21.50.80 Visual Resources Analysis
Del Norte County Zoning Code · 2026-06 edition · updated 2026-07-07 · Del Norte County
Within portions of residential zone districts visible from view corridors and viewpoints designated in the Local Coastal Program Visual Resources Inventory, Coastal Development Permit applications for new residential structures that exceed 25-feet in maximum height shall include the analysis identified in subsections (a)-(b) below. The County Environmental Review Committee (as specified in Del Norte County Code §22.040.030.K) shall, in addition to their other duties, also review Coastal Development Permit applications for new residential structures that exceed 25-feet in maximum height for potential impacts to visual resources. The Environmental Review Committee's review of such applications shall include: (a) An analysis of the relative compatibility of the proposed project with similar development in the surrounding area, comparing and contrasting building heights, square footages, floor area, and lot coverage. (b) An analysis of whether the height, width, and siting of structures, including setbacks from roads and parcel lines retain as much of the existing view as possible. (c) Where feasible, complete avoidance of impacts to visual resources through site selection and design alternatives is preferred. Approved residential structures that exceed 25 feet in height shall be visually compatible with the character of the surrounding area, sited and designed to protect views to and along the ocean and scenic coastal areas, and minimize the alteration of natural landforms.
- (Ord. 2018 001, 2018)
21.50A California Coastal Zone Entitlement Procedures--General Plan 21.50A.10 Definition
21.50A.20 Frequency Limitation
21.50A.30 Application Review 21.50A.40 Notification
21.50A.50 Hearings
21.50A.60 Coastal Element Amendment; LCP-LUP Amendments
21.50A.10 Definition
A General Plan amendment is an entitlement which consists of a change of text and/or mapping for any element of the adopted Del Norte County General Plan. A finding by either the planning commission or board of supervisors as part of a specific entitlement review (such as a rezoning, land subdivision or use permit) which clarifies the intent of the General Plan (e.g., the specific location on a parcel of the boundary between two land use designations) shall not be deemed an amendment thereto.
- (Ord. 83 03 (part), 1983)
21.50A.20 Frequency Limitation
The mandatory elements of the General Plan (including the Coastal Element) shall not be amended more frequently than three times during any one calendar year. Each amendment however, may include several different changes.
- (Ord. 83 03 (part), 1983)
21.50A.30 Application Review
Content. Application for a General Plan amendment shall be made to the county planning office on a form provided by said office and shall be accompanied by:
Verification of the applicant's interest in the property such as a copy of the grant deed, signed or certified escrow instructions, title report or owner's letter of authorization.
An assessor's office plat map.
A plot plan of sufficient detail to illustrate the request and to determine compliance with other county regulations (yards, setbacks, grading, General Plan compliance, etc.).
Any building plans, elevations or supplemental data as maybe requested to adequately illustrate the proposal and/or its impacts.
A filing fee, as prescribed in the current fee schedule resolution of the board of supervisors.
Environmental Review Committee (See Title 16 of the Del Norte County Code). The environmental review committee shall review an application at its next regular meeting after submission of the application packet to the department of planning and building. Review shall include:
A determination of completeness of the application and, where necessary, notification of any additional information required.
A recommendation for action on an environmental document pursuant to the California Environmental Quality Act.
Planning Staff Report. Project applications shall be reviewed by the environmental review committee, scheduled for planning commission hearing and shall be accompanied by a report from the staff of the department of planning and building. The report shall include a description of the
project, its location, any applicable regulations and/or policies, any responses to comment submitted regarding the project and a recommendation for findings and/or conditions, if any.
- (Ord. 83 03 (part), 1983)
21.50A.40 Notification
The county shall provide notice of pending General Plan amendment application which contains the following information:
A statement that the development is within the coastal zone.
The date of filing of the application and the name of the applicant.
The number assigned to the application.
A description of the development and its proposed location.
The date(s), time and place(s) at which the application will be considered by the local governing body.
A brief description of the general procedure of local government concerning the conduct of any hearing and/or issuance action.
The system for local and Coastal Commission appeals, including any local fees required.
Notice of a public hearing shall be provided at least ten days prior to the hearing by:
First-class mail to each applicant, to all persons who have requested to be on the mailing list for that project or for coastal decisions within the county's coastal zone and to the Coastal Commission; and
First-class mail to all property owners within one hundred feet of the perimeter of the parcel on which the development is proposed when a subdivision or zoning amendment is not a part of the project or within three hundred feet when a zoning amendment or subdivision is a part of the project except that when notice for a zoning amendment would be sent to greater than one thousand owners, alternative notice in a newspaper of general circulation pursuant to Government Code Section 65854.5 may be utilized; and
opment is proposed when a subdivision or zoning amendment is not a part of the project or within three hundred feet when a zoning amendment or subdivision is a part of the project except that when notice for a zoning amendment would be sent to greater than one thousand owners, alternative notice in a newspaper of general circulation pursuant to Government Code Section 65854.5 may be utilized; and
Notice shall be delivered by the applicant to each dwelling unit within one hundred feet of the project. The applicant shall submit to the county planner a signed affidavit listing the addresses of all residences and attesting to the delivery of the notices. The affidavit shall be submitted within three calendar days of delivery; and
Notice shall be published at least once in a newspaper of general circulation published and circulated in the county.
For the purposes of this section:
"Property owners" means all persons, including businesses, corporations or other public or private entities shown on the latest equalized assessment roll as owning real property.
Those persons who request to be on a mailing list shall submit such request in writing to the department of planning and building at any time during the calendar year and it shall apply for the balance of such calendar year. The county may impose a reasonable fee on persons requesting such notice for the purpose of recovering the cost of such mailing.
- (Ord. 83 03 (part), 1983)
21.50A.50 Hearings
General Plan amendments shall be heard by the planning commission at the date, time and place set forth in the required public notice.
Following the public hearing for a General Plan amendment, the commission shall make a written report to the board of supervisors summarizing any issues, addressing specific finding, such as Local Coastal Program performance and setting forth the commission's recommendation including any conditions or changes.
The board of supervisors, upon receipt of a commission report for a General Plan amendment shall set the matter for a public hearing and shall give notice thereof as set forth in Section 21.50A.40. The board may approve, modify or disapprove any recommendation of the commission. Any modification of the proposed amendment shall be referred back to the commission for a report and recommendation. The board also may, by resolution, abandon any proceedings for an amendment initiated by its own action, provided that such abandonment may be made only when such proceedings are before such body as a hearing for which required notice has been given.
- (Ord. 83 03 (part), 1983)
21.50A.60 Coastal Element Amendment; LCP-LUP Amendments
An amendment to the General Plan Coastal Element shall constitute an amendment to the Local Coastal Program-Land Use Plan (LCP-LUP). Upon completion of local review procedure, set forth in this chapter, the county shall submit a proposed LCP-LUP amendment to the California Coastal Commission for review and certification.
No General Plan Coastal Element amendment shall take effect until it has been certified by the California Coastal Commission.
- (Ord. 83 03 (part), 1983)
-- 21.50B California Coastal Zone Entitlement Procedures Zoning Amendments
21.50B.10 Definition 21.50B.20 General Plan Consistency
21.50B.30 Application Review 21.50B.40 Notification 21.50B.50 Hearings
21.50B.60 Local Coastal Program Amendments; LCP Zoning Amendments - 21.50B Table A Coastal Element Land Use Plan And Zoning Consistency
21.50B.10 Definition
A zoning amendment is an amendment to Chapters 21.02 through 21.60 to establish or change zoning district text, district boundaries or any other provisions thereof whenever the public necessity, convenience and/or general welfare require such an amendment.
- (Ord. 83 03 (part), 1983)
21.50B.20 General Plan Consistency
Chapters 21.02 through 21.60 and any amendment thereto shall be consistent with the County's General Plan. Within the California coastal zone consistency of zoning with the General Plan Coastal Element shall be as set forth in Table A, following this chapter.
- (Ord. 83 03 (part), 1983)
21.50B.30 Application Review
Application for a zoning amendment shall be made to the county planning office on a form provided by said office and shall be accompanied by:
Verification of the applicant's interest in the property such as a copy of the grant deed, signed or certified escrow instructions, title report or owner's letter of authorization.
An assessor's office plat map.
A plot plan of sufficient detail to illustrate the request and to determine compliance with other county regulations (yards, setbacks, grading, General Plan compliance, etc.).
Any building plans, elevations or supplemental data as may be requested to adequately illustrate the proposal and/or its impacts.
A filing fee as prescribed in the current fee schedule resolution of the board of supervisors.
Environmental Review Committee (See Title 16 of the Del Norte County Code). The environmental review committee shall review an application at its next regular meeting after submission of the application packet to the department of planning and building. Review shall include:
A determination of completeness of the application and, where necessary, notification of any additional information required.
A recommendation for action on an environmental document pursuant to the California Environmental Quality Act.
Planning Staff Report. Project applications shall be reviewed by the environmental review committee, scheduled for planning commission hearing and shall be accompanied by a report from the staff of the department of planning and building. The report shall include a description of the project, its location, any applicable regulations and/or policies, any responses to comments submitted regarding the project and a recommendation for findings and/or conditions, if any.
- (Ord. 83 03 (part), 1983)
21.50B.40 Notification
The county shall provide notice of pending application for a zoning amendment which contains the following information:
A statement that the development is within the coastal zone.
The date of filing of the application and the name of the applicant.
The number assigned to the application.
A description of the development and its proposed location.
The date(s), time and place(s) at which the application will be considered by the local governing body.
A brief description of the general procedure of local government concerning the conduct of any hearing and/or issuance action.
The system for local and Coastal Commission appeals, including any local fees required.
Notice of a public hearing shall be provided at least ten days prior to the hearing by:
First-class mail to each applicant, to all persons who have requested to be on the mailing list for the project of for coastal decisions within the county's coastal zone and to the Coastal Commission; and
First-class mail to all property owners within three hundred feet of the perimeter of the parcel on which the development is proposed except that when notice would be sent to greater than one thousand owners alternative notice in a newspaper of general circulation pursuant to Government Code Section 65854.5 may be utilized; and
Notice shall be delivered by the applicant to each dwelling unit within one hundred feet of the project. The applicant shall submit to the county planner a signed affidavit listing the addresses of all residences and attesting to the delivery of the notices. The affidavit shall be submitted within three calendar days of delivery; and
Notice shall be published at least once in a newspaper of general circulation published and circulated in the county.
For the purposes of this section:
"Property owner" means all persons, including businesses, corporations or other public or private entities shown on the latest equalized assessment roll as owning real property.
Those persons who request to be on a mailing list shall submit such a request in writing to the department of planning and building at any time during the calendar year and it shall apply for the balance of such calendar year. The county may impose a reasonable fee on persons requesting such notice for the purpose of recovering the cost of such mailing.
- (Ord. 83 03 (part), 1983)
21.50B.50 Hearings
Zoning amendments shall be heard by the planning commission at the date, time and place set forth in the required public notice.
Following the public hearing for a zoning amendment the commission shall make a written report to the board of supervisors summarizing any issues, addressing specific finding, including General Plan conformance and setting forth the commission's recommendation including any conditions or changes.
The board of supervisors, upon receipt of a commission report for a zoning amendment, shall set the matter for a public hearing and shall give notice thereof as set forth in Section 21.50B.40. The board may approve, modify or disapprove any recommendation of the commission. Any modification of the proposed ordinance or amendment shall be referred back to the commission for a report and recommendation. The board also may, by resolution, abandon any proceedings for an amendment initiated by its own action, provided that such abandonment may be made only when such proceedings are before such body at a hearing for which required notice has been given.
- (Ord. 83 03 (part), 1983)
21.50B.60 Local Coastal Program Amendments; LCP Zoning Amendments
Zoning amendments within the California coastal zone shall constitute an amendment to the Local Coastal Program except where:
The amendment deals solely with the issue of the establishment or removal of the MH-1 and MH-2 (mobilehome) combining district zone, or
The amendment consists of an interchange between the RR-1 (rural residential) and RRA-1 (high density rural residential agriculture) district zones for the provision for or control of agricultural animals.
A textual amendment to Chapters 21.02 through 21.60 shall be an amendment of the Local Coastal Program and, if approval is recommended by the county upon completion of local review, shall be submitted as such to the California Coastal Commission for review.
Any zoning map amendment involving the application or removal of Chapters 21.37 through 21.39 (flood zone combining districts), Chapter 21.35 (coastal area combining district), or the removal of Chapter 21.11A (designated resource conservation area) shall be considered a major amendment of the local coastal program and, if approval is recommended by the county upon completion of local review, shall be submitted as such to the California Coastal Commission for review. A rezoning from RCA-1 to RCA-2 pursuant to Section 21.11.60 shall be considered a minor amendment and shall be submitted as such to the California Coastal Commission.
Except as provided in subsections A through C of this section, a zoning map amendment where the zoning district use and density are consistent with the certified land use plan and density as set forth in Table A herein shall be considered a minor amendment of the Local Coastal Program and, if approval is recommended by the county upon completion of local review, shall be submitted as such to the California Coastal Commission for review.
No local coastal program zoning amendment shall take effect until it has been certified by the California Coastal Commission.
- (Ord. 86 04 (part), 1986: (Ord. 83 03 (part), 1983)
21.50B Table A Coastal Element Land Use Plan And Zoning Consistency
Table A is not available for viewing within this application, please click the ordinance number below to download from the document library.
- (Ord. 2021 001 § 8, 2021)
21.50C California Coastal Zone Entitlement Procedures--Use Permits
21.50C.10 Definition 21.50C.20 When Required 21.50C.30 Application Review 21.50C.40 Notification 21.50C.50 Hearings 21.50C.60 Revocation/Expiration 21.50C.70 Appeals
21.50C.10 Definition
A use permit is an entitlement which provides for the establishment of certain uses which are not permitted as a matter of right but which may be established within specified zoning districts subject to the review and satisfaction of specified conditions as set forth in Chapters 21.02 through 21.60.
- (Ord. 83 03 (part), 1983)
21.50C.20 When Required
A use permit shall be required for new development as specified in Chapters 21.08 through 21.48 and under the following circumstances:
Any amendment(s) to a prior approved use permit including, but not limited to, a requested change in contingencies.
An addition or expansion of a use permit.
An addition or expansion of a use requiring but not having a use permit because the land use predates the zoning requiring a use permit.
- (Ord. 83 03 (part), 1983)
21.50C.30 Application Review
Content. Application for a use permit shall be made to the county planning office on a form provided by the office and shall be accompanied by:
Verification of the applicant's interest in the property such as a copy of the grant deed, signed or certified escrow instructions, title report or owner's letter of authorization.
An assessor's office plat map.
A plot plan of sufficient detail to illustrate the request and to determine compliance with other county regulations (yards, setbacks, grading, General Plan compliance, etc.).
Any building plans, elevations or supplemental data as may be requested to adequately illustrate the proposal and/or its impacts.
A filing fee, as prescribed in the current fee schedule resolution of the board of supervisors.
Environmental Review Committee (See Title 16 of the Del Norte County Code). The environmental review committee shall review an application at its next regular meeting after submission of the application packet to the department of planning and building. Review shall include:
A determination of completeness of the application and, where necessary, notification of any additional information required.
A recommendation for action on an environmental document pursuant to the California Environmental Quality Act.
Planning Staff Report. Project applications shall be reviewed by the environmental review committee, scheduled for planning commission/harbor commission hearing and shall be accompanied by a report from the staff of the department of planning and building. The report shall include a description of the project, its location, and applicable regulations and/or policies, any responses to comments submitted regarding the project and a recommendation for findings and/ or conditions, if any, including consistency with the zoning and/or General Plan.
- (Ord. 83 03 (part), 1983)
21.50C.40 Notification
The county shall provide notice of pending application which contains the following information: 1. A statement that the development is within the coastal zone.
The date of filing of the application and the name of the applicant.
The number assigned to the application.
A description of the development and its proposed location.
The date(s), time and place(s) at which the application will be considered by the local governing body.
A brief description of the general procedure of local government concerning the conduct of any hearing and/or issuance action.
The system for local and Coastal Commission appeals including any local fees required.
Notice of a public hearing shall be provided at least ten days prior to the hearing by:
First-class mail to each applicant, to all persons who have requested to be on the mailing list for that project or for coastal decisions within the county's coastal zone and the coastal commission; and
First-class mail to all property owners within one hundred feet of the perimeter of the parcel on which the development is proposed; and
Notice shall be delivered by the applicant to each dwelling unit within one hundred feet of the project. The applicant shall submit to the county planner a signed affidavit listing the addresses of all residences and attesting to the delivery of the notices. The affidavit shall be submitted within three calendar days of delivery; and
Notice shall be published at least once in a newspaper of general circulation published and circulated in the county.
For the purposes of this section:
"Property owner" means all persons, including businesses, corporations or other public or private entities shown on the latest equalized assessment roll as owning real property.
Those persons who request to be on a mailing list shall submit such request in writing to the department of planning and building at any time during the calendar year and it shall apply for the balance of such calendar year. The county may impose a reasonable fee on persons requesting such notice for the purpose of recovering the cost of such mailing.
- (Ord. 83 03 (part), 1983)
21.50C.50 Hearings
Use permits shall be heard by the planning commission/harbor commission at the date, time and place set forth in the required public notice.
The planning commission/harbor commission may issue the use permit if the finding of the commission shall be that the establishment, maintenance or operation of the use applied for will not, under the circumstances of the particular case, be detrimental to the health, safety, peace, morals, comfort and general welfare of persons residing or working in the neighborhood, such use is in harmony with the general intent of Chapters 21.02 through 21.60 and that the issuance of the permit is consistent with those General Plan policies which are applicable to the subject parcel.
The planning commission/harbor commission may designate such conditions as it deems necessary to secure the purposes of Chapters 21.02 through 21.60 and may require a guarantee and/or bond that such conditions will be complied with.
- (Ord. 83 03 (part), 1983)
21.50C.60 Revocation/Expiration
In any case where the conditions of granting a use permit have not, or are not complied with, the planning commission/harbor commission shall give notice to the permittee by certified mail sent to the address shown on the application for the use permit at least ten days prior to a hearing thereon. At the conclusion of the hearing, the commission may revoke such permit. Such revocation shall be subject to the right of local appeal in the same manner as set forth in Chapter 21.51.
In any case where a substantial start has not been made to use the use permit within one year after the date of granting thereof, or the use permit has been abandoned for a period of one year, then, without further action by the planning commission/harbor commission or board of supervisors, the use permit granted shall be null and void. At the permittee's request, evidence of a substantial start or abandonment of a use permit may be reviewed by the commission as per subsection A of this section in order to determine whether the permit should not be null and void.
- (Ord. 83 03 (part), 1983)
21.50C.70 Appeals
Local appeals to the board of supervisors shall be as set forth in Chapter 21.50.
- (Ord. 83 03 (part), 1983)
21.50D California Coastal Zone Entitlement Procedures--Variances
21.50D.10 Definition 21.50D.20 Application Review 21.50D.30 Notification 21.50D.40 Hearings 21.50D.50 Revocation/Expiration
21.50D.10 Definition
A variance is an entitlement to deviate from those requirements of Chapters 21.08 through 21.48 which do not address land use because of special circumstances applicable to the property, including size, shape, topography, location or surroundings when the strict application of said chapters deprives such property of privileges enjoyed by other property in the vicinity and under identical zoning classification.
- (Ord. 83 03 (part), 1983)
21.50D.20 Application Review
Content. Application for a variance shall be made to the county planning office on a form provided by said office and shall be accompanied by:
Verification of the applicant's interest in the property such as a copy of the grant deed signed or certified escrow instructions, title report or owner's letter of authorization.
An assessor's office plant map.
A plot plan of sufficient detail to illustrate the request and to determine compliance with other county regulations (yards, setbacks, grading, General Plan compliance, etc.).
Any building plans, elevations or supplemental data as may be requested to adequately illustrate the proposal and/or its impacts.
A filing fee, as prescribed in the current fee schedule resolution of the board of supervisors.
Environmental Review Committee (See Title 16 of the Del Norte County Code). The environmental review committee shall review an application at its next regular meeting after submission of the application packet to the department of planning and building. Review shall include:
- A determination of completeness of the application and, where necessary, notification of any additional information required.
A recommendation for action on an environmental document pursuant to the California Environmental Quality Act.
Planning Staff Report. Project applications shall be reviewed by the environmental review committee, scheduled for planning commission/harbor commission hearings and shall be accompanied by a report from the staff of the department of planning and building. The report shall include a description of the project, its location, any applicable regulations and/or policies, any responses to comments submitted regarding the project and a recommendation for findings and/or conditions, if any.
- (Ord. 83 03 (part), 1983)
21.50D.30 Notification
The county shall provide notice of pending application which contains the following information:
A statement that the development is within the coastal zone.
The date of filing of the application and the name of the application.
The number assigned to the application.
A description of the development and its proposed location.
The date(s), time and place(s) at which the application will be considered by the local governing body.
A brief description of the general procedure of local government concerning the conduct of any hearing and/or issuance action.
The system for local and Coastal Commission appeals, including any local fees required.
When a project which is appealable to the Coastal Commission required a local public hearing, notice shall be provided at least ten days prior to the hearing by:
First-class mail to each applicant, to all persons who have requested to be on the mailing list for the project or for coastal decisions within the county's coastal zone and to the Coastal Commission, and
First-class mail to all property owners within one hundred feet of the perimeter of the parcel on which the development is proposed.
Notice shall be delivered by the applicant to each dwelling unit within one hundred feet of the project. The applicant shall submit to the county planner a signed affidavit listing the addresses of all residences and attesting to the delivery of the notices. The affidavit shall be submitted within three calendar days of delivery.
Notice shall be published at least once in a newspaper of general circulation published and circulated in the county.
For the purposes of this section:
"Property owner" means all persons, including businesses, corporations or other public or private entities shown on the latest equalized assessment roll as owning real property.
Those persons who request to be on a mailing list shall submit such request in writing to the department of planning and building at any time during the calendar year. the county may impose a reasonable fee on persons requesting such notice for the purpose of recovering the cost of such mailing.
- (Ord. 83 03 (part), 1983)
21.50D.40 Hearings
Variances shall be heard by the planning commission at the date, time and place set forth in the required public notice.
Before any variance may be granted, all of the following must be shown:
That there are exceptional or extraordinary circumstances, or conditions applying to the land referred to in the application, which circumstances or conditions do not apply to other lands, in the same district.
That the granting of the variance is necessary for the preservation and enjoyment of substantial property rights of the applicant.
That the granting of such variance will not, under the circumstances of the particular case, affect adversely the health or safety of persons residing or working in the neighborhood of the property of the applicant, and will not, under the circumstances of the particular case, be detrimental to the public welfare or injurious to property or improvements in the neighborhood.
That the issuance of such variance is consistent with General Plan policies which are applicable to the subject parcel and the intent of the zoning district in which it is located.
Any variance granted shall be subject to such conditions as will assure that the adjustment thereby authorized shall not constitute a grant of special privileges inconsistent with the limitations upon other properties in the vicinity and district in which such property is situated.
Following the public hearing for a variance the commission shall make a written report to the board of supervisors summarizing any issues, addressing specific findings, and setting forth the commission's recommendation including any conditions.
The board of supervisors shall consider the report of the commission regarding any variance and, if the board of supervisors finds that the requirements of subsection B of this section do in fact apply to the land and that such variance is in harmony with the purposes of Chapters 21.02 through 21.60, the board shall by resolution grant such variance. The board of supervisors may designate conditions and guarantees in connection with the variance to secure the purposes of Chapters 21.02 through 21.60.
- (Ord. 83 03 (part), 1983)
21.50D.50 Revocation/Expiration
- In any case where the conditions of granting of a variance have not, or are not complied with, the board of supervisors shall give notice to the permittee of intention to revoke such variance at least ten days prior to a hearing hereon by the planning commission/harbor commission. After
conclusion of the hearing, the planning commission/harbor commission may revoke such variance. Such revocation shall be subject to confirmation by the board of supervisors.
- In any case where a variance has not been used within one year after the date of granting thereof, then, without further action by the planning commission or board of supervisors, the variance granted shall be null and void.
- (Ord. 83 03 (part), 1983)
-- 21.51 California Coastal Zone Entitlement Procedures Local Appeals
21.51.10 Final County Action 21.51.20 Appeal Of Project Review
21.51.30 Appeal Of Planning Commission/Harbor Commission Review 21.51.40 Fee
21.51.50 Aggrieved Person
Get a plain-English answer with a citation back to this text.
Ask AI about this code▸ Contents — Del Norte County Zoning Code
- 20.00.10 Accessory Dwelling Unit (ADU) Regulations
- 20.00.20 Junior Accessory Dwelling Unit (JADU) Regulations
- 20.02.10 Citation
- 20.02.20 Adoption
- 20.02.30 Purpose
- 20.02.40 District Establishment; Provision For Legal Procedure
- 20.02.50 District Establishment; Initiation
- 20.02.60 Unclassified Areas
- 20.04.800 Structural Alternations
- 20.04.10 Generally
- 20.04.12 Accessory Dwelling Unit (ADU)
- 20.04.20 Agriculture
- 20.04.30 Airport
- 20.04.40 Alley
- 20.04.50 Animal Husbandry
- 20.04.60 Apartment
- 20.04.65 Efficiency Kitchen
- 20.04.70 Apartment Court
- 20.04.80 Apartment House
- 20.04.90 Area, Building Site
- 20.04.100 Automobile Camp
- 20.04.110 Automobile Wrecking
- 20.04.120 Basement
- 20.04.130 Block
- 20.04.140 Building
- 20.04.150 Building, Accessory
- 20.04.160 Building, Main
- 20.04.170 Business Or Commerce
- 20.04.175 Community Care Facility
- 20.04.180 Caretaker
- 20.04.185 Child Day Care Home
- 20.04.190 Court
- 20.04.200 Coverage, Lot Or Building
- 20.04.210 District
- 20.04.220 Duplex
- 20.04.230 Dwelling Group
- 20.04.240 Dwelling, Multiple
- 20.04.250 Dwelling One Family
- 20.04.260 Dwelling Two Family
- 20.04.265 Emergency Shelter
- 20.04.270 Employee Full Time
- 20.04.275 Employee Housing
- 20.04.280 Employee Housing, Agriculture
- 20.04.285 Factory-Built Home
- 20.04.290 Family
- 20.04.295 Family Immediate
- 20.04.300 Front Wall
- 20.04.310 Garage, Private
- 20.04.320 Garage, Public
- 20.04.330 Garage, Storage
- 20.04.340 Guest Room
- 20.04.350 Height Of Building
- 20.04.355 Home Enterprise
- 20.04.360 Home Occupation
- 20.04.370 Hotel
- 20.04.380 House Court
- 20.04.390 Household Pets
- 20.04.400 Industry
- 20.04.405 Junior Accessory Dwelling Unit (JADU)
- 20.04.410 Junk
- 20.04.420 Junkyards
- 20.04.430 Livestock Farming
- 20.04.440 Loading Space
- 20.04.445 Lodging, House Or Guest
- 20.04.450 Lot
- 20.04.460 Lot Area
- 20.04.470 Lot Corner
- 20.04.480 Lot Depth
- 20.04.490 Lot Frontage
- 20.04.500 Lot Interior
- 20.04.510 Lot, Key
- 20.04.530 Lot Lines Front
- 20.04.540 Lot Lines Rear
- 20.04.550 Lot Lines Side
- 20.04.551 Major Transit Stop
- 20.04.555 Low Barrier Navigation Center
- 20.04.560 Manufactured Home
- 20.04.565 Mining
- 20.04.570 Mobile Home
- 20.04.580 Motel
- 20.04.590 Mutual Water Company
- 20.04.600 Nonconforming Use
- 20.04.610 Nuisance
- 20.04.620 One Ownership
- 20.04.630 Outdoor Advertising Sign
- 20.04.640 Outdoor Advertising Structure
- 20.04.645 Park Trailer
- 20.04.660 Public Sewage Disposal System
- 20.04.663 Public Transit
- 20.04.670 Public Use
- 20.04.680 Public Water Supply
- 20.04.690 Quasi-Public Use
- 20.04.700 Sawmill
- 20.04.710 Setback
- 20.04.715 Single Room Occupancy (SRO)
- 20.04.720 Small Livestock Farming
- 20.04.730 Stable Private
- 20.04.740 Stable Public
- 20.04.750 Story
- 20.04.760 Story Half
- 20.04.770 Street
- 20.04.780 Street Line
- 20.04.790 Structure
- 20.04.800 Structural Alternations
- 20.04.810 Recreational Vehicle
- 20.04.830 Mobilehomes Park
- 20.04.840 Recreational Vehicle Park
- 20.04.842 Supportive Housing
- 20.04.844 Tandem Parking
- 20.04.848 Transitional Housing
- 20.04.860 Use Accessory
- 20.04.870 Wrecking Yard
- 20.04.880 Yard
- 20.04.890 Yard Front
- 20.04.900 Yard Rear
- 20.04.910 Yard Side
- 20.06.10 Designation
- 20.06.20 Establishment
- 20.06.30 Boundary Uncertainty; Determination
- 20.06.40 Regulations To Govern Use
- 20.06.50 Zoning Maps On File
- 20.08.5 Intent; Applicability
- 20.08.10 Uses Permitted
- 20.08.20 Uses Permitted On Privately Owned Land With A Use Per…
- 20.08.30 Building Height Limit
- 20.08.40 Minimum Lot Area Required
- 20.08.50 Front Yard Required
- 20.08.60 Side Yard Required
- 20.08.70 Rear Yard Required
- 20.09.5 Intent; Applicability
- 20.09.10 Uses Permitted
- 20.09.20 Uses Permitted With A Use Permit
- 20.09.30 Building Height Limit
- 20.09.40 Minimum Lot Area Required
- 20.09.50 Front Yard Required
- 20.09.60 Side Yard Required
- 20.09.70 Rear Yard Required
- 20.10.10 Intent; Applicability
- 20.10.20 Uses Permitted
- 20.10.30 Uses Permitted With A Use Permit
- 20.10.40 Building Height Limit
- 20.10.50 Minimum Lot Area Required
- 20.10.60 Front Yard Required
- 20.10.70 Side Yard Required
- 20.10.80 Rear Yard Required
- 20.10.90 Special Yards And Distances Between Buildings Required
- 20.10.100 Special Requirements
- 20.11.10 Purpose
- 20.11.20 Permitted Uses
- 20.11.30 Uses Permitted With A Use Permit
- 20.11.40 Building Height
- 20.11.50 Minimum Lot Area
- 20.11.60 Front Yard
- 20.11.70 Side Yard
- 20.11.80 Rear Yard
- 20.11.90 Special Yards And Distances Between Buildings
- 20.12 Regulations For "RR-2" Rural Residential District
- 20.13.50 Minimum Lot Area
- 20.13.10 Purpose
- 20.13.20 Permitted Uses
- 20.13.30 Uses Permitted With A Use Permit
- 20.13.40 Building Height
- 20.13.50 Minimum Lot Area
- 20.13.60 Minimum Lot Width
- 20.13.70 Lot Coverage
- 20.13.80 Front Yard
- 20.13.90 Side Yard
- 20.13.100 Rear Yard
- 20.13.110 Special Yards And Distances Between Buildings
- 20.14.10 Purpose
- 20.14.20 Permitted Users
- 20.14.30 Uses Permitted With A Use Permit
- 20.14.40 Building Height
- 20.14.50 Minimum Lot Area
- 20.14.60 Minimum Lot Width
- 20.14.70 Lot Coverage
- 20.14.80 Front Yard
- 20.14.90 Side Yard
- 20.14.100 Rear Yard
- 20.14.110 Special Yards And Distances Between Buildings
- 20.15.10 Intent; Purpose
- 20.15.20 Permitted Uses
- 20.15.40 Building Height
- 20.15.50 Lot Area
- 20.15.60 Lot Width
- 20.15.70 Lot Coverage
- 20.15.80 Front Yard
- 20.15.90 Side Yard
- 20.15.100 Rear Yard
- 20.15.110 Special Yards And Distances Between Buildings
- 20.16.10 Purpose
- 20.16.10 Purpose
- 20.16.20 Permitted Uses
- 20.16.30 Uses Permitted With A Use Permit
- 20.16.40 Building Height
- 20.16.50 Minimum Lot Area
- 20.16.60 Minimum Lot Width
- 20.16.70 Lot Coverage
- 20.16.80 Front Yard
- 20.16.90 Side Yard
- 20.16.100 Rear Yard
- 20.17.5 Intent; Purpose
- 20.17.10 Uses Permitted
- 20.17.20 Building Height With A Use Permit
- 20.17.30 Building Height Limit
- 20.17.40 Minimum Lot Area Required
- 20.17.50 Minimum Lot Width Required
- 20.17.60 Percentage Of Lot Coverage Permitted
- 20.17.70 Front Yard Required
- 20.17.80 Side Yard Required
- 20.17.90 Rear Yard Required
- 20.17.100 Special Yards And Distances Between Buildings Required
- 20.18.10 Purpose
- 20.18.20 Permitted Uses
- 20.18.30 Uses Permitted With A Use Permit
- 20.18.40 Building Height
- 20.18.50 Minimum Lot Area
- 20.18.60 Minimum Lot Width
- 20.18.70 Lot Coverage
- 20.18.80 Yard Setbacks
- 20.20.10 Purpose
- 20.20.30 Uses Permitted With Use Permit
- 20.20.40 Building Height
- 20.20.50 Minimum Lot Area
- 20.20.60 Minimum Lot Width
- 20.20.70 Lot Coverage
- 20.20.80 Front Yard
- 20.20.90 Side Yard
- 20.20.100 Rear Yard
- 20.20.110 Special Yards For Dwelling Groups
- 20.23.10 Purpose
- 20.23.20 Permitted Uses
- 20.23.30 Uses Permitted With A Use Permit
- 20.23.40 Building Height
- 20.23.50 Minimum Lot Area
- 20.23.60 Minimum Lot Width
- 20.23.70 Lot Coverage
- 20.23.80 Front Yard
- 20.23.90 Side Yard
- 20.23.100 Rear Yard
- 20.24.40 Building Height 20.24.50 Minimum Lot Area
- 20.24.10 Purpose
- 20.24.20 Permitted Use
- 20.24.30 Uses Permitted With A Use Permit
- 20.24.40 Building Height
- 20.24.50 Minimum Lot Area
- 20.24.60 Lot Coverage
- 20.24.70 Yard Setbacks
- 20.24.80 Parking
- 20.26.10 Purpose
- 20.26.20 Permitted Uses
- 20.26.30 Uses Permitted With Use Permit
- 20.26.40 Building Height
- 20.26.50 Minimum Lot Area
- 20.26.60 Minimum Lot Width
- 20.26.70 Lot Coverage
- 20.26.80 Front Yard
- 20.26.90 Side Yard
- 20.26.110 Special Yards Required For Dwelling Groups
- 20.28.10 Purpose
- 20.28.20 Permitted Uses
- 20.28.30 Uses Permitted With Use Permit
- 20.28.40 Building Height
- 20.28.50 Minimum Lot Area
- 20.28.60 Minimum Lot Width
- 20.28.70 Lot Coverage
- 20.28.80 Front Yard
- 20.28.90 Side Yard
- 20.28.100 Rear Yard
- 20.28.110 Special Yards For Dwelling Groups
- 20.28.120 Parking Areas
- 20.29.10 Purpose
- 20.29.20 Permitted Uses
- 20.29.40 Building Height
- 20.29.50 Minimum Lot Area
- 20.29.60 Minimum Lot Width
- 20.29.70 Lot Coverage
- 20.29.80 Front Yard
- 20.29.90 Side Yard
- 20.29.100 Rear Yard
- 20.29.110 Special Yards For Dwellings
- 20.29.120 Parking Areas
- 20.30.10 Purpose
- 20.30.20 Permitted Uses
- 20.30.30 Uses Permitted With Use Permit
- 20.30.40 Building Height
- 20.30.50 Minimum Lot Area
- 20.30.60 Minimum Lot Width
- 20.30.70 Lot Coverage
- 20.30.80 Front Yard
- 20.30.90 Side Yard
- 20.30.100 Rear Yard
- 20.30.110 Parking Areas
- 20.31.5 Intent; Applicability
- 20.31.10 Uses Permitted
- 20.31.20 Uses Permitted With A Use Permit
- 20.31.30 Building Height Limit
- 20.31.40 Minimum Lot Area Required
- 20.31.50 Minimum Lot Width
- 20.31.60 Percentage Of Lot Coverage Permitted
- 20.31.70 Front Yard Required
- 20.31.80 Side Yard Required
- 20.31.90 Rear Yard Required
- 20.31.100 Performance Standards
- 20.32.10 Purpose
- 20.32.20 Approval Of Development Plans Required
- 20.32.30 Application For Use Permit
- 20.32.40 Permitted Uses
- 20.34.5 Intent; Applicability
- 20.34.10 Uses Permitted
- 20.34.20 Uses Permitted With A Use Permit
- 20.34.30 Building Height Limit
- 20.34.40 Minimum Lot Area Required
- 20.34.50 Front Yard Required
- 20.34.60 Side Yard Required
- 20.34.70 Rear Yard Required
- 20.34.80 Percentage Of Lot Coverage Permitted
- 20.35.10 Purpose
- 20.35.20 Permitted Uses
- 20.35.30 Uses Permitted With A Use Permit
- 20.35.40 Building Height
- 20.35.50 Minimum Lot Area
- 20.35.60 Front Yard
- 20.35.70 Side Yard
- 20.35.80 Rear Yard
- 20.35.90 Lot Coverage
- 20.36.10 Intent
- 20.36.20 General Regulations
- 20.36.30 Uses Permitted With A Use Permit
- 20.37 Manufactured Housing (MFH) Combining District
- 20.38.10 Purpose
- 20.38.20 Permitted Uses
- 20.38.30 Uses Permitted With Use Permit
- 20.39 NH - Natural Hazard Area District
- 20.40.10 Purpose
- 20.40.20 Permitted Uses
- 20.40.30 Uses Permitted With Use Permit
- 20.42.20 Permitted Uses
- 20.43 TPZ - Timberland Preserve Zone
- 20.44.10 Regulations; General
- 20.44.20 Regulations; Special
- 20.45.10 Intent
- 20.45.10 Intent
- 20.45.20 Applications
- 20.45.30 Restrictions
- 20.46.10 Required Generally
- 20.46.20 Space Requirements For Various Uses
- 20.46.30 Location Of Facilities
- 20.46.40 Parking Spaces; Width Length, Compact Cars And Aisle …
- 20.46.50 Multiple Use Restrictions
- 20.46.60 When Screening Required
- 20.47 Flood Damage Prevention
- 20.48.10 Generally
- 20.48.20 Uses Permitted With Use Permit
- 20.48.30 Assemblages
- 20.48.40 Signs And Nameplates
- 20.48.50 Lighting
- 20.48.60 Storage Of Trailers, Repair Work And Junk
- 20.48.70 Height Restrictions
- 20.48.80 Building Site Area; Special Lot Sizes
- 20.48.90 Yards And Setbacks
- 20.48.95 Agricultural Setbacks And Buffers
- 20.48.100 Special Yards For Dwelling Groups
- 20.48.130 Installation Of Manufactured Homes On Individual Lots
- 20.48.140 Mobile Home Parks
- 20.49.10 Intent
- 20.49.10 Intent
- 20.49.20 Regulations; General
- 20.49.30 Regulations; Special
- 20.50.10 Generally
- 20.50.12 Nonconforming Parcels; Time To Comply
- 20.50.14 Nonconforming Parcels; Opportunity To Divide
- 20.50.16 Applicability Of Grace Period
- 20.50.20 Continuation
- 20.50.30 Fifty Percent Destruction
- 20.50.40 Cessation Of Use
- 20.50.50 Alterations; Use Change
- 20.50.60 Prior Actual Construction
- 20.52.10 Purpose
- 20.52.20 Initiation
- 20.52.30 Application Fee
- 20.52.40 Public Hearing; Planning Commission
- 20.52.50 Report And Recommendations Of Planning
- 20.52.60 Public Hearing; Board Of Supervisors
- 20.54.10 When Granted
- 20.54.20 Application Fee; Condition
- 20.54.30 Public Hearing
- 20.54.40 Report By Planning Commission
- 20.54.50 Action By Board Of Supervisors
- 20.54.60 Revocation
- 20.56.10 Generally
- 20.56.20 Application; Fees
- 20.56.25 Environmental Review
- 20.56.30 Public Hearing
- 20.56.40 Action By Planning Commission
- 20.56.50 Revocation
- 20.56.55 Amendment
- 20.56.60 When Required
- 20.58 Appeals
- 20.60 Enforcement
- 20.65.10 Purpose
- 20.65.20 Definitions
- 20.65.30 Applicability
- 20.65.40 Density Bonus
- 20.65.50 Application Requirements
- 20.65.60 Incentives
- 20.65.70 Discretionary Approval Authority Retained
- 20.65.80 Waivers
- 20.65.90 Affordable Housing Agreement
- 20.65.100 Design And Quality
- 20.64.10 Short Title
- 20.64.20 Purpose
- 20.64.30 Maps
- 20.64.40 Definitions
- 20.64.50 Airport Zones
- 20.64.60 Airport Zone Height Limitations
- 20.64.70 Use Restrictions
- 20.64.80 Nonconforming Uses
- 20.64.90 Variances
- 20.64.100 Administrative Agency
- 20.64.110 Conflicting Regulations
- 20.64.120 Violation
- 20.66 Reasonable Accommodation
- 20.67 Commercial Cannabis Regulation
- 20.68.10 Intent And Application
- 20.68.20 Site Layout And Design
- 20.68.40 Open Space, Exterior Lighting, Parking, And Storage O…
- 21.50 California Coastal Zone Entitlement Procedures--General …
- 21.00 Residential Second Units
- 21.02.10 Citation
- 21.02.20 Adoption
- 21.02.30 Purpose
- 21.02.40 District Establishment; Provision For Legal Procedure
- 21.02.50 District Establishment; Initiation
- 21.04.10 Generally
- 21.04.15 Agricultural Land Prime
- 21.04.20 Agriculture
- 21.04.30 Airport
- 21.04.40 Alley
- 21.04.50 Animal Husbandry
- 21.04.60 Apartment
- 21.04.70 Apartment Court
- 21.04.80 Apartment House
- 21.04.90 Area Building Site
- 21.04.100 Automobile Wrecking
- 21.04.110 Basement
- 21.04.120 Block
- 21.04.130 Building
- 21.04.140 Building Accessory
- 21.04.150 Building Main
- 21.04.160 Business Or Commerce
- 21.04.165 Care Facility Residential
- 21.04.170 Caretaker
- 21.04.177 Coastal Zone California
- 21.04.180 Court
- 21.04.190 Coverage Lot Or Building
- 21.04.195 Development
- 21.04.200 District
- 21.04.210 Duplex
- 21.04.220 Dwelling Group
- 21.04.230 Dwelling Multiple
- 21.04.240 Employee Full-Time
- 21.04.248 Estuary
- 21.04.249 Factory-Built Home
- 21.04.250 Family
- 21.04.260 Family Immediate
- 21.04.265 Farmed Wetlands
- 21.04.270 Front Wall
- 21.04.280 Garage Private
- 21.04.290 Garage Public
- 21.04.300 Garage Storage
- 21.04.310 Guest Room
- 21.04.320 Height Of Building
- 21.04.325 Home Enterprise
- 21.04.330 Home Occupation
- 21.04.340 Hotel
- 21.04.350 House Court
- 21.04.360 Household Pets
- 21.04.370 Industry
- 21.04.380 Junk
- 21.04.390 Junkyard
- 21.04.397 Lateral Access Coastal Zone
- 21.04.400 Livestock Farming
- 21.04.406 Lodging House Or Guest
- 21.04.410 Loading Space
- 21.04.420 Lot
- 21.04.430 Lot Area
- 21.04.440 Lot Corner
- 21.04.450 Lot Depth
- 21.04.460 Lot Frontage
- 21.04.470 Lot Interior
- 21.04.480 Lot Key
- 21.04.490 Lot Lines
- 21.04.500 Lot Line Front
- 21.04.510 Lot Line Rear
- 21.04.520 Lot Line Side
- 21.04.525 Manufactured Home
- 21.04.530 Mining And Mineral Extraction
- 21.04.540 Mobilehome
- 21.04.550 Mobilehome Park
- 21.04.560 Motel
- 21.04.570 Mutual Water Company
- 21.04.580 Native Wooded Habitat
- 21.04.590 Nonconforming Use
- 21.04.600 Nuisance
- 21.04.610 One Ownership
- 21.04.620 Outdoor Advertising Sign
- 21.04.630 Outdoor Advertising Structure
- 21.04.634 Park Trailer
- 21.04.636 Passive Recreational Use Coastal Access
- 21.04.640 Professional Office
- 21.04.650 Public Sewage Disposal System
- 21.04.660 Public Use
- 21.04.670 Public Water Supply
- 21.04.680 Quasi-Public Use
- 21.04.690 Recreational Vehicle
- 21.04.700 Recreational Vehicle Park
- 21.04.723 Resource Conservation Area
- 21.04.726 Riparian Vegetation
- 21.04.727 Sand Dunes Coastal
- 21.04.730 Saw Mill
- 21.04.740 Setback
- 21.04.750 Small Livestock Farming
- 21.04.760 Stable Private
- 21.04.770 Stable Public
- 21.04.780 Story
- 21.04.790 Story Half
- 21.04.800 Street
- 21.04.810 Street Line
- 21.04.820 Structure
- 21.04.830 Structural Alterations
- 21.04.835 Subdivision
- 21.04.840 Use
- 21.04.850 Use Accessory
- 21.04.855 Vertical Access Coastal Zone
- 21.04.856 Wetland
- 21.04.860 Wrecking Yard
- 21.04.870 Yard
- 21.04.880 Yard Front
- 21.04.890 Yard Rear
- 21.04.900 Yard Side
- 21.06 Districts
- 21.08.10 Intent; Applicability
- 21.08.20 The Principal Permitted Use
- 21.08.30 Uses Permitted With A Use Permit
- 21.08.40 Building Height Limit
- 21.08.50 Minimum Lot Area Required
- 21.08.60 Front Yard Required
- 21.08.70 Side Yard Required
- 21.08.80 Rear Yard Required
- 21.08.90 Special Yards And Distances Between Buildings Required
- 21.08.100 Special Requirements
- 21.09.10 Intent
- 21.09.20 The Principal Permitted Use
- 21.09.30 Uses Permitted With A Use Permit
- 21.09.40 Building Height
- 21.09.50 Minimum Lot Area
- 21.09.60 Front Yard
- 21.09.70 Side Yard
- 21.09.80 Rear Yard
- 21.09.90 Special Yards And Distances Between Buildings
- 21.09.100 Special Requirements
- 21.10.10 Intent
- 21.10.20 The Principal Permitted Use
- 21.10.30 Uses Permitted By Use Permit
- 21.10.40 Minimum Lot Area Required
- 21.10.60 Side Yard Required
- 21.10.80 Special Yards And Distances Required
- 21.11.20 Applicability
- 21.11.30 The Principal Permitted Use
- 21.11.40 Uses Permitted With A Use Permit
- 21.11.60 Special Rezoning Requirements
- 21.13 TPZ Timberland Preserve Zone District
- 21.14 CT Coastal Timber Zone District
- 21.16.10 Intent; Purpose
- 21.16.20 The Principal Permitted Use
- 21.16.30 Uses Permitted With A Use Permit
- 21.16.40 Building Height Limit
- 21.16.50 Minimum Lot Area Required
- 21.16.60 Minimum Lot Width Required
- 21.16.70 Percentage Of Lot Coverage Permitted
- 21.16.80 Front Yard Required
- 21.16.90 Side Yard Required
- 21.16.100 Rear Yard Required
- 21.16.110 Special Yards And Distances Between Buildings Required
- 21.17 RRA Rural Residential Agriculture District
- 21.19.10 Intent
- 21.19.20 The Principal Permitted Use
- 21.19.30 Uses Permitted With A Use Permit
- 21.19.40 Building Height
- 21.19.50 Minimum Lot Area
- 21.19.60 Minimum Lot Width
- 21.19.70 Lot Coverage
- 21.19.80 Front Yard
- 21.19.90 Side Yard
- 21.19.100 Rear Yard
- 21.20 MHP Mobilehome Park
- 21.21 R-2 Low Density Multiple-Family Residence District
- 21.22.10 Intent
- 21.22.20 The Principal Permitted Use
- 21.22.30 Uses Permitted With A Use Permit
- 21.22.40 Building Height
- 21.22.50 Minimum Lot Area
- 21.22.60 Minimum Lot Width
- 21.22.70 Lot Coverage
- 21.22.80 Front Yard
- 21.22.100 Rear Yard
- 21.22.110 Special Yards For Dwelling Groups
- 21.23.10 Intent
- 21.23.20 Minimum District Size
- 21.23.30 The Principal Permitted Use
- 21.23.40 Uses Permitted By A Use Permit
- 21.23.50 Project Density
- 21.23.60 Design Requirements
- 21.23.70 Application Requirements
- 21.23.80 Final Review
- 21.23.100 Districts For Which There Is No Approved Plan
- 21.25.10 Intent
- 21.25.20 Permitted Use
- 21.25.30 Uses Permitted With A Use Permit
- 21.25.40 Building Height
- 21.25.50 Minimum Lot Area
- 21.25.60 Lot Coverage
- 21.25.70 Yards
- 21.25.80 Parking
- 21.26.10 Intent
- 21.26.20 The Principal Permitted Use
- 21.26.30 Uses Permitted With Use Permit
- 21.26.40 Building Height
- 21.26.50 Minimum Lot Area
- 21.26.60 Minimum Lot Width
- 21.26.70 Lot Coverage
- 21.26.80 Front Yard
- 21.26.90 Side Yard
- 21.26.100 Rear Yard
- 21.26.110 Special Yards Required For Dwelling Groups
- 21.26.120 Parking Areas
- 21.27.10 Intent
- 21.27.20 The Principal Permitted Use
- 21.27.30 Uses Permitted With Use Permit
- 21.27.40 Building Height
- 21.27.50 Minimum Lot Area
- 21.27.60 Minimum Lot Width
- 21.27.70 Lot Coverage
- 21.27.80 Front Yard
- 21.27.90 Side Yard
- 21.27.100 Rear Yard
- 21.27.110 Special Yards For Dwelling Groups
- 21.27.120 Parking Area
- 21.28.10 Intent
- 21.28.20 The Principal Permitted Use
- 21.28.30 Uses Permitted With A Use Permit
- 21.28.40 Building Height
- 21.28.50 Minimum Lot Area
- 21.28.60 Minimum Lot Width
- 21.28.70 Lot Coverage
- 21.28.80 Front Yard
- 21.28.90 Side Yard
- 21.28.100 Rear Yard
- 21.30.10 Intent
- 21.30.20 The Principal Permitted Use
- 21.30.30 Uses Permitted With A Use Permit
- 21.30.40 Building Height
- 21.30.50 Minimum Lot Area
- 21.30.60 Minimum Lot Width
- 21.30.70 Lot Coverage
- 21.30.80 Front Yard
- 21.30.90 Side Yard
- 21.30.100 Rear Yard
- 21.30.110 Special Yards For Dwellings
- 21.31 M Manufacturing And Industrial District
- 21.32.10 Intent; Applicability
- 21.32.20 The Principal Permitted Use
- 21.32.30 Uses Permitted With A Use Permit
- 21.32.40 Building Height Limit
- 21.32.50 Minimum Lot Area Required
- 21.32.60 Minimum Lot Width
- 21.32.70 Percentage Of Lot Coverage Permitted
- 21.32.80 Front Yard Required
- 21.32.90 Side Yard Required
- 21.32.100 Rear Yard Required
- 21.32.110 Performance Standards
- 21.33 PF Public Facility District
- 21.34.10 Regulations; General
- 21.34.20 Regulations; Special
- 21.35 C Coastal Area Combining District
- 21.36 D Combining District
- 21.37.10 Intent And Applicability
- 21.37.20 Special Requirements
- 21.38.10 Intent And Applicability
- 21.38.20 Special Requirements
- 21.39.10 Intent And Applicability
- 21.39.20 Special Requirements
- 21.40 Manufactured Housing (MFH) Combining District
- 21.44.10 Required Generally
- 21.44.20 Space; Requirements For Various Uses
- 21.44.30 Location Of Facilities
- 21.44.40 Space; Area Width And Length
- 21.44.50 Multiple Use Restrictions
- 21.44.60 When Screening Required
- 21.45 Flood Damage Prevention
- 21.46.10 Generally
- 21.46.20 Uses Permitted With A Use Permit
- 21.46.30 Assemblages
- 21.46.40 Signs And Nameplates
- 21.46.50 Lighting
- 21.46.60 Storage Of Trailers, Repair Work And Junk
- 21.46.70 Height Restrictions
- 21.46.80 Building Site Area; Special Lot Sizes
- 21.46.90 Yards And Setbacks
- 21.46.110 Household Pets And Small Livestock
- 21.46.130 Installation Of Manufactured Homes On Individual Lots
- 21.47.10 Required Generally
- 21.47.20 Criteria
- 21.47.30 Exceptions
- 21.47.40 Temporary Interruptions
- 21.48 Nonconforming Uses
- 21.50.10 Intent
- 21.50.20 County Entitlements Equivalent To Coastal Development…
- 21.50.30 Coastal Development Permit Exemptions
- 21.50.50 Emergency Permits
- 21.50.60 Determination Of Applicable Notice And Hearing Proced…
- 21.50.70 Hearings
- 21.50.80 Visual Resources Analysis
- 21.51.10 Final County Action
- 21.51.20 Appeal Of Project Review
- 21.51.30 Appeal Of Planning Commission/Harbor Commission Review
- 21.51.40 Fee
- 21.51.50 Aggrieved Person
- 21.52.10 Exhaustion Of Local Appeals
- 21.52.20 Basis Of Appeals
- 21.60 Enforcement