Division 2 — GENERAL DEVELOPMENT STANDARDS
Sec. 30-412. - Conformance and permits required.
Fontana Zoning Code · 2026-06 edition · updated 2026-07-25 · Fontana
No building or structure shall be erected, reconstructed, structurally altered, enlarged, repaired, moved, or maintained, nor shall any building, structure or land be used or designed to be used for any purpose other than those permitted in the zone in which such building, structure, or land is to be located, and then only after all permits and licenses required by this Code and all laws and other ordinances have been applied for and secured, and all other provisions of this Code or other law are complied with. Any permit issued in violation of, in error, or in conflict with the requirements of this section notion shall be considered null and void.
Get a plain-English answer with a citation back to this text.
Ask AI about this code▸ Contents — Fontana Zoning Code
- Chapter 30 — ZONING AND DEVELOPMENT CODE
- Division 3 — MARIJUANA USES
- Division 4 — HEARING BODIES AND NOTIFICATION
- Division 6 — GENERAL PLAN AMENDMENT
- Division 7 — DEVELOPMENT CODE AND ZONING DISTRICT MAP AMENDMENT
- Division 8 — AREA PLAN AND AREA PLAN AMENDMENT
- Division 9 — SPECIFIC PLAN AMENDMENT
- Division 18 — TEMPORARY USE
- Division 20 — DESIGN REVIEW SIGN
- Division 25 — DENSITY BONUS
- Division 26 — CERTIFICATE OF OCCUPANCY
- Division 3 — PERMITTED LAND USES
- Division 8 — DESIGN AND ARCHITECTURAL REGULATIONS
-
▸ Division 2 — GENERAL DEVELOPMENT STANDARDS
- Division 2 — DEVELOPMENT POLICIES
- Division 8 — RESIDENTIAL PLANNED COMMUNITIES
- Division 2 — DEVELOPMENT POLICIES
- Division 5 — DEVELOPMENT STANDARDS FOR ACCESSORY STRUCTURES AN…
- Division 7 — DESIGN GUIDELINES
- Division 8 — TRANSPORTATION DEMAND MANAGEMENT AND TRIP REDUCTI…
- Division 3 — USE REGULATIONS
- Division 6 — PERFORMANCE STANDARDS
- Division 2 — DEVELOPMENT POLICIES
- Division 4 — DESIGN REVIEW SIGN REQUIREMENTS
- Division 6 — PERMANENT SIGNS
- Division 7 — TEMPORARY SIGNS
- Division 9 — SIGNS ON PUBLIC PROPERTY
- Division 3 — DESIGN AND OPERATION REQUIREMENTS
- Division 5 — ABANDONMENT
- Division 6 — SUSPENSION OR REVOCATION