DIVISION 2. WATER 1000-5976›PART 2. APPROPRIATION OF WATER 1200-1851›CHAPTER 6. Permits 1375-1410.2›ARTICLE 4. Application to Beneficial Use and Construction of Works 1395-1398
§ 1395
California Water Code · 2020-11 edition · updated 2026-10-04 · California
Actual construction work upon any project shall begin within the time specified in the permit, which time shall not be less than 60 days from the date of the permit.
(Enacted by Stats. 1943, Ch. 368.)
Get a plain-English answer with a citation back to this text.
Ask AI about this code