Skip to content

Title 5 — BUSINESS LICENSES AND REGULATIONS›Chapter 5.44 — CABLE TELEVISION FRANCHISE

Article VI — Design and Construction Standards

Chino Municipal Code · 2026-09 edition · updated 2026-10-02 · Chino

5.44.230 - System Design—Compliance.

5.44.235 - Geographical coverage—Construction nondiscriminatory.

5.44.240 - Cablecasting facilities.

5.44.245 - System construction schedule.

5.44.250 - Construction delay—Remedies.

5.44.255 - Provision of service—Time limit.

5.44.260 - Undergrounding of cable—Required when.

5.44.265 - Undergrounding of cable—New development.

5.44.270 - Undergrounding of cable—Multiple-dwelling units.

5.44.275 - Street occupancy—Construction requirements.

5.44.280 - Construction standards—Compliance required.

5.44.285 - Technical standards—Compliance.

5.44.290 - Compliance testing—Procedure.

5.44.295 - Compliance testing—Special test.

5.44.300 - Areawide interconnection.

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — Chino Municipal Code

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.