Skip to content

Earlier editions: 2026-07

Title 8 — HEALTH AND SAFETY

Fairfax Municipal Code Ch. 8.60 Recycling Areas Required for Development Projects

Fairfax Municipal Code · 2026-10 edition · updated 2026-10-04 · Fairfax

Cite as: Fairfax Municipal Code Chapter 8.60 · Text as of 2026-10-04

§ 8.60.010 PURPOSE.

In order to promote sustainability through source reduction, recycling, and composting activities, the Town of Fairfax proposes to adopt this recycling space allocation chapter.

Fairfax encourages the participation of the residential, commercial, industrial, and public sectors in recycling of solid waste.

The lack of adequate areas for collecting and loading recyclable materials that are compatible with surrounding land uses is a significant impediment to diverting solid waste and constitutes a need for Fairfax to address access to solid waste for source reduction, recycling, and composting activities. This chapter has been developed to meet that need.

(Ord. 717, passed 9-6-2006)

Exceptions & meaning →

§ 8.60.020 DEFINITIONS.

For the purpose of this chapter, the following definitions shall apply unless the context clearly indicates or requires a different meaning.

DEVELOPMENT PROJECT. Any of the following:

(1) A project for which a building permit is required for a commercial, industrial, or institutional building, or residential building having five or more living units, where solid waste is collected and loaded and any residential project where solid waste is collected and loaded in a location serving five or more living units.

(2) Any new public facility where solid waste is collected and loaded and any improvements for areas of a public facility used for collecting and loading solid waste.

(3) The definition of DEVELOPMENT PROJECT only includes subdivisions or tracts of single-family detached homes if, within such subdivisions or tract, there is an area where solid waste is collected and loaded in a location which serves five or more living units. In such instances, recycling areas as specified in this chapter are only required to serve the needs of the living units which utilize the solid waste collection and loading area.

IMPROVEMENT. An improvement adds to the value of a facility, prolongs its useful life, or adapts it to new uses. Improvements should be distinguished from repairs. Repairs keep facilities in good operating condition, do not materially add to the value of the facility, and do not substantially extend the life of the facility.

PUBLIC FACILITY. The definition of public facility includes, but is not limited to buildings, structures and outdoor recreation areas owned by a local agency.

RECYCLING AREA. Space allocated for collecting and loading of recyclable materials. Such areas shall have the ability to accommodate receptacles for recyclable materials. Recycling areas shall be accessible and convenient for those who deposit as well as those who collect and load any recyclable materials placed therein.

(Ord. 717, passed 9-6-2006)

Exceptions & meaning →

§ 8.60.030 GENERAL REQUIREMENTS.

(A) Any new development project for which an application for a building permit is submitted on or after the effective date of the ordinance codified in this chapter shall include adequate, accessible, and convenient areas for collecting and loading recyclable materials.

(B) Any improvements for areas of a public facility used for collecting and loading solid waste shall include adequate, accessible, and convenient areas for collecting and loading recyclable materials.

(C) Any existing development project for which an application for a building permit is submitted on or after the effective date of the ordinance codified in this chapter or a single alteration which is subsequently performed that adds 30 percent or more to the existing floor area of the development project shall provide adequate, accessible, and convenient areas for collecting and loading recyclable materials.

(D) Any existing development project for which an application for a building permit is submitted on or after the effective date of the ordinance codified in this chapter for multiple alterations which are conducted within a 12-month period which collectively add 30 percent or more to the existing floor area of the development project shall provide adequate, accessible, and convenient areas for collecting and loading recyclable materials.

(E) Any existing development project for which multiple applications for building permits are submitted within a 12-month period beginning on or after the effective date of the ordinance codified in this chapter for multiple alterations which are subsequently performed that collectively add 30 percent or more to the existing floor area of the development project shall provide adequate, accessible, and convenient areas for collecting and loading recyclable materials.

(F) Any existing development project occupied by multiple tenants, one of which submits on or after the effective date of the ordinance codified in this chapter an application for a building permit for a single alteration which is subsequently performed that adds 30 percent or more to the existing floor area of that portion of the development project which said tenant leases shall provide adequate, accessible, and convenient areas for collecting and loading recyclable materials. Such recycling areas shall, at a minimum, be sufficient in capacity, number, and distribution to serve that portion of the development project which said tenant leases.

(G) Any existing development project occupied by multiple tenants, one of which submits on or after the effective date of the ordinance codified in this chapter an application for a building permit for multiple alterations which are conducted within a 12- month period which collectively add 30 percent or more to the existing floor area of that portion of the development project which said tenant leases shall provide adequate, accessible, and convenient areas for collecting and loading recyclable materials. Such recycling areas shall, at a minimum, be sufficient in capacity, number, and distribution to serve that portion of the development project which said tenant leases.

(H) Any existing development project occupied by multiple tenants, one of which submits within a 12- month period beginning on or after the effective date of the ordinance codified in this chapter multiple applications for building permits for multiple alterations which are subsequently performed that collectively add 30 percent or more to the existing floor area of that portion of the development project which said tenant leases shall provide adequate, accessible, and convenient areas for collecting and loading recyclable materials. Such recycling areas shall, at a minimum, be sufficient in capacity, number, and distribution to serve that portion of the development project which said tenant leases.

(I) Any costs associated with adding recycling space to existing development projects shall be the responsibility of the party or parties who are responsible for financing the alterations.

(Ord. 717, passed 9-6-2006)

Exceptions & meaning →

§ 8.60.040 GUIDELINES FOR ALL DEVELOPMENT PROJECTS.

(A) Recycling areas should be designed to be architecturally compatible with nearby structures and with the existing topography and vegetation, in accordance with such standards.

(B) The design and construction of recycling areas shall not prevent security of any recyclable materials placed therein.

(C) The design, construction, and location of recycling areas shall not be in conflict with any applicable federal, state, or local laws relating to fire, building, access, transportation, circulation, or safety.

(D) Recycling areas or the bins or containers placed therein must provide protection against adverse environmental conditions, such as rain, which might render the collected materials unmarketable.

(E) Driveways and/or alleys and parking lot travel aisles shall, at a minimum, conform to local building-code requirements for garbage collection access and clearance. In the absence of such building- code requirements, driveways and/or travel aisles should provide unobstructed access for collection vehicles and personnel.

(F) A sign clearly identifying all recycling and solid waste collection and loading areas and the materials accepted therein shall be posted adjacent to all points of direct access to the recycling areas.

(G) Developments and transportation corridors adjacent to recycling areas shall be adequately protected for any adverse impacts such as noise, odor, vectors, or glare through measures including, but not limited to maintaining adequate separation, fencing, and landscaping.

(Ord. 717, passed 9-6-2006)

Exceptions & meaning →

§ 8.60.050 ADDITIONAL GUIDELINES FOR SINGLE-TENANT DEVELOPMENT PROJECTS.

(A) Areas for recycling shall be adequate in capacity, number, and distribution to serve the development project.

(B) Dimensions of the recycling area shall accommodate receptacles sufficient to meet the recycling needs of the development project.

(C) An adequate number of bins or containers to allow for the collection and loading of recyclable materials generated by the development project should be located within the recycling area.

(Ord. 717, passed 9-6-2006)

Exceptions & meaning →

§ 8.60.060 ADDITIONAL GUIDELINES FOR MULTIPLE-TENANT DEVELOPMENT PROJECTS.

(A) Recycling areas shall, at a minimum, be sufficient in capacity, number, and distribution to serve that portion of the development project leased by the tenant(s) who submitted an application or applications resulting in the need to provide recycling area(s) pursuant to § 8.60.030.

(B) Dimensions of recycling areas shall accommodate receptacles sufficient to meet the recycling needs of that portion of the development project leased by the tenant who submitted an application or applications resulting in the need to provide recycling area(s) pursuant to § 8.60.030.

(C) An adequate number of bins or containers to allow for the collection and loading of recyclable materials generated by that portion of the development project leased by the tenant(s) who submitted an application or applications resulting in the need to provide recycling area pursuant to § 8.60.030 should be located within the recycling area.

(Ord. 717, passed 9-6-2006)

Exceptions & meaning →

§ 8.60.070 LOCATION.

(A) Recycling areas shall not be located in any area required to be constructed or maintained as unencumbered, according to any applicable federal, state, or local laws relating to fire, access, building, transportation, circulation, or safety.

(B) Any and all recycling area(s) shall be located so they are at least as convenient for those persons who deposit, collect, and load the recyclable materials placed therein as the location(s) where solid waste is collected and loaded. Whenever feasible, areas for collecting and loading recyclable materials shall be adjacent to the solid waste collection areas.

(Ord. 717, passed 9-6-2006)

Exceptions & meaning →

§ 8.60.080 DECLARATION OF SEVERABILITY.

All provisions of this chapter are severable and, if for any reason any sentence, paragraph, or section of this chapter shall be held invalid, such decision shall not affect the validity of the remaining parts of the chapter.

(Ord. 717, passed 9-6-2006)

Exceptions & meaning →

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — Fairfax Municipal Code

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.