Skip to content

Division 2 — RoutingArticle 13 — SOIL INVESTIGATION

§ 6-366. Contents of preliminary report.

Escondido Zoning Code · 2026-05 edition · updated 2026-07-25 · Escondido

A preliminary soil report required by section 6-364 shall contain the following:

  • (1) A certification that the engineer has investigated the soil within the subdivision;

  • (2) Locations of the borings or excavations made;

  • (3) Summaries of field and laboratory tests made; and

  • (4) A statement of the qualities of the soil and its expansive characteristics or other soil problems which, if not corrected, would lead to structural defects of dwellings constructed upon such soil.

(Code 1957, § 8501)

Downloaded from https://ecode360.com/ES4926 on 2026-05-23

City of Escondido, CA § 6-367

ESCONDIDO CODE

§ 6-371

Get a plain-English answer with a citation back to this text.

Ask AI about this code
Contents — Escondido Zoning Code
Escondido Zoning Code
  1. Chapter 6
  2. Division 2 — Routing
    Overview
    1. § 6-339. When permit required.
    2. § 6-340. Eligible to receive permit.
    3. § 6-341. Filing of permit application.
    4. § 6-342. Application for permit to be in duplicate; contents.
    5. § 6-343. Permit fee.
    6. § 6-344. Bond prerequisite to issuance of permit; amount.
    7. § 6-345. When licensed mover not required.
    8. § 6-346. Arrangements to protect overhead utilities prerequisi…
    9. § 6-347. Authority of street superintendent.
    10. § 6-348. Use of alternate route to move building or structure.
    11. § 6-349. Safety requirements of mover following removal.
    12. § 6-350. Damage to streets, public property generally.
    13. § 6-351. Interference with public utility property.
    14. § 6-352. Conditions of issuance of permit.
    15. Article 13 — SOIL INVESTIGATION
    16. Article 14 — (RESERVED)
    17. Article 16 — TRAILERS AND MOBILEHOMES
    18. Article 17 — DEVELOPMENT FEE PROCEDURES
    19. Article 18A — TRAFFIC AND TRANSPORTATION FACILITIES DEVELOPMEN…
    20. Article 18B — PUBLIC FACILITY DEVELOPMENT FEE
    21. Article 18C — PARK AND RECREATION FACILITIES DEVELOPMENT FEE
    22. Article 18D — LOCAL DRAINAGE AND SANITARY SEWER FEES
    23. Article 19 — PROCEDURES FOR FLOODPLAIN MANAGEMENT
    24. Article 20 — PROPERTY MAINTENANCE
    25. Chapter 11
  3. Division 2 — Weed and Rubbish Abatement Program
  4. Division 1 — Generally
  5. Division 1
  6. Division 2 — Variances and Administrative Adjustments
  7. Division 3 — Nonconforming Uses and Structures
  8. Division 4 — Amendments and Zone Changes
  9. Division 5 — Reasonable Accommodation
  10. Division 6 — Public Hearings, Notices, Fees and Appeals
  11. Division 7 — Enforcement and Penalties
  12. Division 8 — Plot Plans
  13. Division 9 — Zoning Administrator

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.