Skip to content

DIVISION 6. CONSERVATION, DEVELOPMENT, AND UTILIZATION OF STATE WATER RESOURCES 10000-12999›PART 6. WATER DEVELOPMENT PROJECTS 12570-12949.5›CHAPTER 2. Approved Projects 12639-12751›ARTICLE 3. Projects in Other Watersheds 12671-12749.99

§ 12682

California Water Code · 2026-09 edition · updated 2026-10-03 · California

The general comprehensive plan for flood control in the basins of the Los Angeles and San Gabriel Rivers and Ballona Creek are adopted and authorized as set forth in House Document Numbered 838, Seventy-sixth Congress, Third Session, and approved in the act of Congress approved August 18, 1941, at an estimated cost to the State of twenty-two million five hundred thousand dollars ($22,500,000).

(Added by Stats. 1953, Ch. 196.)

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — California Water Code

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.