Skip to content

DIVISION 11. IRRIGATION DISTRICTS 20500-29978›PART 9. BONDS 24950-25402›CHAPTER 1. Construction Bonds 24950-24963

§ 24954

California Water Code · 2020-11 edition · updated 2026-10-04 · California

The surveys, examinations, drawings, and estimate may provide that the works necessary for a completed project shall be constructed progressively during a period of years.

(Added by Stats. 1943, Ch. 372.)

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — California Water Code

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.