Skip to content

Title 15 — BUILDINGS AND CONSTRUCTION›Chapter 15.30 — GRADING, EROSION AND SEDIMENT CONTROL

Article VIII — Requirements for Permit Finaling

Colfax Municipal Code · 2026-09 edition · updated 2026-10-02 · Colfax

15.30.080 - Final inspection.

15.30.081 - Changed conditions.

15.30.082 - Final geotechnical report.

15.30.083 - Special inspection.

15.30.084 - Non-compliance notification by private geotechnical engineer or civil…

15.30.085 - Periodic progress reports by private geotechnical engineer or civil…

15.30.086 - Progress report by permittee.

15.30.087 - Submit "As-Built" plan.

15.30.088 - Other responsibilities of permittee.

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — Colfax Municipal Code

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.