§ 6-471. Definitions.
Escondido Zoning Code · 2026-05 edition · updated 2026-07-25 · Escondido
Unless specifically defined below, words or phrases used in this article shall be interpreted so as to give them the meaning they have in common usage and to give this article its most reasonable application.
A zone. See " Special flood hazard area ."
"Accessory structure" means a structure that is either:
(1) Solely for the parking of no more than two cars; or
(2) A small, low cost shed for limited storage, less than 150 square feet and $1,500 in value.
"Accessory use" means a use which is incidental and subordinate to the principal use of the parcel of land on which it is located.
"Alluvial fan" means a geomorphologic feature characterized by a cone or fan-shaped deposit of boulders, gravel, and fine sediments that have been eroded from mountain slopes, transported by flood flows, and then deposited on the valley floors, and which is subject to flash flooding, high velocity flows, debris flows, erosion, sediment movement and deposition, and channel migration.
"Apex" means a point on an alluvial fan or similar landform below which the flow path of the major stream that formed the fan becomes unpredictable and alluvial fan flooding can occur.
"Appeal" means a request for a review of the floodplain administrator's interpretation of any provision of this article.
Downloaded from https://ecode360.com/ES4926 on 2026-05-23
City of Escondido, CA
ESCONDIDO CODE
§ 6-471
§ 6-471
"Area of shallow flooding" means a designated AO or AH zone on the flood insurance rate map (FIRM). The base flood depths range from one to three feet; a clearly defined channel does not exist; the path of flooding is unpredictable and indeterminate; and velocity flow may be evident. Such flooding is characterized by ponding or sheet flow.
Area of special flood hazard. See " Special flood hazard area ."
"Base flood" means a flood which has a one percent chance of being equaled or exceeded in any given year (also called the " 100-year flood "). Base flood is the term used throughout this article.
"Base flood elevation (BFE)" means the elevation shown on the flood insurance rate map for zones AE, AH, A1-30, VE and V1-V30 that indicates the water surface elevation resulting from a flood that has a 1% or greater chance of being equaled or exceeded in any given year.
"Basement" means any area of the building having its floor subgrade, i.e., below ground level, on all sides.
Building. See " Structure ."
"Development" means any man-made change to improved or unimproved real estate, including, but not limited to, buildings or other structures, mining, dredging, filling, grading, paving, excavation or drilling operations or storage of equipment or materials.
"Encroachment" means the advance or infringement of uses, plant growth, fill, excavation, buildings, permanent structures or development into a floodplain which may impede or alter the flow capacity of a floodplain.
"Existing manufactured home park or subdivision" means a manufactured home park or subdivision for which the construction of facilities for servicing the lots on which the manufactured homes are to be affixed (including, at a minimum, the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads) is completed before the 13th day of January, 1993.
"Expansion to an existing manufactured home park or subdivision" means the preparation of additional sites by the construction of facilities for servicing the lots on which the manufactured homes are to be affixed (including the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads).
"Flood, flooding, or flood water" means:
(1) A general and temporary condition of partial or complete inundation of normally dry land areas from the overflow of inland or tidal waters; the unusual and rapid accumulation or runoff of surface waters from any source; and/or mudslides (i.e., mudflows); and
(2) The condition resulting from flood-related erosion.
"Flood Boundary and Floodway Map (FBFM)" means the official map on which the Federal Emergency Management Agency or Federal Insurance Administration has delineated both the areas of special flood hazards and the floodway.
"Flood Insurance Rate Map (FIRM)" means the official map on which the Federal Emergency Management Agency or Federal Insurance Administration has delineated both the areas of special flood hazards and the risk premium zones applicable to the community.
"Flood Insurance Study" means the official report provided by the Federal Insurance Administration that includes flood profiles, the flood insurance rate map, the flood boundary and floodway map, and the water surface elevation of the base flood.
Downloaded from https://ecode360.com/ES4926 on 2026-05-23
City of Escondido, CA § 6-471
BUILDINGS AND BUILDING REGULATIONS
Get a plain-English answer with a citation back to this text.
Ask AI about this code▸ Contents — Escondido Zoning Code
- Chapter 6
-
▸ Division 2 — Routing
Overview- § 6-339. When permit required.
- § 6-340. Eligible to receive permit.
- § 6-341. Filing of permit application.
- § 6-342. Application for permit to be in duplicate; contents.
- § 6-343. Permit fee.
- § 6-344. Bond prerequisite to issuance of permit; amount.
- § 6-345. When licensed mover not required.
- § 6-346. Arrangements to protect overhead utilities prerequisi…
- § 6-347. Authority of street superintendent.
- § 6-348. Use of alternate route to move building or structure.
- § 6-349. Safety requirements of mover following removal.
- § 6-350. Damage to streets, public property generally.
- § 6-351. Interference with public utility property.
- § 6-352. Conditions of issuance of permit.
- Article 13 — SOIL INVESTIGATION
- Article 14 — (RESERVED)
- Article 16 — TRAILERS AND MOBILEHOMES
- Article 17 — DEVELOPMENT FEE PROCEDURES
- Article 18A — TRAFFIC AND TRANSPORTATION FACILITIES DEVELOPMEN…
- Article 18B — PUBLIC FACILITY DEVELOPMENT FEE
- Article 18C — PARK AND RECREATION FACILITIES DEVELOPMENT FEE
- Article 18D — LOCAL DRAINAGE AND SANITARY SEWER FEES
-
▸ Article 19 — PROCEDURES FOR FLOODPLAIN MANAGEMENT
Overview- § 6-470. Statutory authorization.
- § 6-471 and
- § 6-471. Definitions.
- § 6-471 "Floodplain or flood-prone area" means any land area s…
- § 6-472. Lands to which this article applies.
- § 6-473. Designation of the floodplain administrator.
- § 6-474 - (2) Proposed locations of water supply, sanitary sew…
- § 6-474. Standards of construction.
- § 6-474 entering or accumulating within the components during …
- § 6-475. Nature of variances.
- § 6-476 - (5) Necessity to the facility of a waterfront locati…
- Article 20 — PROPERTY MAINTENANCE
- Chapter 11
- Division 2 — Weed and Rubbish Abatement Program
- Division 1 — Generally
- Division 1
- Division 2 — Variances and Administrative Adjustments
- Division 3 — Nonconforming Uses and Structures
- Division 4 — Amendments and Zone Changes
- Division 5 — Reasonable Accommodation
- Division 6 — Public Hearings, Notices, Fees and Appeals
- Division 7 — Enforcement and Penalties
- Division 8 — Plot Plans
- Division 9 — Zoning Administrator