Title 15 — BUILDINGS AND CONSTRUCTION›Chapter 15.30 — GRADING, EROSION AND SEDIMENT CONTROL
Article VIII — Requirements for Permit Finaling
Colfax Municipal Code · 2026-09 edition · updated 2026-10-02 · Colfax
15.30.080 - Final inspection.¶
15.30.081 - Changed conditions.¶
15.30.082 - Final geotechnical report.¶
15.30.083 - Special inspection.¶
15.30.084 - Non-compliance notification by private geotechnical engineer or civil…¶
15.30.085 - Periodic progress reports by private geotechnical engineer or civil…¶
15.30.086 - Progress report by permittee.¶
15.30.087 - Submit "As-Built" plan.¶
15.30.088 - Other responsibilities of permittee.¶
Get a plain-English answer with a citation back to this text.
Ask AI about this code