Earlier editions: 2020-112018-112026-09
DIVISION 21. WATER CONSERVATION DISTRICTS 74000-76501›PART 6. FINANCIAL PROVISIONS 74750-74977›CHAPTER 3. Bonds 74790-74872›ARTICLE 2. Initiation of Proceedings 74800-74804
§ 74804
California Water Code · 2026-10 edition · updated 2026-10-04 · California
In determining the amount of bonded indebtedness to be incurred, the board may include all costs and estimated costs incidental to or connected with the acquisition, construction or financing of the works or property set forth in the report required by Section 74800, and all engineering, inspection, legal and fiscal agent’s fees, costs of the bond election and of the issuance of the bonds, and bond interest estimated to accrue during the construction period and for a period of not to exceed 12 months after completion of construction.
(Added by Stats. 1971, Ch. 359.)
Get a plain-English answer with a citation back to this text.
Ask AI about this code