Skip to content

Division 4 — (Reserved)

§ 9146.3. Other Site Development Standards - Fences, Walls and Hedges.

Carson Zoning Code · 2026-06 edition · updated 2026-07-25 · Carson

  • A. Except as provided in Division 8 of this Part [[1]] :

    1. A solid masonry wall shall be constructed along the inside of any lot line (or upon the lot line with the consent of the adjoining property owner) if the lot line abuts a residential zone or if the lot line abuts an alley that borders a residential zone. In areas other than the required front yard area and any abutting future right-of-way area, such wall shall be a minimum of six (6) feet and a maximum of eight (8) feet in height. In a required front yard area and any abutting future right-of-way area, such wall may not exceed three and one-half (3-1/2) feet in height, except fencing material of any type may extend above the three and one-half (31/2) foot solid masonry portion to a height not exceeding eight (8) feet, provided such extended portion does not impair vision by obscuring more than ten (10) percent of the area in the vertical plane.

    2. No fence, wall or hedge in an industrial zone shall exceed a height of fifty (50) feet.

    3. The height of fences, walls and hedges shall be measured from the finished grade at each point along the fence, wall or hedge. Where there is a difference between the grade on the two (2) sides of the fence, wall or hedge, the higher grade shall be used.

    • [1] Division 8 applies only to vehicle dismantling yards, junk and salvage yards, vehicle impounding yards and retail petroleum outlets.
  • (Ord. 16-1590, Exh. B (§ 10); Ord. 90-905 § 2)

Get a plain-English answer with a citation back to this text.

Ask AI about this code
Contents — Carson Zoning Code
Carson Zoning Code
  1. Article 9 — Planning and Zoning
  2. Chapter 1 — ZONING
  3. Division 1 — Title, Authority And Purpose
  4. Division 2 — Format
  5. Division 3 — Zoning Classifications
  6. Division 4 — Zoning Boundaries
  7. Division 1 — Uses Permitted
  8. Division 2 — Accessory Uses
  9. Division 3 — Conditional Use Criteria
  10. Division 4 — Density
  11. Division 5 — Site Requirements
  12. Division 6 — Site Development Standards
  13. Division 7 — Environmental Effects
  14. Division 8 — Special Requirements For Certain Uses
  15. Division 4 — (Reserved)
  16. Division 8 — Special Requirements For Certain Uses
  17. Division 4 — (Reserved)
  18. Division 8 — Special Requirements For Certain Uses
  19. Division 4 — (Reserved)
  20. Division 9 — Special Use Zones
  21. Division 1 — Street Dedication And Improvement
  22. Division 2 — Vehicular Parking, Loading And Maneuvering Areas
  23. Division 3 — Walls
  24. Division 4 — Trash And Recycling Areas
  25. Division 5 — Transportation Demand And Trip Reduction Measures
  26. Division 6 — Project Grading
  27. Division 7 — Signs
  28. Division 8 — Water Efficient Landscaping
  29. Division 1 — Procedures In General
  30. Division 2 — Procedures By Type
  31. Division 1 — Applicability Of Regulations
  32. Division 2 — Nonconformities
  33. Division 3 — Relationship Of Zoning Regulations To Other Laws …
  34. Division 4 — Interpretation Of Provisions
  35. Division 5 — Violations And Penalties
  36. Division 6 — Assignment Of Authority, Powers And Duties
  37. Division 1 — Definitions

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.