Title 8 — HEALTH AND SAFETY›Chapter 8.16 — SOLID WASTE AND RECYCLABLE MATERIAL COLLECTION
Division 6 — CONSTRUCTION AND DEMOLITION WASTE
Diamond Bar Municipal Code · 2026-09 edition · updated 2026-10-02 · Diamond Bar
Sec. 8.16.720. - Construction or demolition waste.¶
Sec. 8.16.730. - Covered projects.¶
Sec. 8.16.740. - Construction/demolition contractor self-haul permit.¶
Sec. 8.16.750. - Deposit required for covered projects.¶
Sec. 8.16.760. - Condition precedent to issuance of building or demolition permit.¶
Sec. 8.16.770. - Revocation.¶
Sec. 8.16.780. - Records.¶
Sec. 8.16.790. - Reporting.¶
Sec. 8.16.800. - Monitoring responsibility of director.¶
Sec. 8.16.810. - Permitted waste.¶
Sec. 8.16.820. - Implementing regulations.¶
Get a plain-English answer with a citation back to this text.
Ask AI about this code