Chapter XII — STREETS AND SIDEWALKS <sup>1</sup>
Article II — ROAD DEDICATIONS AND SETBACKS
Danville Municipal Code · 2026-09 edition · updated 2026-10-02 · Danville
12-7.1 Findings
12-7.2 Cost
12-7.3 Intention
12-7.4 Objectives
- 12-7.5 Requirements Generally
12-7.6 Applicable Zoning Districts
12-7.7 Maximum Dedication
12-7.8 Existing Improvements in Right-of-Way
12-7.9 No Building in Dedicated Area
12-7.10 Construction; Exceptions
12-7.11 General Procedures
12-7.12 Dedication Assurance
12-7.13 Improvement Bond
12-7.14 Improvement Default
12-7.15 Bond Term and Completion
12-7.16 Improvement Assurance; Notice
12-7.17 Building Permit Issuance
12-7.18 Fees; None Required
12-8.1 Improvements
12-8.2 Principal Thoroughfares; Type A
12-8.3 Principal Thoroughfares; Type B
12-8.4 General Thoroughfares
12-8.5 General Arterials
12-8.6 Industrial Arterials
12-8.7 Property Line Returns
12-8.8 Improvement Agreement
12-8.9 Improvement Placement and Construction
12-8.10 Deviations
12-8.11 Road Width Review and Findings
12-8.12 Road Access
12-8.13 Notice to Building Permit Applicant
12-8.14 Acceptance of Building Permit
12-8.15 Town Participation
12-8.16 City Engineer Determines Road Alignment
12-8.17 Lots Affected by Road Widening
12-8.18 Sidewalks and Pedestrian Paths
12-9.1 Applicability
12-9.2 Appeal to Commission
12-9.3 Appeal to Town Council
12-9.4 Modifications
12-10.1 Declaration of Policy
12-10.2 Requirements; Adopted Section of Streets and Highways Plan; Filing Required
12-10.3 Effect of Plan on Building Permit Issuance
12-10.4 Chapter Administration
12-10.5 Building Permit Issuance After Appeal; Conditions Required
12-10.6 Exemptions
12-11.1 Purpose and Intent
12-11.2 Permit Required
12-11.3 Curb Painting Requirements
12-11.4 Termination of Permit
12-12 RESERVED¶
Get a plain-English answer with a citation back to this text.
Ask AI about this code