§ 13-234. Check and transmittal of final map.

Costa Mesa Zoning Code · 2026-06 edition · updated 2026-07-25 · Costa Mesa

  • (a) Engineer's check. After issuance of a receipt for the final map, the city engineer shall examine it as to sufficiency of affidavits and acknowledgments, correctness of surveying data, mathematical data and computations, and such other matters as require checking to insure compliance with the provisions of the Subdivision Map Act and this article.

  • (b) Transmittal to city council. If the final map is found to be correct in form and the matters shown on the map are sufficient, the city engineer shall endorse his approval on the map and transmit it to the city council together with plans and specifications of proposed improvements and such other matters as are required to enable the city council to consider the final map. If the final map is not found to be correct in form, the city engineer shall return the final map to the subdivider together with a statement setting

forth the grounds for its return; the city engineer shall, however, not forward the map to the city council until the requirements of sections 13-229 , Preparation, form and contents, to and including section 13-231 , Fees, have been met by the subdivider. (Ord. No. 97-11, § 2, 5-5-97)

Get a plain-English answer with a citation back to this text.

Ask AI about this code
Contents — Costa Mesa Zoning Code

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.