Earlier editions: 2020-112018-112026-09
DIVISION 21. WATER CONSERVATION DISTRICTS 74000-76501›PART 9. GROUND WATER CHARGE 75500-75642›CHAPTER 2. Establishment of Zones and Registration of Water-Measuring Devices 75540-75544
§ 75542
California Water Code · 2026-10 edition · updated 2026-10-04 · California
Any new water-producing facility constructed or reestablished after the period prescribed in Section 75541 shall be registered with the district and, if required by the board, measured with a water-measuring device satisfactory to the district within 30 days after the completion or reestablishment thereof.
(Added by Stats. 1965, Ch. 75.)
Get a plain-English answer with a citation back to this text.
Ask AI about this code