Skip to content

DIVISION 6. CONSERVATION, DEVELOPMENT, AND UTILIZATION OF STATE WATER RESOURCES 10000-12999›PART 2.6. URBAN WATER MANAGEMENT PLANNING 10610-10657›CHAPTER 3. Urban Water Management Plans 10620-10645›ARTICLE 3. Adoption and Implementation of Plans 10640-10645

§ 10640

California Water Code · 2020-11 edition · updated 2026-10-04 · California

(a) Every urban water supplier required to prepare a plan pursuant to this part shall prepare its plan pursuant to Article 2 (commencing with Section 10630). The supplier shall likewise periodically review the plan as required by Section 10621, and any amendments or changes required as a result of that review shall be adopted pursuant to this article.

(b) Every urban water supplier required to prepare a water shortage contingency plan shall prepare a water shortage contingency plan pursuant to Section 10632. The supplier shall likewise periodically review the water shortage contingency plan as required by paragraph (10) of subdivision (a) of Section 10632 and any amendments or changes required as a result of that review shall be adopted pursuant to this article.

(Amended by Stats. 2018, Ch. 14, Sec. 37. (SB 606) Effective January 1, 2019.)

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — California Water Code

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.