Article 22.20 — CONNECTION CHARGES (CAPACITY)
Fairfield Municipal Code · 2026-09 edition · updated 2026-10-02 · Fairfield
§ 22.20.010. Purpose.¶
§ 22.20.020. Authority of city to impose.¶
§ 22.20.030. Capacity associated with connection charge.¶
§ 22.20.040. Establishment; time payable.¶
§ 22.20.050. Amount.¶
§ 22.20.060. Meter capacity sizing.¶
§ 22.20.070. Exemptions.¶
§ 22.20.080. Charge for alteration or change of meter size.¶
§ 22.20.090. Use of proceeds.¶
§ 22.20.100. No refunds.¶
Get a plain-English answer with a citation back to this text.
Ask AI about this code