Skip to content

Title 8 — BUILDINGS AND CONSTRUCTION

Chapter 8.24 — FLOODPLAIN MANAGEMENT

Cathedral City Municipal Code · 2026-07 edition · updated 2026-10-02 · Cathedral City

§ 8.24.010. Statutory authorization, findings of fact, purpose and methods.

§ 8.24.020. Definitions.

§ 8.24.030. General provisions.

§ 8.24.040. Administration.

§ 8.24.050. Provisions for flood hazard reduction.

§ 8.24.060. Variance procedure.

§ 8.24.070. Storm water storage facilities.

§ 8.24.080. Public nuisance.

§ 8.24.090. Penalties and remedies.

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — Cathedral City Municipal Code

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.