Skip to content

Title 13 — WATER, SEWERS AND UTILITIES

Chapter 13.12 — SEWERS—CONNECTIONS AND EXTENSIONS

Chino Municipal Code · 2026-09 edition · updated 2026-10-02 · Chino

13.12.010 - New construction—Connection required.

13.12.020 - Construction in streets or alleys— Required.

13.12.030 - Connection standards.

13.12.040 - Connections—Contractor's duties.

13.12.050 - Specifications for compaction and backfill.

13.12.060 - Sewer lines—Construction, inspection and acceptance.

13.12.070 - Subdivisions with new streets and sewers—City's responsibility.

13.12.080 - Extension and construction of new sewers where not available on existing streets.

13.12.090 - Sewer mains installed by developer—Reimbursement agreement.

13.12.091 - Sewer service within the city's sphere of influence.

13.12.092 - Sewer service outside the city's sphere of influence.

13.12.100 - Sewer collection system fee.

13.12.110 - Additional charges for new sewer lines.

13.12.120 - Street repair deposit.

13.12.130 - Sewer connection fees—Designated.

13.12.140 - Sewer connection fee disposition.

13.12.150 - Maintenance—Sewer laterals.

13.12.160 - Effect of failure to rectify settling or instability of excavation backfill.

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — Chino Municipal Code

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.