Skip to content

Title 5 — BUILDINGS AND STRUCTURES

Chapter XI — ELECTRIC VEHICLE CHARGING STATION PERMITS

Costa Mesa Municipal Code · 2026-07 edition · updated 2026-10-02 · Costa Mesa

§ 5-144. Intent and purpose.

§ 5-145. Definitions.

§ 5-146. Expedited permitting process.

§ 5-147. Electric vehicle charging station requirements.

§ 5-148. Permit application processing.

§ 5-149. Technical review.

§ 5-150. Appeals.

§ 5-151. Fees.

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — Costa Mesa Municipal Code

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.