Title 13 — Planning, Zoning and Development›Chapter V — DEVELOPMENT STANDARDS›Article 9 — General Site Improvement Standards
§ 13-71. Utility requirements.
Costa Mesa Zoning Code · 2026-06 edition · updated 2026-07-25 · Costa Mesa
(a) No utility equipment or facility such as gas meters, electrical meters, telephone pedestal mounted terminal boxes, surface mounted electrical transformers, fire hydrants or any other potential obstruction shall be located within the approved parking and/or turn radius area unless installed underground in a vault having an approved traffic lid. All such equipment or facilities located aboveground shall comply with the requirements and meet with the approval of the planning division and serving utility.
(b) Installation or relocation of all utility equipment or facilities shall be performed in a manner so as to obscure the installation of said equipment or facility from view from any place on or off the property. The installation or relocation of the equipment or facility shall comply with the requirements and meet with the approval of the public utility and planning division.
(c) Sewer and water system improvements shall comply with the requirements and meet with the approval of the serving utility.
(d) As an additional requirement only for new developments, new construction or as a condition of approval of a new tract, a revised or reactivated tract or any parcel map, all utilities shall be installed underground on the building site in accordance with the serving utilities' rules, regulations and tariffs on file with the state public utilities commission. The development services director may waive the required undergrounding whenever it is found and determined that such installation is not practically feasible due to economic or technological factors found to exist at the site. Provided, however, that all required termination facilities on the structure and conduit, at least to the outer wall, at a point designated by the serving utility, shall be furnished and installed to facilitate future connection to an underground system.
(Ord. No. 97-11, § 2, 5-5-97; Ord. No. 01-19, § 1, 8-20-01)
Get a plain-English answer with a citation back to this text.
Ask AI about this code▸ Contents — Costa Mesa Zoning Code
-
▸ Title 13 — Planning, Zoning and Development
Overview- Chapter I — IN GENERAL
- Chapter II — ZONING DISTRICTS ESTABLISHED
- Chapter III — PLANNING APPLICATIONS
- Chapter IV — CITYWIDE LAND USE MATRIX
-
▸ Chapter V — DEVELOPMENT STANDARDS
Overview- Article 1 — Residential Districts
- Article 2 — Residential Common Interest Developments
- Article 2.5 — Residential Small lot Subdivisions
- Article 3 — Commercial Districts
- Article 4 — Establishments Where Food or Beverages are Served
- Article 4.5 — Development Standards for Churches and Other Pla…
- Article 5 — Industrial Districts
- Article 5.5 — Non-Residential Common Interest Developments
- Article 6 — Planned Development
- Article 7 — Institutional and Recreational, Institutional and …
- Article 8 — Floor Area Ratios
- Article 10 — Floodway and Floodplain Districts
- Article 11 — Mixed-Use Overlay District
- Article 12 — Residential Incentive Overlay District
- Article 1 — Residential Districts
- Article 2 — Non-Residential Districts
- Article 3 — Development Standards
- Chapter VII — LANDSCAPING STANDARDS
- Chapter VIII — SIGNS
- Chapter IX — SPECIAL LAND USE REGULATIONS
- Chapter X — NONCONFORMING USES, DEVELOPMENTS AND LOTS
- Chapter XI — SUBDIVISIONS
- Chapter XII — SPECIAL FEE ASSESSMENTS
- Chapter XIII — NOISE CONTROL
- Chapter XIV — OIL DRILLING
- Chapter XV — GROUP HOMES
- Chapter XVII — AFFORDABLE HOUSING ORDINANCE