Title 13 — PUBLIC SERVICES›Chapter 13.08 — SANITARY SEWERS
Article I — Opening and Connecting With Sewers Under City Control
East Palo Alto Municipal Code · 2026-09 edition · updated 2026-10-02 · East Palo Alto
13.08.010 - Appointment of city engineer.¶
13.08.020 - Employees of districts.¶
13.08.030 - Opening or connection of sewers.¶
13.08.040 - Annexation fee.¶
13.08.050 - Connection charge.¶
13.08.060 - Change in land use.¶
13.08.070 - Inspection permit and inspection charge.¶
13.08.080 - Inspection procedures.¶
13.08.090 - Charges to be paid before issuance of permit.¶
13.08.100 - Deposit required.¶
13.08.110 - Installation of cleanouts.¶
13.08.120 - Sewer connection required where available.¶
13.08.130 - No outside toilets where sewer available.¶
Get a plain-English answer with a citation back to this text.
Ask AI about this code