of Native Vegetation¶
17.62.070 - Revegetation and Slope Surface Stabilization¶
17.62.080 - Protection of Watercourses¶
17.62.090 - Setbacks for Cut and Fill Slopes¶
17.62.100 - Storm Drainage and Runoff¶
Get a plain-English answer with a citation back to this text.
Ask AI about this code