Title 15 — BUILDINGS AND CONSTRUCTION
§ 15.03
Corning Municipal Code · 2026-09 edition · updated 2026-10-02 · Corning
15.03.040 - Review of applications.¶
Corning is adopting this chapter in order to create an expedited, streamlined permitting process for electric vehicle charging stations.
A.
To facilitate an expedited permitting process, the building official is hereby authorized and directed to develop and adopt a checklist of all requirements with which electric vehicle charging stations shall comply to be eligible for expedited review.
B.
The expedited, streamlined permitting process and checklist may refer to the recommendations contained in the most current version of the "Plug-In Electric Vehicle Infrastructure Permitting Checklist" of the "Zero- Emission Vehicles in California: Community Readiness Guidebook" as published by the Governor's Office of Planning and Research. The checklist shall be published on the City of Corning internet website.
C.
Prior to submitting an application, the applicant shall verify that the installation of an electric vehicle charging station will not have a specific, adverse impact to public health and safety and building occupants. Verification by the applicant includes, but is not limited to: Electrical system capacity and loads; electrical system wiring, bonding, and overcurrent protection; building infrastructure affected by electric vehicle charging station equipment and associated conduits; and areas of electric vehicle charging station equipment and vehicle parking.
D.
An application under this section may be submitted by personal, mailed, or electronic (including electronic signatures on all forms, applications, and other documentation) submittal together with any required permit processing and inspection fees.
E.
An application that satisfies the requirements in the checklist, as determined by the building official, shall be deemed complete. Upon receipt of an incomplete application, the building official shall issue a written correction notice detailing all deficiencies in the application and any additional information required to be eligible for expedited permit issuance.
F.
Upon confirmation by the building official of the application and supporting documentation being complete, meeting the requirements of the checklist, and being consistent with all applicable laws and health and safety standards, the building official shall administratively approve the application and issue all required permits or authorizations. Such approval does not authorize an applicant to energize or utilize the electric vehicle charging station until all required inspections have been finaled by the City of Corning. Such approval also does not authorize an applicant to connect the electric vehicle charging station to the local utility provider's electricity grid. The applicant is responsible for obtaining such approval or permission from the local utility provider.
G.
An electric vehicle charging station shall meet all applicable health and safety standards and requirements imposed by state and city permitting authorities and shall meet all applicable safety and performance standards established by the 2016 California Electrical Code, the Society of Automotive Engineers, the National Electrical Manufacturers Association, and accredited testing laboratories such as underwriters laboratories and, where applicable, the rules of the Public Utilities Commission regarding safety and reliability.
H.
Any conditions imposed on an application to install an electric vehicle charging station shall be designed to mitigate the specific, adverse impact upon the public health or safety at the lowest cost possible. The building official shall not condition the approval of any electric vehicle charging station permit on the approval of such a system by an association, as that term is defined by Civil Code Section 4080.
I.
If the building official makes a finding, based on substantial evidence, that the electric vehicle charging station could have a specific, adverse impact upon the public health or safety, the applicant shall be required to apply for a conditional use permit. The decision of the building official that the electric vehicle charging station could have a specific, adverse impact upon the public health or safety may be appealed to the planning commission.
J.
When making a decision on a conditional use permit for an electric vehicle charging station, the planning commission, as well as the city council on appeal, may not deny the conditional use permit to install an electric vehicle charging station unless it makes written findings based upon substantial evidence in the record that the proposed installation would have a specific, adverse impact upon the public health or safety, and there is no feasible method to satisfactorily mitigate or avoid the specific, adverse impact. The findings shall include the basis for the rejection of potential feasible alternatives of preventing the adverse impact.
(Ord. No. 697, § 1, 3-22-2022)
15.45.050 - Inspections.¶
A.
Inspections shall be required and performed by the building division for electric vehicle charging stations.
B.
The inspections shall be done in an efficient inspection process, in a timely manner, and should include consolidated inspections when applicable; inspection measures taken should be consistent with safety requirements that ensure that the electric vehicle charging stations are properly installed.
C.
If electric vehicle charging stations fail inspections, a subsequent inspection is authorized but need not conform to the requirements of this chapter.
(Ord. No. 697, § 1, 3-22-2022)