Title 13 — WATER, SEWERS AND UTILITIES
Chapter 13.12 — SEWERS—CONNECTIONS AND EXTENSIONS
Chino Municipal Code · 2026-09 edition · updated 2026-10-02 · Chino
13.12.010 - New construction—Connection required.¶
13.12.020 - Construction in streets or alleys— Required.¶
13.12.030 - Connection standards.¶
13.12.040 - Connections—Contractor's duties.¶
13.12.050 - Specifications for compaction and backfill.¶
13.12.060 - Sewer lines—Construction, inspection and acceptance.¶
13.12.070 - Subdivisions with new streets and sewers—City's responsibility.¶
13.12.080 - Extension and construction of new sewers where not available on existing streets.¶
13.12.090 - Sewer mains installed by developer—Reimbursement agreement.¶
13.12.091 - Sewer service within the city's sphere of influence.¶
13.12.092 - Sewer service outside the city's sphere of influence.¶
13.12.100 - Sewer collection system fee.¶
13.12.110 - Additional charges for new sewer lines.¶
13.12.120 - Street repair deposit.¶
13.12.130 - Sewer connection fees—Designated.¶
13.12.140 - Sewer connection fee disposition.¶
13.12.150 - Maintenance—Sewer laterals.¶
13.12.160 - Effect of failure to rectify settling or instability of excavation backfill.¶
Get a plain-English answer with a citation back to this text.