§ 15-5. CONSTRUCTION OF OFF-SITE WATER MAINS.
Firebaugh Municipal Code · 2026-07 edition · updated 2026-10-02 · Firebaugh
§ 15-5.1. Developer to Assume Cost of Water Main Extensions. [Ord. 81-7, S1]¶
§ 15-5.2. Approval of Plans by Engineer; Cost of Distributing Mains Not to Be Included…¶
§ 15-5.3. Procedure for Construction of Off-Site Mains; Ownership After Completion by…¶
§ 15-5.4. Agreement Regarding Reimbursement to the Developer for Costs in Excess…¶
§ 15-5.5. Connection Charges for Adjacent Property to Reimburse Original Developer.…¶
§ 15-5.6. Engineering Costs and Inspection Charges to be Included in Construction…¶
Get a plain-English answer with a citation back to this text.
Ask AI about this code