Skip to content

Title 13 — PUBLIC SERVICES›Chapter 13.08 — SANITARY SEWERS

Article I — Opening and Connecting With Sewers Under City Control

East Palo Alto Municipal Code · 2026-09 edition · updated 2026-10-02 · East Palo Alto

13.08.010 - Appointment of city engineer.

13.08.020 - Employees of districts.

13.08.030 - Opening or connection of sewers.

13.08.040 - Annexation fee.

13.08.050 - Connection charge.

13.08.060 - Change in land use.

13.08.070 - Inspection permit and inspection charge.

13.08.080 - Inspection procedures.

13.08.090 - Charges to be paid before issuance of permit.

13.08.100 - Deposit required.

13.08.110 - Installation of cleanouts.

13.08.120 - Sewer connection required where available.

13.08.130 - No outside toilets where sewer available.

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — East Palo Alto Municipal Code

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.