Corte Madera Municipal Code Ch. 15.08 Energy Code
Corte Madera Municipal Code · 2026-10 edition · updated 2026-10-04 · Corte Madera
Cite as: Corte Madera Municipal Code Chapter 15.08 · Text as of 2026-10-04
Footnotes:
--- (8) ---
Editor's note— Ord. No. 1048, § 8, adopted October 21, 2025, repealed the former Ch. 15.08, §§ 15.08.010—15.08.040, and enacted a new Ch. 15.08 as set out herein. The former Ch. 15.08 pertained to similar subject matter and derived from Ord. No. 1022, § 6, adopted Nov. 15, 2022 and Ord. No. 1040, § 3, adopted July 16, 2024.
15.08.010 - Adoption by reference.¶
The 2025 California Energy Code, known as Part 6, Title 24 of the California Code of Regulations, is hereby adopted by reference with amendments as set forth in this chapter.
(Ord. No. 1048, § 8, 10-21-2025)
15.08.020 - Requirements for additions and alterations—Local amendments to 2025 California Energy Code.¶
Section 100.0 - SCOPE - of Subchapter 1 - ALL OCCUPANCIES - GENERAL PROVISIONS - of the 2025 California Energy Code is amended to add a new section (i) as follows:
(i) Single-Family Building Remodel Energy Reach Code. In addition to all requirements of the California Energy Code applicable to Existing Single-Family Building additions and alterations, the energy efficiency, renewable energy, and electric readiness measures specified in Section 150.0(w) shall be required for Covered Projects.
Section 100.1(b) - Definitions - of Subchapter 1 of the 2025 California Energy Code is amended by adding the following definition:
"Covered Project(s)" means additions or alterations, as described below, to a single-family residential building originally permitted for construction on or before December 31, 2010, which equal or exceed 500 square feet of interior conditioned space. Any addition or alteration to the same structure in the preceding 36 months shall be counted towards the 500 square feet threshold, except those additions or alterations made prior to the initial adoption of this ordinance. When any changes are made in the building, such as walls, columns, beams or girders, floor or ceiling joists and coverings (subfloor and drywall), roof rafters, roof diaphragms, foundations, piles or retaining walls or similar components, the floor area of all rooms affected by such changes shall be included in computing floor areas for the purpose of applying this definition.
This definition does not apply to project scopes that are solely limited to any of the following: the replacement and upgrading of residential roof coverings, exterior wall finishes and/or floor finishes; alterations that add no more than 75 square feet of fenestration; alterations that add no more than 16 square feet of skylight area with a maximum U-factor of 0.55 and a maximum SHGC of 0.30; or alterations that are limited to providing access for persons with disabilities. A Covered Project shall not include a project that is considered to be a newly constructed building under the California Energy Code, Title 24, Part 6. The final determination of whether a project meets the definition of a Covered Project shall be made by the Building Official or designee.
The first two paragraphs of Section 150.0 of Subchapter 7 - SINGLE-FAMILY RESIDENTIAL BUILDINGS - MANDATORY FEATURES AND DEVICES - are amended to read as follows:
Single-family residential buildings shall comply with the applicable requirements of Sections 150(a) through 150.0(w).
NOTE: The requirements of Sections 150.0(a) through 150.0(v) apply to newly constructed buildings. Sections 150.2(a) and 150.2(b) specify which requirements of Sections 150.0(a) through 150.0(v) also apply to additions or alterations. In addition, Covered Projects shall also be required to comply with Section 150.0(w).
Section (w) is added to Section 150.0 as follows:
(w) A Covered Project shall install a set of measures based on building vintage from the Measure Menu in Table 1B to achieve a total Measure Point Score that is equal to or greater than the Target Score in Table 1A. In addition, all mandatory measures listed in Table 1B shall be installed. Installed measures shall meet the specifications in Table 2, List of Measure Specifications.
Building vintage is the year in which the original construction permit for the building was submitted, as documented by building department records, or the permit issue date of an addition or alteration that satisfied the Performance Standards (California Energy Code, Title 24, Part 6, Section 150.1(b)) that were in effect at that time, whichever is later.
Exceptions to 150.0(w):
(i) If a project is limited solely to a newly created attached Accessory Dwelling Units (ADUs) or Junior Accessory Dwelling Unit (JADU) as defined in § 18.31.020, Corte Madera Town Code, the project shall be exempt from complying with this Section. A newly created ADU and JADU shall include either additions or conversions of existing space. This exception DOES NOT apply to a Covered Project of an existing ADU or JADU.
(ii) If a project occurs in a Mobile Home, Manufactured Housing, or Factory-built Housing as defined in Division 13 of the California Health and Safety 12 Code (commencing with section 17000 of the Health and Safety Code), the project shall be exempt from complying with this Section.
(iii) If, due to conditions specific to the project, it is technically or economically infeasible to achieve compliance, the Building Official may reduce the Target Score and/or waive some or all the mandatory requirements.
(iv) If the applicant demonstrates, using Commission-certified compliance software as specified by Section 10-109(c) and Section 10-116, that the Energy Budget of the Proposed Building Design would be less than or equal to the Energy Budget of the building under the project if it included any set of measures that would achieve compliance under this Section, the project shall be exempt from complying with this Section.
(v) If the applicant resides in the dwelling unit and demonstrates that they qualify for the California Alternative Rates for Energy (CARE), or Family Electric Rate Assistance (FERA) program, or if the applicant is the owner of the dwelling unit which is occupied by a dependent who demonstrates that they qualify for the California Alternative Rates for Energy (CARE), or Family Electric Rate Assistance (FERA) program, the project may comply by installing, to the specifications in Table 2, the following measures:
(a) E1: Lighting Measures; and
(b) E2: Water Heating Package.
Table 1A: Target Score
| Building Vintage | |||
|---|---|---|---|
| Pre-1978 | 1978-1991 | 1992-2010 | |
| Target Score | 8 | 7 | 2 |
Table 1B: Measure Menu
| ID | ||||
|---|---|---|---|---|
| ID | Measure | Building Vintage | Building Vintage | Building Vintage |
| Pre-1978 | 1978-1991 | 1992-2010 | ||
| E1 | Lighting Measures | Mandatory | Mandatory | Mandatory |
| E2 | Water Heating Package | 2 | 2 | 2 |
| E3 | Air Sealing | 2 | 1 | 1 |
| E4 | R-38 Attic Insulation | 4 | 2 | — |
| E5 | Duct Sealing | 3 | 2 | 1 |
| E6 | New Ducts + Duct Sealing | 6 | 4 | 1 |
| E7 | Windows | 4 | 3 | 4 |
| E8 | R-15 Wall Insulation | 5 | — | — |
| E10 | R-19/R-30 Raised Floor Insulation | 9/10 | 9/10 | — |
| FS1 | Heat Pump Water Heater (HPWH) Replacing Gas | 12 | 12 | 12 |
| FS2 | High Eff HPWH Replacing Gas | 13 | 13 | 13 |
| FS3 | Heat Pump Water Heater (HPWH) Replacing Electric | 5 | 5 | 5 |
| FS4 | High Eff HPWH Replacing Electric | 6 | 6 | 6 |
| FS5 | Heat Pump Space Heater | 18 | 13 | 12 |
| FS6 | High Eff Heat Pump Space Heater | 19 | 14 | 12 |
| FS8 | Heat Pump Clothes Dryer | 1 | 1 | 1 |
| FS9 | Induction Cooktop | 1 | 1 | 1 |
| PV1 | Solar PV + Electric Ready Pre-Wire | 13 | 13 | 12 |
| ER1 | Electric Readiness - Service Upgrade | Mandatory for certain scopes. See Table 2. | ||
| ER2 | Electric Readiness - End Uses | Mandatory for certain scopes. See Table 2. |
The following conditions also apply to Table 1B:
(a) Unless otherwise specified, the requirements shall apply to the entire dwelling unit, not just the additional or altered portion.
(b) Measures from the Measure Menu in Table 1B and specified in Table 2, that already exist in the home, may be counted towards compliance with these requirements, unless otherwise specified in Table 2.
(c) Measures from the Measure Menu in Table 1B that are to be installed to satisfy requirements under the State Energy Code, Title 24, Part 6, may not be counted towards compliance with these requirements. Where these requirements conflict with other Energy Code requirements, the stricter requirements shall prevail.
____________
Table 2: List of Measure Specifications
| ID | Measure Specification |
|---|---|
| Energy Measures | Energy Measures |
| E1 | Lighting Measures: Install lighting with an efficiency of 45 lumens per watt or greater in all interior and exterior screw-in fixtures. Install photocell, occupancy sensor or energy management system controls that meet the requirements of 150.0(k)3 in all outdoor lighting permanently mounted to a residential building or to other buildings on the same lot. |
| E2 | Water Heating Package: Insulate all accessible hot water pipes with pipe insulation a minimum of ¾ inch thick. This includes insulating the supply pipe leaving the water heater, piping to faucets underneath sinks, and accessible pipes in attic spaces or crawlspaces. Upgrade fittings in sinks and showers to meet current California Green Building Standards Code (Title 24, Part 11) Section 4.303 water efficiency requirements. Exception: Upgraded fixtures are not required if existing fixtures have rated or measured flow rates of no more than ten percent greater than 2025 California Green Building Standards Code (Title 24, Part 11) Section 4.303 water efficiency requirements. |
| E3 | Air Sealing: Seal all accessible cracks, holes, and gaps in the building envelope at walls, floors, and ceilings. Pay special attention to penetrations including plumbing, electrical, and mechanical vents, recessed can light luminaires, and windows. Weather-strip doors if not already present. Verification shall be conducted following a prescriptive checklist that outlines which building aspects need to be addressed by the permit applicant and verified by an inspector. Compliance can also be demonstrated with blower door testing conducted by a certified ECC Rater no more than three years prior to the permit application date that either: a) shows at least a 30 percent reduction from pre-retrofit conditions; or b) shows that the number of air changes per hour at 50 Pascals pressure difference (ACH50) does not exceed ten for Pre-1978 vintage buildings, seven for 1978 to 1991 vintage buildings and five for 1992-2010 vintage buildings. If combustion appliances are located within the pressure boundary of the building, conduct a combustion safety test by a certified ECC Rater or a professional certified by the Building Performance Institute, in accordance with the BPI Technical Standards for the Building Analyst Professional. |
| E4 | R-38 Attic Insulation: Attic insulation shall be installed to achieve a weighted assembly U-factor of 0.025 or insulation installed at the ceiling level shall have a thermal resistance of R-38 or greater for the insulation alone. Recessed downlight luminaires in the ceiling shall be covered with insulation to the same depth as the rest of the ceiling. Luminaires not rated for insulation contact must be replaced or fitted with a fire-proof cover that allows for insulation to be installed directly over the cover. Exception: In buildings where existing R-30 is present and existing recessed downlight luminaires are not rated for insulation contact, insulation is not required to be installed over the luminaires. |
| E5 | Duct Sealing: Air seal all space conditioning ductwork to meet the requirements of 2025 Title 24, Part 6, Section 150.2(b)1E. The duct system must be tested by an ECC Rater no more than three years prior to the Covered Project permit application date to verify the duct sealing and confirm that the requirements have been met. This measure may not be combined with the New Ducts and Duct Sealing measure in this Table. Exception: Buildings without ductwork or where the ducts are in conditioned space. |
| E6 | New Ducts + Duct Sealing: Replace existing space conditioning ductwork with new R-6 ducts that meet the requirements of 2025 Title 24 Section 150.0(m)11. This measure may not be combined with the Duct Sealing measure in this Table. To qualify, a preexisting measure must have been installed no more than three years before the Covered Project permit application date. |
| E7 | Windows: Replace at least 50% of existing windows with high performance windows with an area-weighted average U-factor no greater than 0.27. |
| E8 | R-15 Wall Insulation: Install wall insulation in all exterior walls to achieve a weighted U-factor of 0.095 or install wall insulation in all exterior wall cavities that shall result in an installed thermal resistance of R-15 or greater for the insulation alone. |
| E10 | R-19/R-30 Floor Insulation: Raised-floors shall be insulated such that the floor assembly has an assembly U-factor equal to or less than U-0.037/U-0.028, or shall be insulated between wood framing with insulation having an R-value equal to or greater than R-19/R-30. |
| Fuel Substitution Measures | Fuel Substitution Measures |
| FS1 | Heat Pump Water Heater (HPWH) Replacing Gas: Replace existing natural gas water heater with a heat pump water heater that meets the requirements of Sections 110.3 and 150.2(b)1.H.iii.b. |
| FS2 | High Efficiency Heat Pump Water Heater (HPWH) Replacing Gas: Replace existing natural gas water heater with a heat pump water heater with a Northwest Energy Efficiency Alliance (NEEA) Tier 3 or higher rating that also meets the requirements of Sections 110.3 and 150.2(b)1.H.iii.c. |
| FS3 | Heat Pump Water Heater (HPWH) Replacing Electric: Replace existing electric resistance water heater with a heat pump water heater that meets the requirements of Sections 110.3 and 150.2(b)1.H.iii.b. |
| FS4 | High Efficiency Heat Pump Water Heater (HPWH) Replacing Electric: Replace existing electric resistance water heater with heat pump water heater with a Northwest Energy Efficiency Alliance (NEEA) Tier 3 or higher rating that also meets the requirements of Sections 110.3, and 150.2(b)1.H.iii.c. |
| FS5 | Heat Pump Space Heater: Replace all existing gas and electric resistance primary space heating systems with an electric-only heat pump system that meets the requirements of Sections 110.3, 150.2(b)1.C, 150.2(b)1.E, 150.2(b)1.F, and 150.2(b)1.G. |
| FS6 | High Efficiency Heat Pump Space Heater: Replace all existing gas and electric resistance primary space heating systems with a system that meets the requirements of Sections 110.3 and 150.2(b)1.C, 150.2(b)1.E, 150.2(b)1.F, and 150.2(b)1.G and one of the following: A. A ducted electric-only heat pump system with a SEER2 rating of 16.5 or greater, an EER2 rating of 12.48 or greater and an HSPF2 rating of 9.5 or greater; or B. A ductless mini-split heat pump system with a SEER2 rating of 14.3 or greater, an EER2 rating of 11.7 or greater and an HSPF2 rating of 7.5 or greater |
| FS8 | Heat Pump Clothes Dryer: Replace all existing gas and electric resistance clothes dryers with heat pump dryers with no resistance element and cap the gas line(s). |
| FS9 | Induction Cooktop: Replace all existing gas and electric resistance stove tops with inductive stove top(s) and cap the gas line(s). |
| Solar PV and Electric Readiness Measures | |
| PV1 | Solar PV+ Electric Ready Pre-Wire: For New Solar PV Systems: Install a new solar PV system that meets the requirements of Section 150.1(c)14. In addition, upgrade the panelboard to meet the requirements of ER1 and install any two of the other measures from ER2.A - ER2.F. For Existing PV Systems: If the home already has an existing solar PV system that meets the requirements of Section 150.1(c)14, to claim credit for this measure, PV1, upgrade the panelboard to meet the requirements of ER1 and install any two of the other measures from ER2.A - ER2.F. |
| ER1 | Electric Readiness - Service Upgrade: Upgrade the panelboard serving the individual dwelling unit to provide circuit breaker spaces for a heat pump water heater, heat pump space heater, electric cooktop and electric clothes dryer with the capacities specified in Section 150.0 (n)1, (t), (u) and (v); or, provide electrical load calculations and appliance specifications for serving all of these end-uses with a minimum 100-amp panel. |
| ER2 | Electric Readiness Measures - End Uses: For any covered project, if the service panel is being upgraded or to claim the Solar PV + Electric Ready Pre-Wire credit, satisfy any two of the electric-readiness measures below. If the kitchen is being remodeled, make the range electric ready as specified in ER2, Item C below and upgrade the panelboard as specified under ER1. If the laundry room is being remodeled, make the dryer electric ready as specified in Item D below and upgrade the panelboard as specified under ER1. Meet the requirements below, that otherwise apply to newly constructed buildings: A. Heat Pump Water Heater Ready, as specified in Section 150.0(n)1. B. Heat Pump Space Heater Ready, as specified in Section 150.0(t). C. Electric Cooktop Ready, as specified in Section 150.0(u). D. Electric Clothes Dryer Ready, as specified in Section 150.0(v). E. Battery Energy Storage Systems (BESS) Ready, as specified in Section 150.0(s). F. EV Charger Ready. Install a dedicated 208/240-volt branch circuit as specified in the California Green Building Code, Title 24, Part 11, Section A4.106.8.1, which otherwise applies to new construction. Exception: If an electrical permit is not otherwise required for the project other than compliance with the laundry room and kitchen remodel requirements of this Item, ER2. |
(Ord. No. 1048, § 8, 10-21-2025)
____________
15.08.030 - Violation—Penalty.¶
(a) Any person who commits a violation of any of the provisions of this chapter, including those that have been adopted by reference herein, is guilty of a misdemeanor and upon conviction is punishable by a fine of not more than one thousand dollars, imprisonment for six months, or both.
(b) Any person violating any of the provisions or failing to comply with any of the requirements of this chapter, including those that have been adopted by reference herein, shall be subject to administrative citation and fines as set forth in Chapter 9.05 of Title 9 of this code or any other penalties set forth in Chapter 1.04 of this code.
(Ord. No. 1048, § 8, 10-21-2025)
15.08.040 - No Mandatory Duty.¶
By adoption of this chapter the town council does not intend to create, establish, or impose any mandatory duty or liability on the part of the town, its officers, employees, or any other person acting on its behalf, notwithstanding the use of "shall," "will," "must," or similar terms within this chapter.
(Ord. No. 1048, § 8, 10-21-2025)